1 / 10

7-8 Work Problems

7-8 Work Problems. Objective: To solve work problems. 7-8 Work Problems. Use the formula: Work Rate X time = work done r t = w Work rate means the fractional part of a job done in a given unit of time. 7-8 Work Problems. Example 1:

arlo
Télécharger la présentation

7-8 Work Problems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 7-8 Work Problems Objective: To solve work problems

  2. 7-8 Work Problems • Use the formula: • Work Rate X time = work done • r t = w • Work rate means the fractional part of a job done in a given unit of time.

  3. 7-8 Work Problems • Example 1: • Sheri can rake the lawn in 2 h. Her work rate is the part of the job she can do in 1 h. • r t = w r = w/t r = 1/2 • Therefore  her work is ½ job per hour.

  4. 7-8 Work Problems • Example 2: • Josh can split a cord of wood in 4 days. • His father can split a cord in 2 days. • How long will it take to split a cord of wood if they work together.

  5. 7-8 Work Problems • Example 2: • Josh can split a cord of wood in 4 days. • His father can split a cord in 2 days. • How long will it take to split a cord of wood if they work together. • Step 1: Find the number of days the job will take them. • Step 2: Let x = number of days needed • Step 3: Since josh does the job in 4 days: his work rate = ¼.

  6. 7-8 Work Problems • Example 2: • Josh can split a cord of wood in 4 days. • His father can split a cord in 2 days. • How long will it take to split a cord of wood if they work together. • Step 3: Since his father does the job in 2 days his work rate =1/2.

  7. 7-8 Work Problems • Example 2: • Step 3: Josh’s part + Father’s Job is whole job. • Step 4: Solve 

  8. 7-8 Work Problems • Example 3: Robot A takes 6 min to weld a fender. Robot B takes only 5 ½ min. If they work together for 2 min. How long will it take Robot B to finish welding the fender by itself. • X = number of minutes needed for Robot B to finish. • Robot B’s work rate = 1  5 1/2 • 

  9. 7-8 Work Problems • Example 3: •  • A’s part of job + B’s part = whole job

  10. 7-8 Work Problems • Homework: P. 328 1 – 15 odds

More Related