1 / 12

I 3 CON

I 3 CON. Industrialised, Integrated, Intelligent Construction Matti Hannus, VTT. European Construction Technology Platform Information Seminar for Industry of European Funding and R&D Monday, 12 February 2007 Dipoli, Otaniemi (Otakaari 24, Espoo), Finland. Project ID : FP6 NMP 026771

zeheb
Télécharger la présentation

I 3 CON

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I3CON Industrialised, Integrated, Intelligent Construction Matti Hannus, VTT European Construction Technology Platform Information Seminar for Industry of European Funding and R&D Monday, 12 February 2007 Dipoli, Otaniemi (Otakaari 24, Espoo), Finland

  2. Project ID : FP6 NMP 026771 Instrument : Integrated project(project type) Duration : 2006-10-01...2010-09-30 Coordinator : Dragados S.A., Spain Tech.manager : VTT, Finland Funding : 9.5 M€ Budget : 18 M€ Figures

  3. Scope of I3CON and related projects Inception Design Component manufacture Siteassembly Operation & maintenance Demolish Renovate Scope of the ECTP Space (~rooms) Industrialisedconstruction I3CON (NMP IP) Buildingservicessystems INPRO(NMP IP) ManuBuild (NMP IP) Envelope Structuralsystem P r o d u c t Under-ground TunConstruct (NMP IP) Networks IntelCities (IST IP) Cities P r o c e s s

  4. Growing share of building services 10 % Surfaces 20 % 30 % Structures 60 % I3CONfocus 50 % Building services systems 30 % A.Sarja, VTT, 1997 1960 1980 2000

  5. Business models Value of work done in the building 200 Operation and maintenance cost Constructioninvestement 5 1 Cost based business models: Reduce costs Service oriented business models: Provide services Value driven business models: Add value to user

  6. Roadmap towards the vision Separated disciplines, capacity provision Networkedperformanceprovision Industrialconstruction and service provision of high-performance buildings and spaces Isolated / stand alone smart systems Integrated buildingoperating systems +embedded services Integrated business model Virtual building model On-site fittings Prefabricated modules &components Isolated LC stages & separately operated systems LC optimising controls & services

  7. Aim at radical innovations • Radical breakthrough by moving • from “either or” compromise (diagonal) • to ambituous “both and” (upper righ corner) Distributedcontrol Industrial provision of high-performance spaces, buildings and their LC support Vision Local control Space Virtualbuildingmodel Simulation Buildingoperatingsystem Multifunctionmanufacturedcomponents Field bus P r o d u c t System Breakthrough Smart materials Product model Componentcatalogues Smartcomponents Component State of the art Isolated Integrated LC optimised I n t e g r a t i o n l e v e l

  8. Target system Performance, comfort, services,functionality Fire brigade Maintenence Monitoring Operation Police Security guard etc. Remote services Room / space Internet Automation Commu-nication Electricity Accesscontrol Entertain-ment HVAC Informationtechnology Lighting Renovation Architecturedesign VirtualBuildingModel Machinery Measure-ments Security& safety ... etc. Structuraldesign Service platform Gateway BS design FM Construction

  9. WP1. Requirements Overall project structure WP7. Technical integration WP8. Demonstration WP4.Products & production methods WP5. Virtual building model WP6. Life cycle services WP2. Business models WP3.Integrated system concepts WP12. Management WP10. Dissemination WP11. Training WP9. Exploitation

  10. Overview of the ”I3CON System” WP2 WP3 WP4 WP5 Virtual Building Model Systemconcepts Businessprocesses Products and___production methods System strategies Principles, rules & instructions Control strategies, system architectures and typologies Configurable system templates Key products Smart components Multifunction modules Connections Wired / wireless Pluggable physical connections Software interfaces Value management Performance metrics Assessment, optimisa-tion, visualisation, simulation & decision support methods & tools Process models Reference models for performance based processes Process modularisation & configuration Contract models Sample products, manufacturing & assembly methods … Embedded intelligence … Specific products and applications Open ICT platform ICT architecture Building Operating System Building model DB Simulation engine Core services e.g. access control Control & application interfaces Open access gateway WP6 Life cycle services Implementation support WP7,8,9,10,11 New services Supporting ICT tools Requirement mgt tool Customer oriented product & service configurator Training & educationpackages Standards? Technical guidelines /hanbooks Best practice guideliness IPR lisence guide

  11. Complementary consortium (1) Technology provider (2) Designer (3) Construction/developer (4) Manufacturer (5) System integrator (6) System suppplier (7) Site installation (8) Client/user (9) FM & service provider (10) Research institute (11) University (12) SME

  12. Project management structure Other projects Task Forces Advisory roles EC General Assembly All partners ECTP Advisory board WP12 Co-ordinator Executive Board Core partners Community of interest Project office VTT Technical Committee WP leaders + co-leaders Technical Manager Exploitationmanager Disseminationmanager WP2 WP3 WP4 WP5 WP6 WP7 WP8 WP9 WP10 WP11 WP1 Each WP : industry leader + research leader + Task leaders

More Related