1 / 5

Tailored ISP Rules of Engagement March 2010

Tailored ISP Rules of Engagement March 2010 . 1. The policy is all IT/NSS will produce an ISP (DoD 4630 series) Doing a TISP is a privilege You need permission from Joint Staff to submit a TISP with the recommendation from NII TISP expectation will be completed in 6 months on entry

zanna
Télécharger la présentation

Tailored ISP Rules of Engagement March 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tailored ISP Rules of Engagement March 2010 1

  2. The policy is all IT/NSS will produce an ISP (DoD 4630 series) • Doing a TISP is a privilege • You need permission from Joint Staff to submit a TISP with the recommendation from NII • TISP expectation will be completed in 6 months on entry • Only ACAT II and below can do a TISP • ACAT I is not eligible and must do an ISP • JS & NII will “tailor” the ISP and determine which artifacts will be done • Intent is for rapid acquisition, JUONs, or legacy systems that are post MS C • J68/NII considers based on criteria including but not limited to: cost, special interest, urgency, complexity of system and scope/cost of future upgrades. • Having joint interfaces or not is not a determination for a TISP 2

  3. Tailored ISP • Tailored ISP (TISP) focused on Non ACAT, Legacy Force and Rapid Acquisition • Input to Joint Interoperability Certification w/ acceptable risk • Community consensus on completeness • Dynamic and responsive to meet immediate Warfighter needs • Benefits Programs of record through cost efficiency and speed Tailored ISP Appropriate set Of Integrated Architectures Traditional ISP TV-1/2 TV-1/2 AV-1/2 SV-6 SV-6 SV-5 OV-1 OV-5 SV-5 OV-1 OV-2 AV-1 SV-4 OV-3 OV-4 OV-6c /SV-1 SV-2 TV-1 SV-1 OV-5 OV-6c Saving $30K each use 3

  4. Non-JCIDS acquisition programs develop IT and NSS systems for various reasons – concept exploration, mission necessity etc. • COCOMs procure systems for mission requirements • Current force/legacy systems continue operations yet crossed Milestone C under past acquisition process • Programs of Record or Services struggle with systems without JS interoperability/requirements review, certification or DISA/JITC testing 4

  5. The policy is all IT/NSS will produce an ISP • Doing a TISP is a privilege • You need permission from JS to submit a TISP • Only ACAT II and below can do a TISP. • It is intended for rapid acquisition, JUONs, or legacy systems post MS C • JS and NII will "tailor" the ISP and determine which artifacts the program will need to create. • The expectation is a TISP will be completed within 6 months of entry into the program. • Having joint interfaces is not a determination for a TISP 5

More Related