European Space Agency - developments & in-orbit experience

European Space Agency - developments & in-orbit experience. Outline. Technology Development Cycle Technology Readiness Levels Instrument Development Cycle Missions in Operation XMM-Newton Integral Mars Express. Outline (continued). Missions in Development Herschel / Planck GAIA

zamora
Télécharger la présentation

European Space Agency - developments & in-orbit experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. European Space Agency - developments & in-orbit experience

  2. Outline • Technology Development Cycle • Technology Readiness Levels • Instrument Development Cycle • Missions in Operation • XMM-Newton • Integral • Mars Express

  3. Outline (continued) • Missions in Development • Herschel / Planck • GAIA • BepiColombo • Future Missions • Solar Orbiter • Darwin • XEUS

  4. Investment by Technology Domain • Increasingly complex science instrumentation requires corresponding investment in spacecraft infrastructure • For example pointing stability, on-board data processing must improve • Nevertheless the instrument funding by ESA remains the most critical

  5. ESA Science Programme • Missions arebased onexisting technologies, or technologies whichmight require some modest evolutions or modifications(relatively high TRL level) • New and more efficient, or ever more demanding Science Missions have torely oninnovative and novel technologies, on thespacecraft and also particularly the payload side (Optics and Sensors). • An innovative technology program is therefore the required base for any creative and productive long-term science programme. • But currently the funding base is being eroded ……….

  6. How are technologies selected? • Astronomy: typically <1 mission / decade per wavelength domain, • Planetary science missions to different destinations, with remote and in situ follow-ups implies <1/decade/planet • Solar observatories are weakly motivated to exploit the 11yr natural cycle for the next generation instruments • Next mission is always beyond current science programme lifecycle. [Current programme is fixed to 2014] • Frequently a mission’s science goals evolve[priorities and themes change with other science discoveries including those of other agencies] • Can forecast only generic technology challenges for any major enhancement of capability (~order magnitude improvement performance) or the introduction of a new techniques(image/spectroscopy/polarimetry/timing/particle species etc.)

  7. The life-cycle of a Science Instrument ESA Novel Technology R & D Phase 1: New ideas, Fishing Novel Technology R & D Phase 2: Improvements,Demonstrators Instrument Integration Onto Spacecraft, Launch, Operation Science AO Selection Science Institutes National Funding Instrument Pre-development Breadboards, Qualificationof Technology New instruments Detailed Instrument Design, Consortia InstrumentProposals Instrument Building, Qualification, Calibration InstrumentImplementation

  8. The Catch 22 Innovative Science Missions Novel Technologies Require NovelTechnologies: Non-existant Require Prospective Science Missionfor Justification Premature for Science Programme Not relevant for Missions in B/C/D Rejected Rejected

  9. TRL 1-3 TRL 4-10 TRP CTP-A CTP-B GSTP Existing, proven Technologies Definition Phase Creative, innovative Technologies Pre/Assessment Phase Technology Readiness Levels and ESA Funding Programmes

  10. Despite the best laid plans….. • Qualification for vibration, thermal environment and radiation may limit preferred design options • Inevitably resourcing of flight instruments through PI-led consortia can be hostage to delays • Testing and calibration time come under severe time pressure • The cost of running the spacecraft contract is huge – therefore pressure to launch on-time prevents the full testing of instrument • We examine here some cases of operational “surprises”

  11. XMM

  12. XMM • Lessons learned concern the in-orbit environment • Pre-launch concerns about environment (eccentric 100,000 km) Moveable shutter for belt passage protons (cf. CHANDRA) • Contamination to be mitigated with out-gassing chimney/cold-trap. • Soft protons flares ~ 20% of operation (soft 10’s keV) • Micrometeorites – 1/yr/camera, they scatter at grazing incidence off mirrors. Local damage and worse ….. • Enhanced charged particle background - GEANT 4 modeling? • User interaction – flat field set up 100’s –1000’s seconds • CCD electronics infant mortality

