1 / 18

LYRA on-board PROBA2

LYRA on-board PROBA2. in-orbit operations and achievements. M. Dominique, J.-F. Hochedez et al. PROBA2 Workshop ESTEC, 2010/06/22. Routine activities. Nominal acquisition: Unit2 Integration time = 50 ms Calibration Dark current LED signal Back-up acquisition

ward
Télécharger la présentation

LYRA on-board PROBA2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LYRA on-board PROBA2 in-orbit operations and achievements M. Dominique, J.-F. Hochedez et al. PROBA2 Workshop ESTEC, 2010/06/22

  2. Routine activities • Nominal acquisition: • Unit2 • Integration time = 50 ms • Calibration • Dark current • LED signal • Back-up acquisition • Acquisition with units1 and 3 • Flat-field analysis • Off-pointing sequence • Bake out - decontamination • Switch on of heaters (temperature reaches 50°C) Nominal Weekly Monthly Monthly Once every 6 months

  3. Nominal acquisition

  4. Flares • Lyra senses flares down to B1.5 at least • LYRA list of flares is in agreement with the one of GOES • Always visible in the two XUV-EUV channels • Some strong and impulsive flares are also visible in Lyman-alpha, which can then be used as a precursor

  5. Flares • M2.0 flare 2010/02/08 – 22h33

  6. Calibration sequence • More than one orbit needed to MSM detectors to reach stabilization. • No significant difference between the LED signal at the beginning of the mission and the current one → the degradation is affecting the filters and not the detectors UV LED Dark current VIS LED Dark current UV LED VIS LED

  7. Back-up acquisition UNIT 2 UNIT 1

  8. Back-up acquisition UNIT 2 UNIT 3

  9. Flat-field paving • Paving step : 0.3° • The Hz channel signal doesn’t fit the modeled behavior based on pre-launch flat-field measurements slight imprinted degradation ???

  10. Bake-out • AB + CD heaters on for 24h • Temperature increase of 10° No significant effect on the data Next attempt: July 01

  11. Specific campaigns • Occultations • Sun-Moon eclipses • Stray light analysis • SDO/EVE cross-calibration campaign Every orbit till March January 15 (annular from LYRA) July 11 (partial from LYRA) March 18-19 (still under analysis) May 3 (still under analysis)

  12. Ly alpha Hz Al Zr Occultations • Lyman alpha completely absorbed • Contribution of longer wavelengths Attitude change

  13. Sun-Moon eclipse • Attitude change • Occultation • Disappearance and appearance of the active region behind the lunar disk

  14. EVE aging effects are tracked by flying the same instruments on-board a rocket 1x/year LYRA cross-calibration campaign was scheduled during the first rocket flight Cross-calibration with SDO/EVE 200 220

  15. LYRA on-board PROBA2 ANNEXES

  16. Spacecraft maneuvers SAA Auroral Oval • Perturbations appearing around 75° latitude • 2-3 days after a CME, flare ... • Associated to geomagnetic perturbations • Only in Al and Zr

  17. And a fifth channel at 17.4nm... ... called SWAP!

  18. State of the data processing pipeline fits fits fits Current state In the future Telemetry packets Not distributed Not distributed LY-TMR: Raw data (in counts) LY-EDG Daily basis After each contact Lv1: Engineering data (in Hz) LY-BSDG fits Not available After each contact Lv2: Calibrated data (in W/m²) Plots + flare list available irregular systematic Other tools Higher level data products

More Related