An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proyecto: Optimización de la Estrategia de Explotación para Formaciones de Arenas Compactas (Tight Gas) SLB representantes Ariel Exler

  2. Introducción Fases de un proyecto de desarrollo Sub-Proyecto de Caracterización de Reservorio - Optimización de fracturas Sub-Proyecto Plan de Desarrollo – Optimización de la Perforación Resumen Agenda

  3. Introducción – Triángulo de Recursos

  4. Introducción – Gas InSitu No Convencional

  5. La recuperación acumulada por pozo esta limitada por los bajos caudales de producción y la baja eficiencia de recobro, en comparación con escenarios de media y alta permeabilidad. Reducción de permeabilidad como consecuencia de reacciones matriciales entre la roca reservorio y los fluídos de perforación y fracturamiento. Para obtener un pozo comercial dos aspectos deben ser solucionados: Optimizar el recobro con diseños óptimos de completación y fracturamiento. Disminuir los costos de perforación, completación, fracturamiento y producción por pozo. Introducción – Desafíos

  6. Se planteará el Proceso de Optimización Económica (POE) para formaciones de arenas compactas (Tight Gas Sand) Se propone tratar de alcanzar una optimización del desarrollo del campo aplicando una metodología sistemática de trabajo, experiencia existente en el área y nuevas tecnologías. Para la correcta implementación del proceso POE implica la creación de un equipo multidisciplinario entre La Operadora (LO) y La Compañía de Servicio (LCS), potenciándose de esta manera el valor agregado generado. Introducción

  7. Descubrimiento y exploración - Sísmica y perforación. Apreciación - Well testing y perforación. Desarrollo del campo - Perforación y completación. Aumento y estabilización de la producción - Perforación infill, reparaciones. Declinación de producción - Perforación de sidetracks, reparaciones. Límite económico – Abandono. Fases de un Proyecto de Desarrollo - Generalidades

  8. Implementación Caracterización de Reservorio Plan de Desarrollo Monitoreo y control Fases de un Proyecto de Desarrollo - Generalidades

  9. Fases de un Proyecto de Desarrollo

  10. Desarrollo y Producción del Campo Equipo Multidisciplinario - LO / LCS

  11. Nuestro Caso Fases del Proyecto – Caracterización del Reservorio El fracturamiento hidráulico resulta clave para poder evaluar el potencial económico del campo

  12. Proyecto: Optimización de la Estrategia de Explotación para la Formaciones de Arenas Compactas Sub-proyecto: Optimización de Fractura Etapa de Pre-Estimulación Caracterización de reservorio Caracterización de reservorio Diseño Plan de desarrollo Ejecución Implementación en campo Evaluación Monitoreo y control

  13. Potencial Económico Sub-proyecto Optimización de Fractura

  14. Etapa de Pre-Estimulación Diseño Ejecución Evaluación Sub-proyecto Optimización de Fractura

  15. Review Logs and Core Key Reservoir Profiles Reserves Review Sub-proyecto Optimización de Fractura Geological Data Reservoir Data

  16. Sub-proyecto Optimización de Fractura • Geological • Review structure and stratigraphy • Review depositional environment. • Reservoir • Review offset well data • Understand reservoir performance • Improve reservoir profiles-K, stress • Develop Mechanical Earth Model • Analyze post-treatment data • Perform post-treatment production data analysis • Design and analyze post-treatment pressure transient test • Geological • Review logs and core data • Understand impact of structure • stratigraphy and dep. Environment • Reservoir • Apply improved models-stress,K,etc. • Provide 3D data set for Stim design • Perform QA/QC • Ensure design criteria are met • Supervise implementation of pumping schedule • Analyze diagnostic tests • Real-time job monitoring • Incorporate into next completion design • Improve reservoir and completion model accuracy • Reduce cycle time and well costs • Optimize production • Run appropriate lab tests • Use improved reservoir models • Utilize Prod. solutions design applications • Calculate NPV’s of design options • Optimize stimulation treatment • Design and analyze PVT • Material balance • Analyze production performance • Make performance forecasts • Treatment type selection • Perforation Optimization • Matrix Acid • Acid or Proppant Fracture • Sand or Water Management • Well architecture • Recommend perforation interval • Optimize casing and tubulars • Revise performance forecast • Production or Artificial lift systems • Evaluate technology options

  17. Reporte de Información y Decisión - Rápida visualización

  18. Relevamiento de Datos Pre-Perforación Fase While Drilling Real vs. Plan Sub-proyecto Optimización de Perforación

  19. Relevamiento de Datos Pre-Perforación Fase While-Drilling DrillMAP Plan Ventana de Presión Poral Visualización 3D Pronóstico DrillCAST RiskTRACK Información zonal Comparar Real vs. Planeado Sí, Continuar Información de pozos vecinos Correcto No,Diagnosticar y Corregir Modelo Geomecánico ComparaciónWellTRAK Análisi de Sísmica Capturar Aprendizaje Revisar Plan Base de Datos RiskTRACK Generalidades del Proceso

  20. Fase While-drilling utilizar ingeniería de monitoreo, comunicar planes proactivos y capturar lesiones aprendidas. Pre-Perforación desarrollar un modelo Geomecánico y DrillMap. Relevamiento de Datos relevamiento de la información disponible, y su relevacia en el proceso de construcción de pozos. Relevamiento de Datos relevamiento de la información disponible, y su relevacia en el proceso de construcción de pozos. Relevamiento de Datos Completado Interacción con Eq. de Op. Disminuir Riesgos Incorporar Contigencias Capturar lesiones aprendidas & actualizar modelo Recopilación de Información Recopilación de Información Interface Equip. / Oficina “Plan vs. Real” Ensamblar Información Conocimiento Actual Ensamblar Información Conocimiento Actual Realizar Plan del Pozo Realizar Plan del Pozo Revisar Plan para Identificar Peligros Construir Modelo Geomecánico Primer borrador de “Living Well Plan” Charlas Iniciales LO - LCS Relevamiento de Datos Relevamiento de Datos Fase de Pre-Perforación Fase While Drilling Sub-proyecto Optimización de Perforación

  21. Revisión de datos Geológicos Catálogo de datos disponibles Evaluación y Visualización de Riesgos Sub-proyecto Optimización de Perforación

  22. Ejemplo de Proyecto

  23. Se planteó el proyecto global y las fases a ser consideradas para un potencial desarrollo del campo La estimulación por fracturamiento hidráulico resulta imprescindible para producir el reservorio Los sub-proyectos Optimización de Fractura y Optimización de la Perforación, resultan fundamentales para poder definir el marco económico de futuras optimizaciones (Plan de Desarrollo, Implementación, Monitoreo y Control) Se estableció y establecerá una metodología de trabajo de proyecto para cada uno de los puntos necesarios en el desarrollo del campo Resumen