1 / 11

Pascal/Saratoga Street Bicycle Route Connection

Pascal/Saratoga Street Bicycle Route Connection. Presented by: Mr. Michael Recycles Bicycles “Changing lives, one bicycle at a time.”. Enlarged Drawing of Project Area. Area inside oval shows where both Pascal Saratoga Streets will intersect with Ayd Mill Road Trail.

wmmcguire
Télécharger la présentation

Pascal/Saratoga Street Bicycle Route Connection

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pascal/Saratoga StreetBicycle Route Connection Presented by: Mr. Michael Recycles Bicycles “Changing lives, one bicycle at a time.”

  2. Enlarged Drawing of Project Area Area inside oval shows where both Pascal Saratoga Streets will intersect with Ayd Mill Road Trail. This will require purchase of a narrow strip of land to connect the intersection of Pascal and Dayton to the new trail, as well as adding a crossing over the railroad track. This provides a far safer north-south route than either Snelling or Hamline.

  3. Proposed Route Pascal Street Bridge over Tracks City-Owned Right Of Way Segment along Future Ayd Mill Road Trail

  4. View from Selby Ave Bridge Pascal Street

  5. View Showing Future Ayd Mill Road Trail

  6. Looking North From Intersection of Pascal and Dayton Marshall Avenue Current route on Pascal will be extended one block south from Marshall to Dayton Share the road signs will be installed on this block

  7. Intersection of Pascal and Dayton Install Bicycle and pedestrian connection at location currently used as a footpath A small strip of land will need to be purchased

  8. Looking South Down Footpath Trail connection will be installed along current footpath Connection will require crossing of railroad tracks Railroad traffic is around 5 trains per day

  9. Supporters • People For Bikes (National Advocacy Organization) • Union Park District Council • St. Paul Women on Bikes • Andy Singer (Local bicycle activist and nationally recognized cartoonist)

  10. Questions?

More Related