An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IGG Agenda 12th October 2010 1

  2. Minutes Minutes from IGG meeting – 26th August 2010 2

  3. IGG Action Items Updated IGG Action List issued in advance of meeting • Actions closed since last IGG meeting: 11 • IGG Actions carried forward:13 3

  4. CER Update 4

  5. ESB Networks Update 5

  6. Gemserv Update 6

  7. MRSO Update 7

  8. RMDS Update Retail Market Design Update Conor Garrigan, RMDS 8

  9. Nov 2010 Market Release Documentation • Market Release Background • MCR0177 – DG4 DUOS Tariff for LA Public Lighting • MCR0081 – Billable devices only on Extranet • IPT starts on 18th Oct (UMS Suppliers only) • Go live on 21st Nov • For approval at today’s meeting • Assurance Approach v1.0 • IPT Scenarios v2.0 • Participant Questionnaire v1.0 (return by 18th Oct for non-IPT suppliers; otherwise return after IPT) • Market Approach to Cutover v1.0 9

  10. DR0181 – Adding MP Bus Ref to COLE reads on the 300 MM V1.0 • Requested Change • Provision of MP Bus Ref on 300 (and 300W) MM in response to 016 MM • Allows suppliers to uniquely identify the originating 016 MM • Field already on 300/300W MM so no schema impact • At today’s Meeting • For Approval 14

  11. MCR0179 – Downloadable Meter Point Details File V2.0 • Background • Previously reviewed at IGG • Re-versioned to accommodate CER concerns • “Contact Allowed” flag and “Contact Telephone” fields now removed • At today’s Meeting • For Approval 15

  12. CoS Objection Process - Update • Next Steps for RMDS from the last IGG meeting (26th Aug ’10) were: • Raise a Discussion Request • Analyse design elements and assess what is feasible to implement • A DR (DR 1020) has now been drafted and is undergoing review by ESB Networks for feasibility • RMDS anticipates having the DR ready for review at the next IGG in November ’10 16

  13. Update on Defect 10828 Defect 10828 – Failure of monthly batch job to download a list of Eligible customers for the Extranet • This defect has now been resolved and job will run on time from next month onwards. 17

  14. Update on IGG Action 645: Provide list of open Defects and timelines for delivery • RMDS has been actively reviewing the ISU list of open defects, including investigation of which defects are market-facing • The following defects are due to be resolved in the November release: • Defect 11687 (CoS) This was raised to address a particular issue with new Registrations where billing triggers were not being created for open Meter Reading Orders with a read date > = Orig Move-In date. This has been resulting in more than one set of readings appearing on a subsequent 300 Market Message • Defects 8814, 9210 (Unmetered) This was raised to address issues with the Unmetered process where the 700 Market Message was not being generated in some instances where it should have been RMDS will provide a more detailed update of open defects at the next IGG 18

  15. HRDS Work Programme – Outlook • Workshop on 26th October (Dublin, RMDS Offices) • HWG extraordinary meeting to accommodate workload arising from 15 DRs • IGG Prioritisation Workshop for ROI-Specific Requests 19

  16. ROI-Specific Prioritisation Workshop Objectives / Agenda /Logistics • Prioritise ROI-Specific requests from active HRDS Request List • Proposed date 26th October (same day as HWG Extraordinary meeting) • Open forum format 20

  17. IGG Meeting • AOB 21

  18. Next Steps • Proposed Diary dates for IGG meetings in 2010: 18.11.2010 - Dublin • Proposed dates are on Calendar of Events on RMDS website 22

  19. Next Steps Conference Calls • Thursday 28.10.2010 • Thursday 09.12.2010 Proposed dates are on Calendar of Events on RMDS website Call details are as follows: • Number: 01-6647602 PIN : 77640 • Contingency number remains: 01-6647777 PIN: 80490 23