An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Non-Functional Requirements Notes taken from: Object Oriented Software Engineering text; Art of Software Architecture (Stephen Albin) Use Case Analysis (Bittner and Spence); Use Cases – Requirements in Context (Kulak and Guiney) Some notes from Rational Software Corporation slides Other personal notes 36

  2. Use-Case Analysis Steps – Here’s where we are: • Supplement the Use-Case Descriptions • For each use-case realization • Find Classes from Use-Case Behavior • Distribute Use-Case Behavior to Classes • For each resulting analysis class • Describe Responsibilities • Describe Attributes and Associations Non-Functional Requirements – We have a: • good understanding of the nature of the analysis classes and their responsibilities • collaborations required to support the functionality described in the Use Cases via analysis classes Need to address the non-functional requirements IBM-Rational calls these “analysis mechanisms.” 36

  3. Non-Functional Requirements • The purpose of “identifying non-functional requirements” is to get a handle on these absolutely necessary requirements that are normally not ‘functional.’ • During Analysis, this information is speculative. • Will be refined later. • Philosophy: Capture now; Realize later… • (Essential points in design…) 36

  4. Non-Functional Requirements – OOSE Text p.115- 36

  5. Types of Requirements • Functional requirements • Describe what the system should do • Non-functional requirements • Consists of Constraints that must be adhered to during development (design and implementation) • Operative word: ‘Constraints.’ 36

  6. Functional requirements • What inputs the system should accept • What outputs the system should produce • What data the system should store that other systems might use • What computations the system should perform • The timing and synchronization of the above 36

  7. Non-Functional requirements • Mostly not unique to a single use case. • Generally thread themselves throughout some use cases • Transcend locality • Some of these conflict with each other • Some support ‘efficiency’ of code and ‘inefficiency’ in maintenance… • Let’s contrast functional and non-functional requirements  36

  8. Non-functional Requirements – Verifiable; Measured • All requirements must be verifiable • If not ‘verifiable’ then there is no indications that these requirements have been satisfied. • Some must also be measured. • Some requirements are measurable, such as response time; availability time, etc. • Some may be directly measured; some measured via simulation. • We parse the non-functional requirements into categories… 36

  9. Categories of Non-Functional Requirements 1. Quality Non-Functional Requirements (1 of 2) • Allconstrain the design to meet desired quality levels of usability, efficiency, reliability, maintainability and reusability… • Examples: • Response time – particularly important for processes that process a lot of data or use networks a great deal. • Requirements might stipulate < two second response. • Might use a Timingbar indicating progress… • Response time may be considered a functional requirement for some ‘real time systems. • Throughput – for computationally-intensive applications or for heavy transaction-oriented systems, the ‘number of transactions per minute or number of computations per minute can/must be measured. • Resourceusage – Application cannot use > xxMB of memory Very practical in a large multiprogramming / multiprocessing system. 36

  10. Categories of Non-Functional Requirements 1. Quality Non-Functional Requirements (2 of 2) • Reliability – typically Mean Time Between Failures (MTBF) (number of failures per week; define ‘failure.’) • Availability – Measures the time application is ‘up’ and the period of down time, when down. • Recovery from failure – Mean Time To Repair: (MTTR) – critical to some applications; not so for others; checkpoint restarts; auto-saves, etc. If you specify the detailed procedure to follow, then this is a functional requirement. • Allowances for Reusability – may specify that a certain percentage of the system must be designed generically to support reusability… 36

  11. Categories of Non-Functional Requirements 2. Environment and Technology Constraints • Platform • What hardware / software the software must be able to work on. • Normally indicate ‘least’ platform • e.g. Windows XP, Vista; 120 MB free disk space…. • Technology to be used • Programming language; database system. All individuals are familiar with these languages / database nuances. • May/may not reduce need to train people 36

  12. Categories of Non-Functional Requirements 3. Project Plan and Development Methods • Development Process/Methodology • This may be specified and will greatly impace development. • SDLC; RUP; Agile Methods, Scrum; XP, Feature-Driven Development (FDD), etc. • Particular approaches to testing (done by separate group; ‘Where in supervisory chain?’ • References to these must be included; not the details • Cost and Delivery Dates; Traceability • A Bigee!! Usually a very important constraint. • Usually found in the Contract for the system or in a separate project plan. 36

  13. Random Thoughts - Non-functional Requirements • Not always clear that a requirement is non-functional and functional. • If requirement is a fundamental part of the application’s functionality, then it should be stated as a functional requirement • Think ‘performance’ of a real time / manufacturing app. • Think ‘reliability’ of a safety-critical application • If requirement is a ‘constraint’ on design or some kind of restriction on design, then the requirement is almost always ‘non-functional.’ • Certainly the presented list is not exhaustive! 36

