SlideServe
Menu
Préférences
© SlideServe · v2026

A Feature-Based of IT Automation using Kaseya andAuslogics Registry Cleaner

yeriel avatar
8 diapositives · 241 Views · Jul 10, 2014

A Feature-Based of IT Automation using Kaseya andAuslogics Registry Cleaner. Developed By: Krystle Crawford Advisor : Dr. S. Masoud Sadjadi School of Computing and Information Sciences Florida International University kcraw001@fiu.edu http://www.cs.fiu.edu/~sadjadi/ . Agenda.

A Feature-Based of IT Automation using Kaseya andAuslogics Registry Cleaner - slide 1
01 / 8A Feature-Based of IT Automation using Kaseya andAuslogics Registry Cleaner
1 / 17

Télécharger la présentation

A Feature-Based of IT Automation using Kaseya andAuslogics Registry Cleaner
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. A Feature-Based of IT Automation using KaseyaandAuslogics Registry Cleaner Developed By: Krystle Crawford Advisor : Dr. S. Masoud SadjadiSchool of Computing and Information SciencesFlorida International University kcraw001@fiu.edu http://www.cs.fiu.edu/~sadjadi/

  2. Agenda • Problem and Motivation • Solution • Behind the Scene • Customizing the Solution • Disclaimer • Progress Report

  3. Problem and Motivation: • Registry keys are added or edited every-time something changes on your computer whether it be changing sound levels, installing or uninstalling software, opening applications, changing display settings on the screen or many other things. When these keys are no longer used they can accumulate and leave spaces in the registry which result in damage, fragmentation or corruption. As a result this slows down the computer performance.

  4. Solution • An agent procedure can be created on Kaseya that will install a custom package with the Auslogics Registry Cleaner software and run it automatically once a month during the early hours of the morning.

  5. Behind the Scene • Since the registry is a delicate part of the operating system, the first thing the registry cleaner does is make a backup of the everything on the computer to create a restore point. • It then does a detail scan of the registry and fixes any errors that it finds. • At the end it shows a progress report to show how many errors were fixed out of all that were found and by what percentage the system’s performance was improved by.

  6. Customizing the Solution • Due to the fact that the Mac OS does not have a registry, the solution can’t be customized for fixing registry errors. However, this operating system does tend to have slow system performance at times. Therefore, the agent procedure can be altered to run the Disk Utility on the Mac OS to perform a permissions repair. This goes through the system and repairs any system errors.

  7. Disclaimer • Please be advised that this current agent procedure will not work on a Mac OS. It is formulated for Windows operating systems ONLY! • No other program can be in use when this procedure is being executed else you can have a huge risk of crashing your operating system.

  8. Progress Report • Currently, I have downloaded a version of the software that should be able to work without a product key. • I will be testing it on a virtual machine to ensure that it works properly else I will use an alternate software that was found in my research called Ccleaner. • I have not began writing the stored procedure as yet, but will begin doing so after the software has been tested.