An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Siting, Real Estate and Interconnection Issues for Wind Projects Tim Conboy IPED Financing Windpower May 8, 2008

  2. Outline • Introduction • Development Process • Siting • Real Estate • Interconnection • Summary

  3. Acciona Energy • Wind • Long-term developer, owner & operator • Manufacture AW-1500 1.5 MW wind turbine generator • #1 globally in project development (4,690 MW/175 projects) • Own/operate 3,465 MW of wind generation • Thermal & PV Solar – develop, own & operate projects • Small Hydro – own & operate in Spain • Biomass – 1st straw-fired plant in southern Europe • Biofuels – biodiesel and bioethanol production facilities

  4. Development Process Preliminary Investigation Land Access Local Government Consultation Critical Issues Analysis Wind Resource Measurement Preliminary Design & Engineering Environmental Impact Studies Transmission Interconnection Permitting Power Marketing Final Design & Engineering Project Financing

  5. Siting • Wind resource • Compatible land • Nearby transmission • No undue environmental impacts • Power market • Local government & community interest

  6. Real Estate • Wind energy lease • Payment – calculation (gross revenues) • Landowners without turbines • Assignment – consents • Actual location of facilities • Hunting rights • Transmission interconnection • Obtaining adequate ROW • Use of existing ROW • Land control - as a solution • Setbacks, noise • Mitigation efforts (wetlands, avian)

  7. Interconnection • Land Control • Competition • Curtailment • Equipment Selection • Interconnection Agreement

  8. Summary • Development Process • Siting • Real Estate • Interconnection