  13. Integral • Ge detectors – cryogenic spectrometer at 80K. Radiation damage factor 2 worse than expected, Requires annealing every 6 months – a loss of observing time (and suspected loss of diodes through thermal cycling?) • Background also twice expected, spectral lines and showers reduce sensitivity • JEM-X – contamination in glass strips – breakdown in gas exacerbated by high backgound rates, gain had to be reduced (poor calibration)

  14. Mars Express • High Resolution Stereo Camera • 9 CCD lines of 5100 pixels, 32kg • The ultimate resolution of 2m at orbit height 250km has not been achieved • Complex optics train, requires exceptional thermal stability and control • Suggests more comprehensive testing and calibration should be considered

  15. Herschel • Discovering the earliest epoch of proto-galaxies, cosmologically evolving AGN-starburst symbiosis, and mechanisms involved in the formation of stars and planetary system bodies. • 3.5 metre diameter passively cooled telescope 60 - 670μm. • The science payload complement - two cameras/medium resolution spectrometers (PACS and SPIRE) and a very high resolution heterodyne spectrometer (HIFI) - will be housed in a superfluid helium cryostat. • Herschel will be placed in a transfer trajectory L2, 2007 3 yrs

  16. PACS • Photoconductor Array Camera & spectrometer • 3 Ge:Ga photoconductor linear arrays for spectroscopy & 2 Si bolometers • 50 passive & active optical elements 4 precision mechanisms • 3 photometric bands with R~2. • `blue' array covers the 60-90 and 90-130 µm bands, while the `red' array covers the 130-210 µm band. • Field of view of 1.75x3.5 arcmin • An internal 3He sorption cooler will provide the 300 mK environment needed by the bolometers. • Spectroscopy covers 57-210 µm in three contiguous bands, with velocity resolution in the range 150-200 km/s • The two Ge:Ga arrays are stressed and operated at slightly different temperatures

  17. PACS Array design

  18. SPIRE • 3-band imaging photometer (simultaneous observation in 3 bands) • Wavelengths (μm): 250, 350, 500 • Beam FWHM (arcsec.): 71, 24, 35 • Field of view (arcmin.): 4 x 8 • 3He cooler • Imaging Fourier Transform Spectrometer (FTS) • Wavelength Range (μm): 200-400 (req.) 200-670 (goal) • Simultaneous imaging observation of the whole spectral band • Field of view (arcmin): 2.0 (req.) 2.6 (goal) • Max. spectral resolution (cm-1): 0.4 (req.) 0.04 (goal) • Min. spectral resolution (cm-1): 2 (req.) 4 (goal) • Spider web NTD Ge bolometer0.3K hung from kevlar to 1.7K • with 3He Sorption cooler

  19. HIFI • Heterodyne Instrument for the Far-IR a spectrometer • 480 – 1250 GHz and 1410 – 1910 GHz • 134 kHz – 1 MHz frequency resolutions • 4 GHz IF bandwidth • 12 – 40" beam dual polarization  sensitivity & redundancy • Superconductor/insulator/superconductor & hot electron bolometers • New technology for mixers and local oscillators etc..

  20. HERSCHEL • Combination of large He observatory cryostat and complex thermal interface with instrument coolers has been a huge programme risk • HERSCHEL also to launch with PLANCK – developments tied to another platform (to reduce launch cost $150M) • All instruments require substantial development and qualification (thermal design, vibration) • In future Agency may prefer to take on load of the cryo developments from PI – reduce risk but testing interface more complex?

  21. Gaia • Astrometry (V < 20): • completeness to 20 mag (on-board detection)  109 stars • accuracy: 10-20 arcsec at 15 mag (Hipparcos: 1 milliarcsec at 9 mag) • scanning satellite, two viewing directions • Radial velocity (V < 16-17): • third component of space motion, perspective acceleration • dynamics, population studies, binaries • spectra: chemistry, rotation • Photometry (V < 20): • astrophysical diagnostics (5 broad + 11 medium-band) + chromaticity

  22. GAIA Payload and Telescope Rotation axis SiC primary mirrors 1.4  0.5 m2 at 99.4° Superposition of fields of view SiC toroidal structure Combined focal plane (CCDs) Basic angle monitoring system

