1 / 21

DEDEA STRATEGIC FRAMEWORK STAKEHOLDER BRIEFING 12 OCTOBER 2010

DEDEA STRATEGIC FRAMEWORK STAKEHOLDER BRIEFING 12 OCTOBER 2010. BACKGROUND. The Province has clustered the necessary infrastructure investments into: Logistics; Water and Energy; Telecommunications; Renewable Energy; Forestry and Agriculture; and Environmental Management.

Télécharger la présentation

DEDEA STRATEGIC FRAMEWORK STAKEHOLDER BRIEFING 12 OCTOBER 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DEDEA STRATEGIC FRAMEWORK STAKEHOLDER BRIEFING12 OCTOBER 2010

  2. BACKGROUND • The Province has clustered the necessary infrastructure investments into: • Logistics; • Water and Energy; • Telecommunications; • Renewable Energy; • Forestry and Agriculture; and • Environmental Management.

  3. BACKGROUND…cont • Strategic projects in each cluster are further organised into four geographic development zones: • Port Elizabeth and surrounds (Coega Industrial Development Zone); • East London and surrounds (East London Industrial Development Zone); • the Wild Coast Development Zone; and • the Central hinterland. • Green initiatives are also clustered geographically

  4. INTEGRATED WILD COAST TRANSPORT HUB MTHATHA

  5. INTEGRATED WILD COAST TRANSPORT HUB N2 TOLL ROAD APPROVED N2 MTHATHA N2

  6. INTEGRATED WILD COAST TRANSPORT HUB KEI-RAIL EXTENSION TO KOKSTAD PROPOSAL N2 MTHATHA N2

  7. INTEGRATED WILD COAST TRANSPORT HUB MTHATHA AIRPORT REFURBISHED N2 MTHATHA N2

  8. TWINNED GATEWAYS COEGA TO TAMBO SPRINGS Port of Ngqura, Coega IDZ COEGA IDZ PORT OF NGQURA

  9. Twinned Gateways Coega to Tambo Springs Port of Ngqura, Coega IDZ to/from Tambo Springs TO/FROM TAMBO SPRINGS COEGA IDZ PORT OF NGQURA

  10. RELOCATION OF “OLD PORT” INFRASTRUCTURE PORT OF PE AND PORT OF NGQURA RELOCATE FACILITES REMOVE OLD FACILITIES PORT OF PE REHABILITATE LAND

  11. UPGRADE OF EAST LONDON HARBOUR EAST LONDON PORT EXPANSION AND UPGRADING EAST LONDON PORT EXPAND AND UPGRADE SERVING EAST LONDON IDZ

  12. R72 / N2 / N6 LINK R72 / N2 BUFFALO RIVER CROSSING AND N6 UPGRADE TO GAUTENG TO FREE STATE N6 EAST LONDON N2 R72 PORT ELIZABETH

  13. NTABELANGA MULTI PURPOSE WATER RESOURCE DEVELOPMENT HYDROPOWER AND IRRIGATION Ntabelanga Multi Purpose Dam HYDROPOWER AND IRRIGATION

  14. PROJECT MTHOMBO OF PETROSA PETRO CHEMICAL REFINERY AT COEGA IDZ COEGA IDZ PETROSA WORLD-CLASS REFINERY (360 000 BARRELS CRUDE OIL/DAY)

  15. COEGA CCGT POWER STATION COASTAL POWER GENERATION, NETWORK STABILITY, REDUCED TRANSMISSION LOSSES, SECURITY OF SUPPLY, PRIMARY ENERGY DIVERSITY, REDUCED CARBON FOOTPRINT COEGA IDZ COEGA CCGT POWER STATION

  16. UNDERSEA CABLES BROADBAND ACCESS FOR THE EASTERN CAPE SEACOM OR EASSY CABLE FROM DURBAN EAST LONDON IDZ (DOCKING FACILITY) COEGA IDZ (DOCKING FACILITY)

  17. UNDERSEA CABLES BROADBAND ACCESS FOR THE EASTERN CAPE TELECOMMUNICATIONS CONNECTIVITY TO RURAL AREAS EAST LONDON IDZ (DOCKING FACILITY) COEGA IDZ (DOCKING FACILITY)

  18. RENEWABLE ENERGY – ELECTRIC VEHICLE MANUFACTURING FACILITY FOR SA’S FIRST LOCALLY DESIGNED ELECTRIC VEHICLE – THE JOULE EAST LONDON IDZ (PRODUCTION FACILITY 38 HA)

  19. THE KEY ARGUMENT • The Eastern Cape still remains vulnerable • Lagging behind in delivering critical Capital Investments, with further reduction in government spending on key catalytic interventions planned and a Provincial Budget deficit = slowed economic recovery • Thus, national intervention and private sector lobbying is key in realising these strategic interventions

  20. THANK YOU

More Related