  14. Quality Models – Many and Varied (1 of 2) • Quality Models from a different source: from Art of Software Architecture… (p.70-72) • Note the different ‘categories’ for Quality Modeling according to this source: • Product Operation Quality: • Accuracy, Reliability, Efficiency, Integrity, and Usability • Product Revision Quality are: • maintainability, flexibility, testability • Product Transition Quality are: • Interface facility, reusability, transferability 36

  15. More attributes…(2 of 2) • According to Barry Boehm: Overall quality is a function of these metrics: • Validity, clarity, understandability, modifiability, modularity, generality, economy, resilience, documentation • Laurence Best’s Application Architecture identifies: • Accuracy and comprehensiveness; simplicity of use, operational flexibility, ease of development, maintenance and extension, security and control, resource efficiency, recovery • And there are numerous other ‘lists’….. • These are presented to show you that there are different ‘takes’ on quality and what determines quality… 36

  16. Looking down on these…(1 of 2) • Functional models such as use cases, typically drive object-oriented projects (although they certainly don’t have to…) • Attributes such as modifiability are not easily expressed in purely object-oriented terms and need supplemental text descriptions to represent the design. •  Each attribute MUST be considered during design and usually requires the architect to make multiple passes as a design. • Class design: start by addressing functionality only • Secondpass to incorporate modifiability constraints while making sure that the functionality is not compromised. • Sometimes, multiple passes are needed to incorporate various requirements and to evaluate the design tradeoffs. •  How can these methods be efficient and yet maintainable? •  Efficient and yet reusable? •  Reusable yet modifiable? 36

  17. Looking down on these…(2 of 2) • Many competing non-functional requirements. • Architect must find a design that realizes a balance among them. • Example: • Performance design techniques, however, usually incorporate fewer levels of indirection and optimizations to data structures in order to improve operation execution times. • Performancegains may bring decreasedmaintainability / reusability features. • Cost is usually competing with everything else and it is common that usability is sacrificed first! 36

  18. Where are Non-Functional Requirements Captured / Modeled? • Use Case Modeling – Bittner and Spence – p. 43 • In the RUP, we place the non-functional requirements in the Supplementary Specifications • But this is usually considered a ‘standard’….. • Consider: (Bittner and Spence: different categories!!!)  • Legal and Regulatory Requirements • e.g.: The customer must be of legal age to purchase alcohol. • Application Development Standards • e.g.: The system must be developed in accordance with the Rational Unified Process • Quality attributes of the system to be built must include usability, reliability, performance, supportability requirements • e.g.: The system must be available at least 90% of the time. • Constraints placed on the design and implementation of the system such as operating system, environments, … • e.g.: The system must be written in Java 2…. • Others… 36

  19. Supplementary Specifications •  Very misleading to think ‘supplementary specs’ are inferior or lesser than functional specs. • Many projects have run amuck because they did not consider these requirements. • May have formed a major part of the overall critical success criteria. • Consider the following problems / results: • E.g. System must support 300-500 simultaneous users; On entry into user acceptance testing, system supported eight simultaneous users; Developers had concentrated on the user interface and completely ignored this supplementary spec item. • Upon further review, it was noticed that the developer did not investigate any of the requirements beyond the scope of the most basic flow of events. • “Not surprisingly, the system was never deployed.” 36

  20. Supplementary Specifications – Complement to Use Cases • Note use cases can capturenon-functionalrequirements especially those that apply within the context of a single use case. • Use Supplementary Specs to capture non-functional requirements that are global in nature or do not vary from one use case to the next. • Within the Use Case: Typically, if the amount of interactionin use cases is large, the majority of requirements will be captured here and there may be just a few, global, non-functional requirements. • Within the Supplementary Specifications: Conversely, if the amount of interaction in the use case is small, then the majority of requirements may be captured as non-functional requirements and found in the Supplementary Specifications. • Keep a balance between using the use cases and non-functional requirements. • We need both if the overall requirements objectives are to be met. 36

  21. Non-Functional Requirements – the Process • Use Cases – Kulak and Guiney… • Identify the non-functional requirements • Validate with appropriate stakeholders • Document the requirements • Capture its name, its effect, both the system and business degradation that would result if the requirements are not satisfied • Best time to capture them when exploring the functional requirements • Document it right away from your sources of information (interviews, questionnaires, …) • Ask users about response times, what bothers them now; what is fine. • Be certain to differentiate between business-related concerns which can often be added to a use case description, with non-functional requirements. 36

  22. Non-Functional Requirements – the Process • Rank the non-functional requirements. Very Important! • Sometimes accommodating non-functional requirement may cost more than implementing the use case. • There is no free lunch, and some things are not worth the cost to accommodate. • e.g. Infinite availability; levels of performance. “Don’t let [a user’s] initial assumptions drive you into an architectural nightmare.” • Use a template to document the non-functional requirements, as found in our Use Case book, ~ p. 79. 36

  23. Use something like the table below. You may add ‘column attributes’ as needed. You may wish to categorize these (or not). If not, omit column. You may also wish to add columns. You may wish a priority column! 36

