1 / 9

IntelliDrive Connectivity and the Future of Surface Transportation

IntelliDrive Connectivity and the Future of Surface Transportation. Certification Pilot May 5, 2010 Walton Fehr US Department of Transportation ITS Joint Program Office. Safety Pilot Roadmap (rev 14). CY 2010. CY 2011. CY 2012. CY 2013. Q1. Q2. Q3. Q4. Q1. Q2. Q3. Q4. Q1. Q2.

alyson
Télécharger la présentation

IntelliDrive Connectivity and the Future of Surface Transportation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IntelliDriveConnectivity and the Future of Surface Transportation Certification Pilot May 5, 2010 Walton Fehr US Department of Transportation ITS Joint Program Office

  2. Safety Pilot Roadmap (rev 14) CY 2010 CY 2011 CY 2012 CY 2013 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Initial Integrated Safety System Light Vehicle Builds Light Vehicle Driver Clinics & Performance Testing Ray Resendes, Mike Schagrin Driver Clinics Transit Vehicle Roadeo Heavy Vehicle Input to Industry standards based upon test results Device Updates Aftermarket Device Development Vehicle Updates Model Deployment V2V Benefits Assessment V2V Regulatory Decision Point Model Deployment Ramp-up and Preliminary Testing Model Deployment Full Scale Testing Independent Evaluation of Testing Activities Evaluation

  3. Certification Framework Tim McGuckin, OmniAir Team

  4. Certification Pilot Roadmap Draft (based on rev 13 of safety pilot roadmap and published Sources Sought Notice DTFH61-10-R-00026)) CY 2010 CY 2011 M A M J J A S O N D J F M A M J J A S O N D WC Orlando Spec. Development 2nd Spec Update 1st Spec Update Proposal/Device Submission DRAFT QPL Established Awards 1st Device Procurement Device Procurement for Field Test Issue Device Solicitation Qualification Testing / Tech. Eval. Certification Pilot Auth. to proceed Develop Qualification Tests Update Qualification Tests Qualification Test SOW OmniAir proposal including subs Spec. Review Cert. Pilot SOW Cert. Pilot Development Recommendation for the IntelliDrive Certification Organizational Structure and Process Pilot

  5. Goal of this Pilot • Pilot IntelliDrive System management processes at the same time we pilot IntelliDrive technology and applications. • Have useful tools in place to assist the technology and application pilot. • Include both the communication medium and the application elements in the pilot. (These would likely have separate certification processes in a full deployment.)

  6. Certification Framework Tim McGuckin, OmniAir Team

  7. Safety Pilot Roadmap (rev 14) CY 2010 CY 2011 CY 2012 CY 2013 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Initial Integrated Safety System Light Vehicle Builds Light Vehicle Driver Clinics & Performance Testing Ray Resendes, Mike Schagrin Driver Clinics Transit Vehicle Roadeo Heavy Vehicle Input to Industry standards based upon test results Device Updates Aftermarket Device Development Vehicle Updates Model Deployment V2V Benefits Assessment V2V Regulatory Decision Point Model Deployment Ramp-up and Preliminary Testing Model Deployment Full Scale Testing Independent Evaluation of Testing Activities Evaluation

  8. Task Alignment, Part 1 Spec Development leads to qualification test development Qualification test development is finished in time to be applied to the material from the 1st Device Procurement Qualification test is exercised on 1st devices

  9. Task Alignment, Part 2 Certification management structure is developed Qualification test is updated Entire process – management and qualification is applied to the 2nd device material

More Related