1 / 32

The Dreamland Design+Build Methodology Phased Skatepark Deployment

The Dreamland Design+Build Methodology Phased Skatepark Deployment. Locals at Milton-Freewater’s Phase I park. Winston Presentation Download. This presentation is available for download from:. Dreamland Introduction. Our genesis: Portland’s “Burnside Skatepark” We employ no “laborers”

LionelDale
Télécharger la présentation

The Dreamland Design+Build Methodology Phased Skatepark Deployment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Dreamland Design+Build MethodologyPhased Skatepark Deployment Locals at Milton-Freewater’s Phase I park

  2. Winston Presentation Download • This presentation is available for download from:

  3. Dreamland Introduction • Our genesis: Portland’s “Burnside Skatepark” • We employ no “laborers” • All have been actively skateboarding for over 20 years • Passionate about skatepark quality • We’re “accountable” to the skateboard community

  4. Our Portfolio: Projects Large and Small • Newberg: 28,000 square feet • > $650,000 • Donald: 3,500 square feet • < $60,000

  5. Example Phased Projects Hood River, OR Milton-Freewater, OR Lincoln City, OR

  6. Portfolio: Newberg, Oregon • 28,000 square ft. • Rated an “11 out of a possible 10” (Thrasher Magazine) • Considered “the gold standard” by many professional skateboard athletes Awesome skatepark..best cement contours I've ever ridden, by far." Tony Hawk, ESPN Park Tour

  7. Portfolio: Brookings, Oregon • Recognition for its ability to fuel athletic progression • Lotus International, (Italian architectural magazine) • Cutter Consortium journal • Landscape Architecture Magazine • The “Third Best Skatepark in America” (AE.com’s community forum, 2003)

  8. Portfolio: Lincoln City, Oregon (II) • 2003 addition to existing skatepark • Said to represent a “watershed event” and a “whole new paradigm in skateparks” (Skaters for Public Skateparks) Lincoln City, Phase I completed 1999

  9. Problem: Nowhere to Skate • Skateboarding is a relatively new recreational activity • Participants have created de-facto “skateparks” in their communities • Urban areas • Commercial districts • Recreational activities belong in an appropriate setting, (e.g., a park) • Participant activity must be “migrated” from de-facto “skateparks” to new facility This poster depicts the mind set of some not provided adequate recreational alternatives

  10. Solution: A Successful Skatepark • Dreamland design metaphor: “Flypaper” • Flypaper is stinky • A successful skatepark must draw skaters by: • A.) possessing currently popular attributes (stairs, railings, benches, bowls) • B.) hosting prominent athletes (park becomes “coolest place in town”) • Flypaper is sticky • Skatepark must retain participants long-term by: • Remaining an engaging place to skate for 2, 5, 10 years and beyond

  11. Shared Goals: Winston & Dreamland • Winston Goals • Provide engaging facility for the community’s enthusiasts • Migrate participants into appropriate setting • Create positive recreational alternative for youths • Possibly: • Create landmark that draws world-class participants • Draws local participants into park, plus enables rapid athletic progression • Generate additional tourist revenue • Most towns with Dreamland parks have experienced notable economic benefit • Dreamland goals • Create a facility that contributes to our strong brand equity

  12. Process Overview (generalized) • Phase I: Project Initiation • Phase II: Design • Phase III: Specifications / Master Plan Update • Phase IV: Construction • Phase V: Launch Note: Process is often streamlined for smaller, pure design+build projects

  13. Phase I: Project Initiation • Introduction meeting • Key personnel: City + Dreamland • Establish protocol • Schedule development • Enumerate deliverables • Milestones / Dates • At times a site walk is desirable

  14. Phase I: Project Initiation (cont) • Data collection and base plans • Site analysis • Land use: past, present, and use relationships • Soil samples • Natural land slopes / elevations • Water access • Early CPTED analysis • Law enforcement involvement valued • Outcome of community citing meetings

  15. Phase II: Design • Design preparation: Contextual Inquiry (CI) • “We can’t just ask kids what they want” • CI Emphasizes actual behavior over stated preferences • Users have a difficult time predicting how they will interact with systems with which they have little experience • Example: Sony “boom box” focus group • Example: 1990 Commuter survey re: information service • Open Design Forums become more meaningful when contextually applicable

