1 / 17

Paradigm Shift

Paradigm Shift. Evolving NERC Standards Processes and Practices. Key Documents. Standards Committee Strategic Plan Standards Committee Strategic Work Plan 2013-2015 Reliability Standards Development Plan 2013-2015 . Standards Reform. Ultimate goal

yehuda
Télécharger la présentation

Paradigm Shift

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Paradigm Shift Evolving NERC Standards Processes and Practices

  2. Key Documents • Standards Committee Strategic Plan • Standards Committee Strategic Work Plan 2013-2015 • Reliability Standards Development Plan 2013-2015

  3. Standards Reform Ultimate goal • Focus on reliability - ensure that industry resources invested to develop standards are worthy of the output: a stable body of world class reliability standards NERC implemented changes: • Leadershipand staff changes • Standards department reorganization • Assessing compliance – Coordination with Standards • Reliability Assessment Initiative (RAI) • Drafting RSAWs during standards development • Standing up RISC

  4. Standards Reform • NERC Board resolution – November 2012 • Accountability • Drafting Team composition • Workflow/process • Work Plan (Reliability Standards Development Plan) • Additional changes being considered by SPIG • SPIG has been reconvened to assess status

  5. Areas of Strategic Focus From Standards Committee Strategic Plan (Draft): • Transition the current body of standards – Complete the transition to a stable, world-class set of clear, concise results-based standards that ensure the reliability of the bulk power system. • FERC Directives and Recommendations from the 2003 Blackout Report– Target a filing to resolve all currently outstanding FERC directives by the end of 2013. • Five Year Review of Reliability Standards –Complete any outstanding 5-year reviews of Reliability Standards. • Finish remaining open Standard projects – Focus project management on active and inactive Standard development projects to bring closure to these projects by the end of 2013.  Closure in some instances may involve a recommendation to stop some projects, consolidate projects or roll them into the Directives project.  Projects that cannot be completed by end of 2013 will have a specified completion date agreed to by the SC.

  6. . . . continued • Paragraph 81 and Results-Based Standards concepts – Apply Paragraph 81 (retire or modify FERC-approved Reliability Standard requirements that as FERC noted, "provide little protection to the reliable operations of the BES", are redundant or unnecessary) and Results-Based Standards concepts across the above mentioned major work areas during their completion. • Existing or Emerging Issues and Reliability Risks – Address emerging risks to the bulk power system by developing high quality and technically sound Reliability Standards, as needed, and in a timely manner. • Maintenance of Existing Reliability Standards – Continue to review existing Reliability Standards to ensure the standards remain up-to-date. Provide interpretations on Reliability Standards as required in the Standards Process Manual. • Compliance Input – Provide technical expertise and feedback on NERC’s compliance program, including Compliance Application Notices (CANs), Compliance Analysis Reports (CARs) and Reliability Standards Audit Worksheets (RSAW), etc.

  7. RISC • RISC committee formed and now active. • “Reliability Issues Steering Committee” • Reports to NERC Board of Trustees • Identify and triage reliability issues • RISC solicits “nominations” of reliability issues • Can initiate a range of reliability solutions: Standards, Guidelines, NERC policies, etc. • Considers findings from system events, lessons learned, risk trends • Includes consideration of scope, prioritization, cost v. benefit, etc.

  8. RISC Membership • 12 Members • 4 from MRC • 2 at-large (stakeholders) • 5 from committees • SC, OC, PC, CIPC and CCC • Senior NERC staff (non-voting) • Geographic and sector diversity

  9. Standards Committee Strategic Work Plan 2013-2015 Key tactical recommendations: • SC is accountable to NERC BOT • Deliver high-quality and timely standards • Effective management of process • Term limits on SC leaders • Smaller, more agile, committed SDTs • No more than 10 people • Facilitator/project manager, SMEs, technical writer/lawyer • Form pool of SMEs for each standards category • NERC staff or writer “holds the pen” and consults with SDT; SDT approves draft

  10. . . . continued • Aggressively oversee and manage the workflow and effective use of the Standards development process • Address directives • Satisfy 5-year review requirement • Prioritize existing projects and emerging issues • Integrate with RISC efforts • Engage NERC technical committees • Enhanced consensus-building • New SC Project Management/Oversight committee • Address training, processes and procedures (including subgroups) • Collaborate with NERC Compliance staff

  11. Reliability Standards Development Plan 2013-2015 • Approved by BOD on 12/19/12. • Significant revision of NERC’s approach to managing the standards development workload. • Initiatives: • Paragraph 81 phase 2 • Results-based Standards • Internal Controls integration/eliminate zero-defect requirements • Concurrent development of Compliance tools, such as RSAWs

  12. NERC Technical Committees • Increased engagement between the Standards Committee and the NERC technical committees • ensure that reliability standards are technically sound • build industry consensus as NERC accelerates the transformation of the current standards to a body of world-class standards • ensure the reliability of the bulk power system.

  13. Standard Processes Manual • Revisions based on SPIG and Board recommendations. • Standards Process Improvement Group • SPM Revisions passed ballot in December.

  14. Standard Processes Manual Key Revisions: • Streamline the work of drafting teams in responding to comments • Negative ballots without comments (submitted either individually or as part of a group) count toward quorum but not consensus • Emphasis on developing informal consensus prior to formal balloting • Clarification of the handling and purpose of interpretations • Limited waiver provision

  15. Questions?

More Related