  23. GAIA Astrometric Focal Plane Total field: - active area: 0.64 deg2 - number of CCD strips: 20+ 110+40 - CCDs: 4500 x 1966 pixels - pixel size = 10 x 30 µm2 Sky mapper: - detects all objects to 20 mag - rejects cosmic-ray events Astrometric field: - readout frequency: 55 kHz for AF2-10 - total detection noise: 5-6e- for AF2-10 Broad-band photometry: - 5 photometric filters Along-scan star motion in 10 s FoV2 FoV1

  24. GAIA On-board processing

  25. GAIA – CTI concern • Mass limitation dictated rather thin exterior light shades – gave very large proton dose • Now measuring prototype CCD performance after 109 protons/cm2 • Smeared response would prevent centroids being accurately calculated • Performance depends upon history of stars within a column – need “thin zero “?

  26. BepiColombo • Determination of mineralogy at spatial scale of large craters requires combination of visible, IR and X-ray imaging • Payload must sustain environment of solar irradiation, and cruise period of several years • X-ray instruments map high resolution fluoresence only at times of high solar flare fluence! • Optical and IR instruments require APS technology, room temperature operation, radiation hard • Uncooled broadband IR arrays – Si MEMS technology

  27. BepiColombo instruments • Si MEMS technology to produce micro-bolometer • ¼ cavity for good response, produced with polymer lift-off technique • ~256x320 array mated to ASIC to allow pushbroom readout

  28. BepiColombo instruments • GaAs room temperature spectrometer array • Mated to readout ASIC for 64 x 64 imager 200eV FWHM energy resolution at 1keV

  29. Solar Orbiter • Observations at 0.2 AU – 25 Solar constants load • Active Pixel Sensors - CCD would suffer un-tolerable radiation damage at 0.2 AU and CMOS based APS are a key need for the mission (all Remote Sensing instruments). • Heat rejecting entrance window / EUV filters -The need to reject the heat before it reaches the S/C is a key requirement for the SolO instruments (foils and grids) • Fabry-Perot filters - select a narrow and tunable spectral band baseline is a double Fabry Perot followed by a band pass interference filter. The spectral tuning of both Fabry Perot is achieved by applying high voltage • Liquid Crystal polarisers- to select 4 independent input polarisation states using Liquid Crystal Variable Retarders • Solar-blind detectors – wide band gap needs development or use intensified CMOS APS

  30. Darwin • 4 spacecraft at L2 orbit, 2m class telescopes • Nulling interferometry to reject primary star light by ~108 • Maintain baselines from 50m – 200m, with rotation - by formation flying • OPD established to 20nm within the beam combiner S/C • Require integrated optics & detectors for 4-20μm for spectroscopy

  31. Darwin • Detectors could rely on JWST for 5-20μm • Eg linear array of BIB Si:As, but these need 8K temperature cf. optics 40K • Possible problem with vibrations from additional cooler

  32. XEUS • X-ray astronomy observatory with 10m2 effective area via. novel silicon mirror plates modules • L2 orbit, MSC and DSC in formation flying 50 m apart • Imaging and spectroscopy requires new detectors developments

  33. XEUS • Wide Field Imager – Si class energy resolution, and 100μm pixels • Huge mirror area means for photon counting that fast readout required • Use a DEPFET version of APS technology

  34. XEUS • Cryogenic sensors to achieve non-dispersive spectroscopy λ /δλ ~ 1000 • STJ or TES readout of bolometers • Requires ADR coolers (50mK) and efficient light and IR-blocking filters, RF SQUID multiplexors

  35. Summary Required Developments • Larger focal planes, with APS-like readout at all wavelengths • Europe lacks heritage in readout ASICs cf. HEP vertex detectors • Investment in novel optics and mechanical coolers will be as important (cryogen lifetime) • Early identification of technology, investment, early testing in appropriate environment • Common location for observatories is L2 – radiation damage and prompt effects are important (background/cosmic ray removal)

More Related