  24. Examples 36

  25. Supplementary Specifications • Inserted table(s) into Supplementary Specifications. • The Supplementary Specifications document constitutes an additionalartifact that we will be using. • Note also that in some cases, the non-functional requirements are called ‘analysis mechanisms’ (RUP) • Have ‘persistency mechanism’; security ‘mechanism,’ etc. Means that there will be some process to accommodate persistency, security, etc. 36

  26.  As analysis classes are identified, it is important to identify the • non-functional requirements that might apply to them • Classes that must be persistent are mapped to the Persistency Mechanism and tagged as persistent. Persistency tag: {persistent} • Classes that are maintained with the Legacy Course Catalog system are tagged to the Legacy Interface mechanism; • Classes for which access must be controlled (like who can read and modify instances of the class) are mapped to a Securitymechanism., etc. {security} or {secure mechanism} • Distributed classes mapped to a Distribution mechanism, etc.) (Often ‘control classes’ are distributed.) {distributed} Analysis Classes – Use of tags { … } Non-Functional Requirements Map UML – 36

  27. Use-Case Analysis Steps • Supplement the Use-Case Descriptions • For each use case realization • For each Analysis Class describe • responsibilities, etc…. • ….. Know (now) about analysis classes • their responsibilities, • the analysis mechanisms / non-functional requirements that these analysis classes need to implement (persistence, security, legacy, …) and • the collaborations required to support the functionality described in the use cases. • Unify Analysis Classes: Now lets review everything to ensure it is complete and consistent before moving on…. • Checkpoints 36

  28. <<boundary>> <<control>> <<entity>> <<entity>> Unify Analysis Classes The purpose of “Unify Analysis Classes” activity is to ensure that each analysis class represents a single well-defined concept, with non-overlapping responsibilities. Name of analysis class should capture role; (e.g. EnrollmentForm) Description of class should capture role played by class in the system. Merge classes that define similar behavior or represent the same thing. Merge entity classes that define the same attributes Aggregate behaviors of merged classes. If you do any of these things, make sure you update any supplemental use case descriptions where necessary. 36

  29. Supplementary Specification Glossary Use-Case Model Analysis Classes Evaluate Your Results Are the Names appropriate? Are the Descriptions accurate? Are classes that should be merged actually merged? Are appropriate entity classes merged? Are aggregations captured? 36

  30. Evaluating and Verifying •  Now, verify analysis classes meet functional requirements of the system. •  Trace down through the Use Case specifications for each Use Case. Are all responsibilities covered? Are domain / application objects captured? Properties? •  Verify the analysis classes and their relationships are consistent with collaborations that they may support. • If one class is sending messages to another, there is a collaboration needed. If one class defines an ‘array’ of objects from another class, have we modeled this as an aggregation! etc. • Very important that you evaluate your results at the conclusion of Use Case Analysis. 36

  31. Use-Case Analysis Steps • Supplement the Use-Case Descriptions • For each use-case realization • Find Classes from Use-Case Behavior • Distribute Use-Case Behavior to Classes • For each resulting analysis class • Describe Responsibilities • Describe Attributes and Associations • Qualify Analysis Mechanisms • Unify Analysis Classes • Checkpoints - Check the ‘quality’ of the model against criteria that the Designer looks for… 36

  32. Checkpoints: Analysis Classes • Are the classes reasonable? • Does the name of each class clearly reflect the role it plays? •  Does the class represent a single well-defined abstraction? •  Are all attributes and responsibilities functionally coupled? (What does this mean to you?) •  Does the class offer the required behavior? • Are all specificrequirements on the class addressed? 36 (continued)

  33. Checkpoints: Analysis Classes • Note: All checkpoints should be evaluated with regards to the use cases being developed for the current iteration. • The class should represent a single well-defined abstraction. If not, consider splitting it. • The class should not define any attributes and responsibilities that are not functionally coupled to the other attributes or responsibilities defined by that class. • The classes should offer the behavior the use-case realizations and other classes require. (These will be methods later…) • The class should address all specific requirements on the class from the requirement specification – the Use Cases in our case. • Remove any attributes and relationships if they are redundant or are not needed by the use-case realizations. 36

  34. Checkpoints: Use-Case Realizations • Have all the main and/or sub-flows been handled, including exceptional cases?\ • Have all the required objects been found? •  Have all behaviors been unambiguouslydistributed to the participating objects? • Have behaviors been distributed to the right objects? • Where there are several interaction diagrams, are their relationships clear and consistent? (next lecture) 36

  35. Review: Use-Case Analysis • What is the purpose of Use-Case Analysis? • What is an analysis class? Name and describe the three analysis stereotypes. • What is a use-case realization? • Describe some considerations when allocating responsibilities to analysis classes. • Describe the role of non-functional requirements in complementing functional requirements. • Describe the tie-in of non-functional requirements to use cases. 36