1 / 9

Zhongshan Plant Introduction Marketing, ThyssenKrupp Elevator China Field

Zhongshan Plant Introduction Marketing, ThyssenKrupp Elevator China Field. Zhongshan Plant Introduction. Plant Background … Basic Introduction. Zhongshan Plant set up in 1995 as a joint venture company and put into production from 1996. It’s a 100% German holding company from 2003

Télécharger la présentation

Zhongshan Plant Introduction Marketing, ThyssenKrupp Elevator China Field

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Zhongshan Plant Introduction Marketing, ThyssenKrupp Elevator China Field

  2. Zhongshan Plant Introduction

  3. Plant Background … Basic Introduction • Zhongshan Plant set up in 1995 as a joint venture company and put into production from 1996. • It’s a 100% German holding company from 2003 • By now, Total Investment: 31,420,000 US $ • Registered Capital: 18,420,000 US $ • Investment Shares: 100% ThyssenKrupp Elevator AG • Factory Area Complete: 36,300 m2 • Workshop Area: 10,000 m2 • Manpower: 365 (Updated on Sep.30, 09)

  4. Factory Manufacture Equipments • Wiedemann CNC turret punch press machine (USA) • Mubea punch machine (Germany) • Haemmerle 3-point bending machine (Switzerland) • Jean Perrot Industries bending machine 2530 (France)

  5. Factory Manufacture Equipments • ESD Compliances Electrical Workshop with an area of 781m2 and a total investment of RMB 1.06 million can increase the production capacity to 10,000 units/year • Controllers are Functional tested by simulator and Insulation-resistance tester

  6. Plant Background … History •  1995, Zhongshan Plant set up •  1996, the first elevator contracted •  1999 , Thyssen and Krupp merge •  2000, company 's name changed to Thyssen Elevators Co., Ltd. •  2000, passed the ISO9001 & ISO14001 •  2002, TE-Evolution new product was released •  1997, after the transfer of rights, Zhongshan Elevator & Industrial companies and ThyssenAufzüge own the corporate interests with 20% and 80% respectively •  2003, TE-HP61 & Decentralized MC3 control box were released •  2003, ThyssenKrupp Elevator AG holding interests share 100% •  2004, passed the CWB • 2005, increase the registered capital to $18.42 million • 2006, passed OHSAS18001 • 2007, increase the registered capital to $31.68 million • 2009, new electrical workshop was set up with an area of 781m2 and a total investment of RMB 1.06 million

  7. Plant Background … Qualified License Manufacture License

  8. Plant Background … Qualified License ISO 9001/14001, OHSAS 18001 issued by TÜV

  9. Thank you for your attention

More Related