1 / 18

State Scientific Center of Russian Federation

State Scientific Center of Russian Federation. Institute for Theoretical and Experimental Physics ( ITEP ). FAIR. Expression of interest from ITEP. SIS 300 beam diagnostics. FAIR meeting on 19 March 2009 (Protvino). Diagnostic elements. Comfort'. In house'. In collaboration'. SIS 100.

zlata
Télécharger la présentation

State Scientific Center of Russian Federation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. State Scientific Center of Russian Federation Institute for Theoretical and Experimental Physics ( ITEP )

  2. FAIR. Expression of interest from ITEP SIS 300 beam diagnostics FAIR meeting on 19 March 2009 (Protvino)

  3. Diagnostic elements Comfort' In house' In collaboration' SIS 100 BPM 50% 50% Closed orbit feedback 10% Wall current monitor 50% Ionization profile monitor 60% SEM grid 50% --- SIS 300 BPM 50% 50% + >50% Wall current monitor 50% + Ionization profile monitor 60% >60% + SEM grid 50% >50% CR BPM 50% Wall current monitor 50% Ionizationprofile monitor 40% SEM grid 50% RESR BPM 50% Ionizationprofile monitor 40% HESR BPM 50% FAIR meeting on 19 March 2009 (Protvino)

  4. Beam position monitor challenges • Wide range of currents • Tight requirements for position accuracy for intense beams – Δx < 0.1mm, x = ±100mm Beam position monitor features • A special attention to pick-up construction • Careful design of front-end electronics FAIR meeting on 19 March 2009 (Protvino)

  5. BPM Applications Bunch-by-bunch operation to get a distinguish between bunches Closed orbit feedback Turn-by-turn variation of any bunch in the train SIS100/300 Lattice function reaction distortion FAIR meeting on 19 March 2009 (Protvino)

  6. Example of a electrode arrangement for a linear-cut BPM and the scheme of the position determination. FAIR meeting on 19 March 2009 (Protvino)

  7. BPM electronics FAIR meeting on 19 March 2009 (Protvino)

  8. BPM basestation with analog front-end FAIR meeting on 19 March 2009 (Protvino)

  9. BPM timetable(rough estimation) FAIR meeting on 19 March 2009 (Protvino)

  10. Ionization profile monitor • Advanced concept with high resolution and fast profile measurements • IPM is a subject of GSI-ITEP collaboration FAIR meeting on 19 March 2009 (Protvino)

  11. Ionization profile monitor. Fast profile readout. FAIR meeting on 19 March 2009 (Protvino)

  12. Permanent magnet quadrupole at one of the ITEP synchrotron output channel Examples of ion beam optic elements constructed in ITEP on the base of permanent magnets PM Lens design and rods magnetization scheme for 352 MHz Prototype Alvarez DTL Tank for the CERN SPL FAIR meeting on 19 March 2009 (Protvino)

  13. Construction drawing (overview from the front side) of a typical profile grid. To reduce the number of required signal processing channels, a larger spacing outside the center has been chosen. Roughly estimated number of secondary electrons per incident ion with the energy of incident ion as a parameter. The data have been scaled ~z1.5 from various data found in the literature Secondary emission monitor FAIR meeting on 19 March 2009 (Protvino)

  14. SEM-grid timetable(rough estimation) FAIR meeting on 19 March 2009 (Protvino)

  15. The realization of a wall current monitor at a Ø 40 mm beam pipe for CTF Scheme of an inductive wall current monitor and the realization for CERN LINAC 2 Wall Current Monitor FAIR meeting on 19 March 2009 (Protvino)

  16. WCM electronics timetable(rough estimation) FAIR meeting on 19 March 2009 (Protvino)

  17. Diagnostic elements Comfort' In house' In collaboration' SIS 100 BPM 50% Closed orbit feedback 10% Wall current monitor 50% Ionizationprofile monitor 60% SEM grid 50% --- SIS 300 BPM 50% 50% + >50% Wall current monitor 50% + Ionization profile monitor 60% >60% + SEM grid 50% >50% CR BPM 50% Wall current monitor 50% Ionizationprofile monitor 60% SEM grid 50% RESR BPM 50% Ionizationprofile monitor 60% HESR BPM 50% FAIR meeting on 19 March 2009 (Protvino)

  18. THANK YOU!! FAIR meeting on 19 March 2009 (Protvino)

More Related