1 / 25

Supervised by : Dr.Khaled Al- Sahili Prepared by : Ethar Aqel - Saja Yameen Khaireya Soqia

Supervised by : Dr.Khaled Al- Sahili Prepared by : Ethar Aqel - Saja Yameen Khaireya Soqia. Graduation Project Traffic Management of Rafedia Main Corridor. Introduction.

wynn
Télécharger la présentation

Supervised by : Dr.Khaled Al- Sahili Prepared by : Ethar Aqel - Saja Yameen Khaireya Soqia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supervised by : Dr.Khaled Al-SahiliPrepared by :EtharAqel - SajaYameenKhaireyaSoqia Graduation Project Traffic Management of Rafedia Main Corridor

  2. Introduction • Corridor management is defined as the coordination of the individual network operations between adjacent facilities that creates an interconnected system capable of cross-network travel management. • The focus of this project is to study and analyze Rafedia Corridor (Urban Arterial Highway).

  3. Multilane Part

  4. Two Lane Part

  5. Methodology Data Collected Data Analysis Problem Definition Improvements Simulating Existing Conditions Recommendations Conclusions

  6. Geometric Data Maps 6 Traffic Volumes 1 5 Data Collected 2 4 Parking 3 Crashes Control Devices

  7. Traffic Analysis Geometric Analysis 6 LOS Analysis using HCS 1 5 Data Analysis LOS Analysis using Synchro 2 4 3 Crash Analysis Parking Analysis

  8. Simulating Existing Conditions • Rafedia Corridor and some adjacent streets were analyzed as one network using Synchro 7 program. • Depending on HCM 2000 & ICU 2003

  9. Rafedia st. / Omar Ibn Al-Khatabst. LOS : F

  10. Al-Kfairst. / Road 15 LOS : G

  11. 106-175crash 186.2 sec Omar Ibn Al-Khatab 88.6 sec QadriTuqan

  12. Evaluation of Traffic Conditions at Major Intersections

  13. 12:00PM , 453 veh

  14. Improvements • Alternative One • The Best Alternative • Alternative Two • Alternative Three

  15. Alternative One

  16. Alternative Two

  17. Consequences of Alternative Two • 20 % of public transportation was subtracted along the whole Corridor . • 10% of public transportation was subtracted along the Corridor from Al-Kfair Street / Soccer Field Street intersection to Al-Kfair Street / AkramZu'aiter Street intersection. • Prevent the parking in front of the main gate of new campus of An-Najah National University and converts it to the back gate of the university.

  18. Alternative Three

  19. Consequences of Alternative Three • 20 % of public transportation was subtracted along the Rafedia Corridor from Rafedia Street / Omar Ibn Alkhatab Street intersection to the end of Yasser Arafat Street. • Prevent the parking in front of the main gate of new campus of An-Najah National University and converts it to the back gate of the university.

  20. The Best Alternative

  21. Results of Best Alternative • Reduction of demand. • Acceptable LOS. • Reduction of Delay. • Smooth Movement. • Increase number of lanes at critical intersections.

  22. Conclusions & Recommendations • Install proper traffic control devices. • Install traffic signals on the recommended intersections • Regulate on-street parking along Rafedia Corridor & prevent the parking on some recommended locations. • Improve geometric design & pavement marking along Rafedia Corridor.

More Related