Street Lighting and Electric System Undergrounding

Street Lighting and Electric System Undergrounding. Proposed Amendment to PMC Chapter 13.14 Underground Utility Districts. UG District Process. PHASE I - District Creation PHASE II - District Formation PHASE III – Design PHASE IV – Construction Street Lighting Installation

Télécharger la présentation

Street Lighting and Electric System Undergrounding

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Street LightingandElectric System Undergrounding Proposed Amendment to PMC Chapter 13.14 Underground Utility Districts

  2. UG District Process • PHASE I - District Creation • PHASE II - District Formation • PHASE III – Design • PHASE IV – Construction • Street Lighting Installation • Infrastructure Installation • Private Property Conversion • Underground System Connection • Removal of Overhead Wires and Poles • Street Resurfacing Project

  3. Current UG Process • Underground Conversion (Private Property) • Owner Responsibility • Option #1 - Hire Electrical Contractor • Option #2 - Owner Installation • Submit Reimbursement Claim Form to include copies of invoices and receipts.. • Current City rebate of $3,000 or the lesser actual cost of the work for Power ONLY!

  4. Program Advantage • Underground Conversion • Option #3 – Pilot Program • Utilizing Pasadena Local First • Electrical Contractors • Right of Entry • Signed by Property Owner

  5. Example #1

  6. Example #2

  7. Advantages • Pilot Program Advantages • Eliminate Property Owner Financial Involvement • Expedite Connection Schedule to Underground System • Expedite Removal of Overhead Wires and Poles • Employment opportunities for Pasadena Local Contractors

  8. Recommendation • Amend PMC, Chapter 13.14 • The City will pay the cost to install the necessary conduits, wiring and other materials required to convert and connect private properties to the underground system. • Property Owner must utilize City’s Contractor • Property Owner must sign Right of Entry