1 / 11

Data Capturing Infrastructure

Data Capturing Infrastructure. Stathis Plitsos, AUEB-RC. Architecture High point of view. Architecture drill down. Data Acquisition / Collection. ARTISAN must be able to deal with two different cases Embody existing Energy Management Systems, e.g. Barco-Vision ‘ Energy-Master’

yoko
Télécharger la présentation

Data Capturing Infrastructure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Capturing Infrastructure Stathis Plitsos, AUEB-RC

  2. Architecture High point of view

  3. Architecture drill down

  4. Data Acquisition / Collection ARTISAN must be able to deal with two different cases • Embody existing Energy Management Systems, e.g. Barco-Vision ‘Energy-Master’ • Use ‘open-solutions’

  5. Embody Existing EMSs Data Acquisition module able to • Collect energy consumption data from the installed EMS; • Send these data to Data Repositories Layer.

  6. Barco-Vision EMS Components

  7. Using ‘Open Solutions’ • Embody different types of metering equipment compliant with international standards • Metering devices • ABB • Schneider-Electric • ….

  8. ABB

  9. Schneider-Electric

  10. Next steps Focus on two topics • Software • Develop an additional tool that embodies existing EMSs and their software issues (e.g., MC’s case) • Lab testing of any software developed so far. • Hardware • Installation of metering devices where needed (e.g., Piacenza) • Testing of software with real data.

  11. Time-plan (indicative) • Main goal: to show ARTISAN Service 1 in the 1st review meeting; • Hence: real-time energy data capturing has to be implemented until end of September; • Same applies for the installation of metering devices and the interconnection with the EMS of the users.

More Related