1 / 6

Energistics Technical Architecture Work Group

Energistics Technical Architecture Work Group. Orientation Meeting. Intellectual Property Participation indicates agreement to abide Do not disclose confidential Disclosures are deemed public Contributions are made with grant of rights to use, modify, etc. Competitive Information

Télécharger la présentation

Energistics Technical Architecture Work Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energistics Technical Architecture Work Group Orientation Meeting

  2. Intellectual Property Participation indicates agreement to abide Do not disclose confidential Disclosures are deemed public Contributions are made with grant of rights to use, modify, etc. Competitive Information Do not disclose pricing, costs, sales, plans, schedules, etc. Or your participation may be terminated If you are uncomfortable regarding such legal matters, leave the meeting and report your concerns. Energistics Meeting Policies

  3. Agenda • Introduction • Energistics Standards Panorama / History / Participants • Web Services Interoperability Standards v1.0 • WITSML Version 1.x Services / Data Specifications • PRODML Version 1.x Services / Data Specifications • RESQML plan • Adjacent Technologies and External Specifications • Subjects for Subsequent Meetings • Candidates for Next Stage Deliverables • Next Steps • Adjourn

  4. Attendees (* - WSIS V1 Participants) • Atman Consulting • BP * • Chevron * • Energistics * • ETL Solutions • ExxonMobil * • Geologix • Halliburton • Infosys • Kongsberg • Oxy * • Roxar • SAIC * • Shell * • Sirius Solutions • Smith International • Technomation • Total • Wipro

  5. Meeting Purpose • Orientation to IT Architecture Aspects of • WITSML Standards for drilling, completion and maintenance • PRODML Standards for production operations, optimization and reporting • RESQML Standards for earth models and reservoir models • First Phase: Web Services Interoperability Standards, Version 1.0 (12/22/2008) • Next Phase • Begin discussion • In the areas of further enterprise IT architecture specifications, endorsements and/or guidelines

  6. Energistics Subject Areas Asset/DataManagementSIG eRegulatory SIG AssetManagement <RESQML/> Reservoir Reservoir Production Production SIG Geology SIG Engineering Engineering Geology Geology Expl Expl Petrophysics Petrophysics Petroleum Petroleum Geology Geology Engineering Engineering • Industry Services SIG • Technical Architecture • Energy Identity Trust Drilling Drilling Production Production Facilities Facilities Engineering Engineering Engineering Engineering Engineering Engineering <energyML/> Completion & Drilling Drilling Completion & Production Production Geophysics Workover Operations Geophysics Operations Workover Operations Operations Geophysics SIG <WITSML/> <PRODML/> SIG SIG

More Related