An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITPA Confinement Database and ModelingProposals for Coordinated Research in 2004 • Brief reports/discussion to update progress and plans on 2005 proposals: • CDB-2 Confinement scaling in ELMy H-modes: b degradation • CDB-3 Improving the condition of Global DBs: H data • CDB-4 Confinement scaling in ELMy H-modes: n* scans • CDB-5 Inside and vertical pellet launch: ELM behaviour • CDB-6 Improving the condition of Global DBs: Low A • CDB-7 Ohmic identity experiments: test of scaling • Initial discussion of extensions and new proposals for 2005: • To be developed in more detail during Fall 2004 meeting

  2. CDB-2 Confinement scaling in ELMy H-modes:b degradation • High Priority Issue: • Resolve difference between b scaling of global confinement databases and machine parameter scans • Initial proposal for 2004 collaboration: • Scan with mainly RF, i.e. to vary Te/Ti for more ITER like conditions on AUG (F. Ryter) • Extend scan to b limit on JET (G. Cordey) • Response at November IEA Collaboration meeting in Naka: • High level of commitment: JET (Cordey), NSTX (?),JT-60U (?) • Will consider proposals: MAST (?) • Unlikely at this stage: AUG (Ryter), DIII-D (Petty) • Present status:

  3. CDB-3 Improving the condition of Global DBs:H data • High Priority Issue: • Though there is some H data in the Global H-mode DB (AUG 4%, DIII-D 5%, JET 4%, C-Mod 0%, JT60U 0%) there is no H data in the pedestal DB • Request one full hydrogen ELMy H-mode programme on each device, with particular emphasis to be placed on pedestal measurements • Initial proposal for 2004 collaboration: • JET and JT-60U to analyze H data • Response at November IEA Collaboration meeting in Naka on 2004 expts: • High level of commitment: JET (Cordey), JT-60U (?) • Unlikely at this stage: AUG (Ryter), DIII-D (DeBoo) • Present status:

  4. CDB-4 Confinement scaling in ELMy H-modes:n* scans • High Priority Issue: • Determine whether n* or n/nG is the appropriate dimensionless parameter for global scaling • Initial proposal for 2004 experiments: • JET (G. Cordey) and C-Mod (J. Snipes) to maximize range in n*, and provide a basis for experiments to be considered by JT-60U (T. Takizuka) and DIID-D (C. Petty) at intermediate n* • Response at November IEA Collaboration meeting in Naka: • Will consider proposals: AUG (Ryter), C-Mod (Snipes), DIII-D (Petty), JET (Cordey), JT-60U (Takizuka) • Present status:

  5. CDB-5 Inside and vertical pellet launch:ELM behaviour • High Priority Issue: • Test the effect of pellets on ELMs to see if the DW/Wped vs collisionality scaling is similar on the different machines (see Polevoi NF 2003). • Initial proposal for 2004 collaboration: • Try to match as closely as possible on DIII-D and AUG the JET pedestal conditions from earlier pellet experiments (no pellet experiment on JET in 2004?). • Response at November IEA Collaboration meeting in Naka: • High level of commitment: HT-7 (?), JT-60U (?), MAST (?) • Will consider proposals: DIII-D (Baylor), JET (Saibene), HL-2A • Unlikely at this stage: AUG (Lang) • Present status:

  6. CDB-6 Improving the condition of Global DBs:Low A • High Priority Issue: • Scaling of tE and pedestal characteristics are uncertain due to narrow range of A - global ELMy confinement and pedestal data at low A is needed • Initial proposal for 2004 collaboration: • Compare discharges with similar engineering parameters (e.g., R, A, Ip, Bt, Pheat, shape, etc) in both L-mode and H-mode on MAST (R. Akers, A. Kirk), and NSTX (S. Kaye, R. Maingi). Use center stack as limiter in L-mode. Tune H-mode carefully to ensure similar ELM behavior. Determine variation in both core and pedestal stored energies. Prepare for subsequent dimensionless variable scans to understand dependence of tE on b and r*. • Response at November IEA Collaboration meeting in Naka: • High level of commitment: MAST (Akers), NSTX (Kaye) • Present status:

  7. CDB-7 Ohmic identity experiments:test of scaling • High Priority Issue: • Does the principle of characterizing confinement in terms of dimensionless parameters work under Ohmic conditions? • Initial proposal for 2004 collaboration: • Match dimensionless parameters of AUG (F. Ryter), TS (F. Imbeaux), FTU (M. Romanelli), TCV (H. Weissen) Ohmic shots/sequences in JET (G. Cordey) to test scaling. Possibly include C-Mod? • Basically, each machine will bring its best Ohmic cases to JET and JET will try to match them. • Response at November IEA Collaboration meeting in Naka: • High level of commitment: FTU (M. Romanelli), JET (Cordey), HL-2A (?) • Will consider proposals: C-Mod (Snipes), TCV (Weissen), Tore Supra (Imbeaux) • Unlikely at this stage: AUG (Ryter) • Present status: