This report outlines the development of an innovative proximity-triggered dog training collar for improved behavior correction. The design aims to electrify a dog while maintaining a safe tethering mechanism to its owner. Key milestones include parts ordering, ultrasonic circuit design, and communication tests. Completing tasks such as breadboard implementation, power supply design, and RF transceiver coding demonstrates the project's progress. Future tasks involve testing unit communication and refining the ultrasonic system, ultimately enhancing dog training efficiency.
E N D
Proximity-Triggered Dog Training CollarStatus Report #4 Distance detecting behavior correction dog collar 2/13/2012 Team 10: HamadAldossary YagoobAlsarouj James Kopp Carlos Vazquez
Overall Need for Design • Expand on the currently available remote training collars by adding proximity detection, effectively electrically tethering a dog to its owner. • Milestones • Order parts (1/25/2012) • Unit to unit communication (2/17/2012) • Ultrasonic circuit design (2/20/2012) • Breadboard implementation (3/1/2012) • PCB implementation (3/15/2012)
Tasks Completed • Ordered additional parts (2/9/2012) • Shock unit, vibration, handheld I/O led and push buttons • Mobile breadboard power supply design and implementation (2/10/2012) • Used in testing breadboard design functionality • Microcontroller test circuit (2/4/2012) • AVR working, established programming procedure, tested I/O • Initial parts list ordered (1/28/2012) • Initial parts list finalized (1/20/2012) • RF transceivers acquired (12/15/2011)
Ongoing Tasks • Shock unit design • We’re using existing shocking circuit designs for reference • Ultrasonic system design • Big task for this week • Mobile power system design • Considering LED battery level indicator, considering rechargeable battery system • Microcontroller/RF transceiver code • Adapting AVR microcontroller code to work for our system • Website design • Continuing website design
Upcoming Tasks • In-field unit-to-unit communication test • Ultrasonic system implementation • Shock unit implementation • Mobile power system implementation
Functional Block Diagram Handheld Unit Buttons/Lights 50% µC 60% Power Supply 70% RF Transmitter 25% Ultrasonic Receiver 25% Collar Unit Shock Unit 75% Ultrasonic Transmitter 25% Power Supply 70% Vibration Unit 75% RF Receiver 25% µC 60% Sound Unit 75% Wired Wireless
Project Schedule 100% 40% 75% 50% 100%