Denial of Service in Sensor Networks. Anthony D. Wood John A. Stanovich Presenter: Todd Fielder. Denial of Service. Any event that diminishes or eliminates a network’s capacity to perform it’s expected function. Hardware failure Software bugs Resource exhaustion
E N D
Denial of Service in Sensor Networks Anthony D. Wood John A. Stanovich Presenter: Todd Fielder
Denial of Service • Any event that diminishes or eliminates a network’s capacity to perform it’s expected function. • Hardware failure • Software bugs • Resource exhaustion • This article is primarily concerned with protocol or design level vulnerabilities.
Complications in Sensor Networks • Harsh environments • Fault tolerant • Must be resilient in the presence of failures • Subverted nodes which are as powerful as network nodes • Potentially more powerful computing capabilities at adversary • i.e. could be wired
Network Architecture • A layered network architecture • Clean Division Increases robustness by defining layer interactions and interfaces • Sensor Networks sacrifice robustness, cross layers, to increase performance • Each layer vulnerable to different DOS attacks
Physical Layer • Wireless communication due to large scale ad-hoc network • Wired base station rare
Jamming • Interference with the radio frequency the network is using. • Easily detectable due to constant energy • Defenses: • Spread Spectrum: frequency hopping based on a predetermined algorithm. • Resource intensive • Jamming rarely affects entire network, route around affected area
Tampering • Attacker can gain access to physical sensor and either analyze device to obtain sensitive information and/or replace sensor. • Obtain cryptographic keys • Reprogram Nodes • Defenses: • Tamper proof physical packaging • Node should react in fail-complete manner • Camouflage or hide nodes
Link Layer • Provides channel arbitration for neighbor to neighbor communication • Cooperative Schemes, such as carrier sense, are particularly vulnerable to DOS attacks.
Collision (corruption) • Can disrupt an entire packet by introducing a collision in only small portion of packet • Requires only fractional portion of energy • Causes heavy expenditure in energy by target (exponential backoff ) • Defenses: • Error correcting codes • Usually used for small errors (environmental or probabilistic) • Collision detection • Still requires communication among nodes…not completely effective
Exhaustion • Communicate in such a way so as to drain battery resources • If retransmission is repeated and collision induced near end of frame, nearby nodes would become exhausted of energy. • Self-Sacrificing node • Interrogation – node continually sends RTS to attacker to solicit a CTS, thereby exhausting both nodes battery resources • Defenses: • Rate-limiting • Network ignores excessive requests without transmitting additional packets
Unfairness • Intermittent application of previous attacks could degrade service of the network • Cause loss of real-time services • Defenses: • Small Frame: • Allows individual nodes to capture the channel for a small period of time
Network and Routing Layer • Most nodes will serve as routers • Due to ad-hoc nature of network • Causes additional complexities for protocol • Simple enough to scale to large networks • Robust enough to deal with failures several hops from source
Neglect and Greed • Node-as-Router • Neglect: Does not forward other packets • Greed: Gives undue priority to own packets • Difficult to detect • Defenses: • Multiple routing paths • Redundant message transmission
Homing • Passive adversary observes traffic to determine which nodes are critical to network function, then concentrates attack on that node • Defenses: • Encrypt headers at each hop, to prevent source and/or destination from becoming discovered
Misdirection • Forward Packets along wrong paths • Smurf: forge the victim’s address as the source of message, causing all responses to be sent to that address. • Defenses: • Egress Filtering • Verify source address and only route legitimate packets.
Black Holes • Nodes advertise zero-cost routes to every other node, causing every other node to route in their direction. • Defenses: • Easy to detect
Defenses • Authorization • Only authorized nodes may exchange routing information • Monitoring • Observe neighbors to ensure proper routing behavior • Probing • Periodically send probes that cross the network’s diameter • Redundancy • Duplicate messages across multiple paths protects against routing failures
Transport Layer • Provides services for end-to-end communication • Tend to be simple to reduce overhead
Flooding • Feasible in state protocols, an adversary sends many connection establishments to an adversary, who must keep these SYN request in a Queue, which eventually fills up • Defenses: • Limit number of connections • Prevents resource exhaustion • Can still Deny Service to legitimate connections • Client Puzzles • Requires clients to demonstrate resources they are willing to commit to the connectionby solving a puzzle distributed by the server
De-synchronization • An existing connection is disrupted by an adversary repeatedly forging messages with incorrect timing data (seq. num, control flags) • Defenses: • Authenticate each packet
Adaptive Rate Control • Improvements to standard MAC protocols for Wireless Sensor Nets. • Random transmission delay • Back off that shifts an application’s periodicity phase • Minimization of overhead in contention control mechanisms • Passive adaptation of originating and route through admission control rates • Anticipatory delay for avoiding multi-hop hidden-node problems. • Preference given to route through traffic in admission control protocol (back-off less at distant nodes). • Preserves networks investment in packets that have been forwarded many hops. • Problem: High bandwidth packet streams generated by an adversary will receive preference during collisions. • The network must not only bear the malicious traffic, it also gives preference to it.
Real-Time Location-Based Protocols (RAP) • Real-time communication architecture • Geographic forwarding with a velocity monotonic scheduling (VMS) policy. • Based on packet deadline and distance to travel. • Problem: Adversary can inject messages with geographic destinations far away. • Static Velocity: Intermediate nodes only need to make local forwarding decisions. • Dynamic Velocity: Intentionally lowering its velocity so that the packet misses its deadline. • Solutions: • Static Velocity: Use cryptographic keys to authenticate velocity • Dynamic Velocity: Clock Synchronization to prioritize packets