Software Metrics and Measurements Supannika Koolmanojwong CS577
Outline • General Concepts about Metrics • Example of Metrics • Agile Metrics • Case Studies • Metrics from Empirical Data – Northrop Grumman • Metrics in IT services – Lockheed Martin
http://www.teamqualitypro.com/software-metrics/do-you-know-your-abcs-of-software-metrics/http://www.teamqualitypro.com/software-metrics/do-you-know-your-abcs-of-software-metrics/
Objectives of software measurement • “You can not control what you cannot measure.” – Tom DeMarco • “Not everything that counts can be counted. Not everything that is counted counts.” – Albert Einstein
Software Metrics • Numerical data related to software development • Strongly support software project management activities • Can be directly observable quantities or can be derived from one
A simplified measurement information model Information products Decisions / Actions Measurements Information needs Information Needs, Objectives, Control Attributes Process Work Products Results Ref: Ebert and Dumke 2007
How the software measurements are used? • Understand and communicate • Specify and achieve objectives • Identify and resolve problems • Decide and Improve
Measurement Standard How to do How to do better ISO/IEC 12207 Software Life Cycle Processes ISO/IEC 15288 System Life Cycle processes SWEBOK Software Engineering Body of Knowledge PMBOK Project Management Body of Knowledge CMMI Capability Maturity Model Integration ISO 15504 Software Process Capability Determination ISO 9001 Quality Management System ISO/IEC 9126 Software Product Quality TL 9000, AS 9100, etc. Objectives adaptations How to measure what you are doing ISO/IEC 15939:2002 Software Measurement Process
Ground rules for a Metrics • Metrics must be • Understandable to be useful • Economical • Field tested • Highly leveraged • Timely • Must give proper incentives for process improvement • Evenly spaced throughout all phases of development • Useful at multiple levels http://www.stsc.hill.af.mil/resources/tech_docs/gsam3/chap13.pdf
Measurements for Senior Management • Easy and reliable visibility of business performance • Forecasts and indicators where action is needed • Drill-down into underlying information and commitments • Flexible resource refocus
Measurements for Project Management • Immediate project reviews • Status and forecasts for quality, schedule, and budget • Follow-up action points • Report based on consistent raw data
Measurements for Engineers • Immediate access to team planning and progress • Get visibility into own performance and how it can be improved • Indicators that show weak spots in deliverables • Focus energy on software development
http://www.ibm.com/developerworks/rational/library/customized-reports-rational-team-concert/http://www.ibm.com/developerworks/rational/library/customized-reports-rational-team-concert/
The E4-Measurement Process Objectives, needs Decisions, re-direction, updated plans Business Process Environment, resources 1. Establish 2. Extract 3. Evaluate 4. Execute Ref: Ebert and Dumke 2007
Aggregation of information Cash flow, Shareholder value, Operations cost Cost reduction, Sales, margins, Customer Service Sales, cost reduction, innovative products, level of customization Cycle time, quality, cost, productivity, customer satisfaction, resources, skills
SMART goals • Specific - precise • Measurable - tangible • Accountable – in line with individual responsibilities • Realistic - achievable • Timely – suitable for the current needs
Example of Metrics • Progress / Effort / Cost Indicator • Earned value management • Requirements / Code Churn • Defect-related metrics • Test-related metrics
Size • How big is the healthcare.gov website? • http://www.informationisbeautiful.net/visualizations/million-lines-of-code/
Size • Earth System Modeling Framework Project http://www.earthsystemmodeling.org/metrics/sloc.shtml
Earned value management • Planned Value (PV) or Budgeted Cost of Work Scheduled (BCWS) • Earned Value (EV) or Budgeted Cost of Work Performed (BCWP) http://en.wikipedia.org/wiki/Earned_value_management
Burndown Chart http://en.wikipedia.org/wiki/Burn_down_chart
Requirements Churn/ Requirements Creep/ Requirements Volatility • number of changes to system requirements in each phase/week/increment
Code Churn • Software change history • Large / recent changes • Total added, modified and deleted LOC • Number of times that a binary was edited • Number of consecutive edits
Code Complexity • Gathered from code itself • Multiple complexity values • Cyclomatic complexity • Fan-In / Fan-Out of functions • Lines of Code • Weighted methods per class • Depth of Inheritance • Coupling between objects • Number of subclasses • Total global variables
Code coverage • Degree to which the source code is tested • Statement coverage • Has each node in the program been executed? • Branch coverage • Has each control structure been evaluated both to true and false?
Code Coverage http://www.firstlinesoftware.com/metrics_group2.html
JUnit Code CoverageTool instruments byte code with extra code to measure which statements are and are not reached. Line Level Coverage A Code Coverage Report Package Level Converage http://www.cafeaulait.org/slides/albany/codecoverage/Measuring_JUnit_Code_Coverage.html
Defect reporting metric • Can be categorized by • Status • Remaining / Resolved / Found • Defect Sources • Requirements / Design / Development • Defect found • Peer review / unit testing / sanity check • Time • Defect arrival rate / Defect age
Test Pass Coverage http://www.jrothman.com/Papers/QW96.html
Developer Code Review After 60‒90 minutes, our ability to find defects drops off precipitously http://answers.oreilly.com/topic/2265-best-practices-for-developer-code-review/
As the size of the code under review increases, our ability to find all the defects decreases. Don’t review more than 400 lines of code at a time. http://answers.oreilly.com/topic/2265-best-practices-for-developer-code-review/
Top 6 Agile Metrics Ref: Measuring Agility, Peter Behrens
Velocity = Work Completed per sprint Ref: Measuring Agility, Peter Behrens
Case studies • Metrics from Empirical Data – Northrop Grumman • Metrics in IT services – Lockheed Martin
Richard W. Selby, Northrop Grumman Space Technology, ICSP '09Title: "Synthesis, Analysis, and Modeling of Large-Scale Mission-Critical Embedded Software Systems"