  16. Phase II: Design (cont) • Design preparation: Contextual Inquiry (cont) • Visit popular locations, take note of site attributes, and document participant interaction • Example: de-facto “skateparks” in Little Rock/North Little Rock, AR: • TCBY Plaza: ledges and railings • Capitol: ledges, benches, railings • Kanis skatepark: peanut bowl Photos of “skateparks” in Little Rock, AR

  17. Phase II: Design (cont) • Additional Constraints • Additional factors taken into consideration • Breadth of regional experience with sports • Long term proficiency of the skaters/BMXers • “Proficiency vector” • CPTED issues or concerns • Example: San Jose’s desire to locate a skatepark next to a handball court, blocking police view of the court • Potentially negative mixing of the two participant bodies

  18. Phase II: Design (cont) • Open Design Forums • Begin by seeding with locale-specific observations • Empower participants to brainstorm, illustrate • Walk away with physical representations of interests and desires North Little Rock, Arkansas

  19. Phase II: Design (cont) • Open Design Forums (cont) • Computer renderings used, but clay models are preferred for forums • 2D: • Difficult to convey true layout and ultimate “feel” • Appears to discourage interactivity • 3D (i.e., clay models): • Stimulates energetic discussion among broader group • Can be modified on-the-fly San Jose, CA, Roosevelt Park

  20. Phase II: Design (cont) • The “Concrete Curriculum;” Ensuring long-Term Engagement • Designing the “Autotelic Experience” • Autotelic derived from two Greek words meaning “self-contained activity,” AKA “the zone” • When proficiency exceeds presented challenges, state A2 is achieved, characterized by feelings of boredom. • Skateboarding & like sports possess an individualistic goal orientation, so A3 (anxiety) is a self-correcting state

  21. Phase II: Design (cont) • Team Design Workshops • Two Groups led by those most experienced in domain: • Street • Transition • Groups examine evidence, notes, and creates clay designs • Groups switch, then examine rival group’s design • Team vote is made, choosing best design • Final design is fine-tuned by entire team • Final design is “formalized” into specification form

  22. Example: Madras street

  23. Example: Buhl, ID

  24. Example: Portland, OR

  25. Phase III: Specs / Master Plan Update • Const. Specifications • ¾” crushed rock, 4” thick min. sub-grade, 3/8” rebar, 12” O/C • 4,000 psi concrete, 3” or 4” slump • “Controlled Joints” • Strategically controls cracking with 1” deep saw cuts, at min 10’ interval • Sealed while curing with Ever-Crete sealant • Detail documented, when necessary • Our partner: Beighley Associates • 30+ years experience in the area of Landscape Architecture

  26. Phase IV: Construction • Relationship exists between local const. participation and long-term park stewardship Dreamland and locals build Lincoln City, Rattenberg, and Newberg skateparks

  27. Phase V: Launch • Professionals will visit an opening, but this often costs you • Tony Hawk requires $20,000-$30,000 just to appear • However, if a bold design is in the works, they’ll typically arrive for free Hailey, Idaho’s opening day, June 2003

  28. End Result For Your City • Participants flock to new facility, because: • Professional Athletes Frequent Park • Media Coverage • Magazines • Internet • Eventually, on skateboarding videos • Rapidly becomes the “coolest place in the region” • In our experience, this often occurs to parks with a bold design before opening day

  29. Case Study: Hailey, Idaho • Hailey Idaho

  30. Case Study: Hailey, Idaho • Officially opened mid-June 2003 • To date the following professionals have visited: • Tony Hawk • Danny Way • Julien Stranger • John Cardiel • Peter Hewitt • Patt Duffy • Alex Chalmers • Aaron Harrison • Donny Barley • Ryan Wilburn • Bam Margera • Ryan Sheckler • Shaun White • And more…

  31. Case Study: Hailey, Idaho • End result: Hailey is the “coolest place in region” • Hailey has become the destination of travelers from throughout the US • Requires little effort to get local skaters to use park • Hailey is featured prominently in the popular Nichols/Charnoski film “Northwest” • Since June has hosted two major video crews: Anti-Hero and Transworld Video for inclusion in coming skateboard videos • Between challenging terrain and professional influence, local skateboarders will rapidly become exceptional athletes

  32. Conclusion / Questions? • Hailey, Idaho local Isaac rides his new skatepark • Contact us if you have questions Kent Dahlgren Dreamland Skateparks (503) 754-9078 www.dreamlandskateparks.com

More Related