An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Quality & Supplier Management March 2008 Mike Gillette IPIC Quality Assurance Manager Northrop Grumman Corporation

  2. Quality & Supplier Management Outline • History • Early Involvement • Proposal • ASMB • RFP • Source Selection • SDD • Production

  3. 1957 1959 1961 1957 1964 1989 1968 1983 2000 SICBM Atlas Thor Titan MM I MM II MM III PK MM III SLE • 1950s • Atlas 1st Launch (1957) • Thor 1st Launch (1957) • Titan 1st Launch (1959) • 1960s • MM I 1st Launch (1961) • MM II 1st Launch (1964) • MM III 1st Launch (1968) • 1970s • PK Go-Ahead (1972) • 1980s • PK 1st Launch (1983) • SICBM Go-Ahead (1983) • PKRG Go-Ahead (1986) • SICBM 1st Launch (1989) • 1990s • REACT • GRP • PRP • ICBM Prime Award (1997) • 2000+ • MMP • PSRE • SERV • REACT SLEP • Hold Targets at Risk • Provide Deterrence Against Attack • Rapid Receipt and Response to Emergency Action Messages (EAMs) • Flexible Response Against Our Enemies Should Deterrence Fail A Critical National Asset In An Uncertain World ICBMs Continue To Be Important To Our National Defense ICBMs – A continuing Success Story • ECS • ISMP • ICU

  4. Supplier Management • No quality escapes to the field • Quality is built-in, not inspected-in • Over 3500 end items delivered to field since 2002 with essentially no quality issues Objectives Results 1

  5. Process for Supplier Management Role of Program Manager and Engineers - Production • Conduct program reviews every 6-8 weeks • Cost, Schedule, Technical, Risk and Corrective Actions to Variances • Approve Class I changes • Review Class II changes • Attend selected on-site joint reviews of sub-tier suppliers Role of Program Manager and Engineers – Pre Award and Design • Conduct program reviews monthly • Cost, Schedule, Technical, Risk, and Corrective Actions to Variances • Conduct independent technical review for design reviews/audits • Establish Weapon System Integration test procedures • Monitor progress toward production readiness Functional and Physical Configuration Audits Critical Design Review Acquisition Planning Low Rate Production Full Rate Production Deliver Accepted Products Contract/ Subcontract Awards Weapon System Integration Testing Production Readiness Reviews Role of Quality Engineers - Production • Participate in on-site joint reviews of sub-tier suppliers • Conduct on-site inspection of process compliance during each site visit • Establish and monitor corrective actions when necessary • Conduct three-way (Government, Prime, Supplier) buy-off of products • Resolution of material & process discrepancies (MRB) Role of Quality Engineers – Pre Award and Design • Qualify supplier for specific work scope • Monitor supplier processes for compliance • Establish and monitor corrective actions when necessary • Team with first tier supplier on supply chain monitoring • Establish baseline for production qualification • As necessary, develop or disqualify supplier prior to production readiness review • End Item Data Packet definition to ensure traceability to requirements 2

  6. Early QA Involvement • Proposal Phase • Participate in Alpha Negotiations • QA Submits a Basis of Estimate • Participate in Supplier Proposal Evaluation • Approver of Contract Deliverables Definition • Participate in the Final Proposal Review

  7. Early QA Involvement • Acquisition Strategy Make Buy (ASMB) • SQE is a Signature • SEIT is a Participant • Request For Proposal (RFP) • Contains a Mission Assurance Requirements Document Written by SQE in Concert With MA Team • SQE Reviews the Request for Proposal • Supplier Selection • Pre-award Assessment • Participate in Source Selection

  8. Early QA Involvement • Review & approval of Supplier/Subcontractor QA Plans • Conduct Sub-tier Supplier Assessment • Support Formal Reviews • SRR • PDR • CDR • TRR • PRR • Qualification Testing • Support Functional and Physical Configuration Audits • Conduct First Article Acceptance • Incoming Inspection Verification • In-Process Audit and Inspection Verification

  9. Process Owner Reviews Failure Modes and Effects Analysis (FMEA) Develop/Review Work Instructions Define/Develop/Document Critical Processes Assist in Obtaining ISO Compliance Review and Verification of Audit Results/Findings Supplier Development Supplier Monitoring Supplier Audit IAW ISO9000/AS9100

  10. Supplier Monitoring • Surveillance Plan • Defines the Surveillance Program • Enforces the Mission Assurance Requirements • Surveillance Includes Mandatory Inspection Points • Production Processes • Focus on Process Improvement • Lean/Six Sigma • Quarterly Scorecard Input • Corrective Action

  11. Periodic Audits F = Frequent S = Seldom Development Production Calibration System S S Tool Control S S Internal/External QA Audit results F F Data Management S F Configuration Management F F Product Identification S S Metrics and Metrics Analysis S F Training Records S F Procurement System F S Corrective Action System F F Supplier Management F F MRB S F Supplier Surveillance • Surveillance Includes Periodic Audits

  12. Supply Chain Management • Product Acceptance • Verification That All Items Are Being Delivered • Hardware, Software, Documentation, Test Results, Spares, Data and Records • Verification That All Items Meet Contractual Requirements • Item Built IAW the Documented System • All Requirements Are Verified • Records Are Available • As-Built Configuration Is Controlled

  13. Supply Chain Management • Product Acceptance Continued • Define Data Package • As-Built Configuration (Indentured Parts List) • Proof of Traceability Requirements Having Been Met • Open Action Items Are Documented • Non-Conformances are Properly Corrected • Waivers and Deviations are Documented • Incorporated ECP’s Are Listed • Review Build Paper • Recording of Critical Parameters • Certificate of Conformance Accompanied With Objective Evidence • Incident Reports

  14. • • • • • • • • • • • • • • • • • • • • • • • • • • Supplier Management Works at IPIC ~ 650 Prime WAWF Sell-offs per year (multiple items & locations) • Summary • Early Participation in a Program • Mission Assurance Requirements Document Accompanies Every RFP • Assessments are Accomplished Upfront • Surveillance Plans are Defined and Followed • Product Acceptance/Delivery is Exhaustive and is Unacceptable Without Objective Evidence • Early Recognition of Supplier Development Requirements • Manage the Complete Supply Chain • Lessons Learned are Liberally Incorporated IPIC SQA Provides High Confidence in Fielded Product