1 / 1

Platform

T-LHA(R) (LHA-7/8). Platform. Description. Displacement, Full (LHD) 44,971 lt Speed 22.2 kts Length 844 ft Beam 106 ft Draft 28.82 ft (Full Load) Crew 285; Standing Detachment 99 Troop Lift ~5,132 Med Capability 4 ORs; 16/45 ward beds

willow-roy
Télécharger la présentation

Platform

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T-LHA(R) (LHA-7/8) Platform Description Displacement, Full (LHD) 44,971 lt Speed 22.2 kts Length 844 ft Beam 106 ft Draft 28.82 ft (Full Load) Crew 285; Standing Detachment 99 Troop Lift ~5,132 Med Capability 4 ORs; 16/45 ward beds Surface Interface Well 0 Flight Deck 9 CH-53K Spots Elevators 1 Port (37 ½ t); 1 Starboard (37 ½ t) Hangar Bay / High Bay 30,542 ft2 / Two 7 Frame High Bay (49 ft) Vehicle Square 19,112 ft2 Cargo/Ammo Cube 145,963 ft3 Cargo Fuel (JP-5) 1,300,000 gal 2 T-LHA(R) New Build Program Status Issues • LHA 7/8 (LHA 6 Class Ship), is the center piece in the MPF(F) squadron. • It’s weapons systems will be reduced in comparison to the Amphibious Assault Ship of the Assault Echelon as indicated with (T) designation. • Program to enhance the amphibious aviation capability-meet increased demand created by advanced aviation platforms distributing the MEB ACE. • LHA 7 supports MEB ACE (12 MV-22B, 8 CH-53K, 9 AH-1Z, 6 UH-1Y) • LHA 8 supports MEB ACE (24 MV-22B, 9 AH-1Z, 3 UH-1Y) • LHA-7/8 planned w/o well-deck • Procurement of LHA-7 (FY10) and LHA-8 (FY13) are currently programmed as MPF(F) big decks • CDD plans ship in Increment 2 • CDD planned staffing - Jan 08 • Acquisition Program: Milestone B TBD. • Program of Record is for 2 ships • Last ship to be delivered in FY-18 • FY13 LHA(R) is currently unfunded • No Self Defense Systems; “Sea-Shield” protection • Civilian Crewed • The 3rd planned MPF(F) big deck will be the Bataan (LHD-5). Scheduled to transition in FY-22. • Source: N8F/N85 30 year ship build plan and PEO USMC Liaison

More Related