1 / 5

CURRENT PROJECT GOCC ( GLOBAL OPERATIONS CONTROL CENTRE )

CURRENT PROJECT GOCC ( GLOBAL OPERATIONS CONTROL CENTRE ). In the present OCC we have only Technical and Short Term Scheduling representation.

alijah
Télécharger la présentation

CURRENT PROJECT GOCC ( GLOBAL OPERATIONS CONTROL CENTRE )

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CURRENT PROJECT • GOCC ( GLOBAL OPERATIONS CONTROL CENTRE )

  2. In the present OCC we have only Technical and Short Term Scheduling representation. • In the GOCC we will have Technical, Crew Tracking ( both Flight Deck and Cabin Crew ), Yield Management, Passenger Handling and Short Term Scheduling representation.

  3. We currently find that the time spent to make a decision during irregular operations is to long, due to the fact that all the role players are not immediately available at all times. • The current way of communicating is per telephone.

  4. GENERAL Renewing of mid range aircraft fleet

  5. We are in the process of replacing the current Airbus A300’s and Airbus A320’s with Boeing 737 - 800’s. • The current B747 - 200’s, B747 - 300’s and B747 - SP’s will be replaced with B747 - 400’s.

More Related