1 / 8

Piceance Basin Natural Gas Development Program

Piceance Basin Natural Gas Development Program. Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008. Chevron’s Commitment to Environmental Stewardship. Assistance to state agencies as a landowner in responding to Garden Gulch

zoltan
Télécharger la présentation

Piceance Basin Natural Gas Development Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Piceance BasinNatural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008

  2. Chevron’s Commitment to Environmental Stewardship • Assistance to state agencies as a landowner in responding to Garden Gulch • Engagement with Mineral Lessees as the Landowner • Stormwater Management Programs • Carbon Footprint Assessment, Alternative Energy Opportunities and Resource Conservation • Surface Use Location Selection Process for Fee Acreage

  3. Assistance to State Agencies • Recent Garden Gulch Activity • Worked closely with all regulatory agencies to provide information and access to property • No regulatory obligation as landowner • Provided CDOW access to conduct water and fish studies and samplings • Provided on site access for EPA, CDPHE, CDOW, Garfield County and the Colorado Water Quality Control Commissioners – irrespective of statutory right of access

  4. Stormwater Management Best Management Practices (BMPs) • Controls • Workforce training and awareness raising • Utilization of stormwater program service providers for construction and inspection • Preventing erosion and/or sedimentation with best management practices applications • Silt Fence • Retention Basins • Check Dams • Seeding and Mulching • Grading/Roughening Techniques • Road and driveway surfacing • Spill Prevention Control and Countermeasure plans for reducing spills and/or consequences

  5. Stormwater Management BMPs cont. • Emergency Response Plans • Methods of handling/disposing of contaminated soils • Post Construction Controls • Interim period between construction completion and final stabilization of the area • Must be inspected once a month

  6. Surface Use Location Selection Process • The purpose of the process is to make quality land use decisions for the Piceance Development Program. • Quality means balancing the environmental and surface use aspects with asset development. • Similar processes are employed with mineral lessees on Chevron lands and where Chevron operates on other’s lands. • Initial location selection • Geologist recommends the pad location & description • Area review • On-site review and report with aerial photo of any findings • Road access • Grazing and/or irrigation impacts • Pad orientation • Drilling and Geology Review • Will pad location and orientation work

  7. Surface Use Location Selection Process cont. • Formal Review of Site • Record issues and mitigation recommendations • Disturbed area • Access road(s) • Visual/noise impacts • Grading • Rig layout and well slot coordinates • Pit liners • Production facilities • Wildlife habitat and migration • T&E species considerations

  8. Surface Use Location Selection Process cont. • Mitigation Plan/Stakeholder Meeting • Determine if process can proceed or if recycle is necessary • Land Survey • Disturbed area to be identified • Detail Pad Design • APD/SUP Preparation • Construction and Operations Review for Final Pad Design

More Related