1 / 7

Slim hole Production Forrest Collier and Bill Hearn

Slim-hole production offers a less expensive and extended drilling program, with conventional tubing options limited. Explore artificial lift methods and their effects on production and cost.

williamsonn
Télécharger la présentation

Slim hole Production Forrest Collier and Bill Hearn

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Slim hole ProductionForrest Collier and Bill Hearn

  2. Slim-hole Less Expensive to drill and complete Extends drilling program due to less cost Conventional More Reserves Pro’s

  3. Slim-hole Production tubing options limited to either 2 1/16” IJ or 1 ½” or coil tubing Limited Artificial Lift Options. Conventional Cost to Drill Completion cost Con’s

  4. Artificial Lift Methods for Slim-Hole • Compression • Lower’s Critical Rate • Increases Production (usually) • Reduces Hydrate tendency • Increase’s other forms of lift options May not help unless post compression rate is greater than critical.

  5. AL Methods Continued • Plungers • Continuous flow plungers popular in slim hole but require velocity • Casing Plunger experience is limited at this time. • Conventional must be operated similar to Packer completions and must have significant GLR to produce (1000 scf/bbl/1000ft)

  6. AL Methods Continued • Cap Strings w/ Surfactant • Plugging has been an issue • Can be used in conjunction with bottom hole pressure equipment to measure Flowing bottom hole pressure. • Has not been automated much but it is considered to be an option. • Velocity Strings • Considered the easy option as there is relatively little operator effort needed if above critical. • Corrosion can be a concern. • Seamless is a good option for future plunger lift.

  7. AL Methods Continued • Rod Pump • Pump up 2 1/16” tubing with small rod string up to 30 bpd. • 1” Rod Pumps (actuate the tubing string) produce up the tubing string. • Limited experience but could be a good way to go check into work done by EOG.

More Related