Maximizing Airport Operations Using WAAS

Maximizing Airport Operations Using WAAS. 31 st Annual Airport Conference, Hershey March 19, 20087. What Airport Owners and Consultants Should Know about WAAS. FAA goal to increase publication of WAAS procedures to 500 per year

bao
Télécharger la présentation

Maximizing Airport Operations Using WAAS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Maximizing Airport Operations Using WAAS 31st Annual Airport Conference, Hershey March 19, 20087

  2. What Airport Owners and Consultants Should Know about WAAS • FAA goal to increase publication of WAAS procedures to 500 per year • FAA strives to provide the best approach, and lowest minimums for each WAAS procedure • New WAAS procedures at your airport can have a profound affect on Design Standards

  3. What Airport Owners and Consultants Should Know about WAAS Q: How much does a free WAAS procedure cost?

  4. What Airport Owners and Consultants Should Know about WAAS Q: How much does a free WAAS procedure cost? A: If you are not careful, more than you got!

  5. Typical non-precision RPZ

  6. Approach upgraded to Precision

  7. Any new procedure (including WAAS) impacts Airport Design Standards: 3 Changes that Affect Design Standards: • New non-precision approach procedure on runways that were visual approach only • Existing non-precision approach upgraded to a precision approach • Significant minimums lowered for existing non-precision approach

  8. What Should Airport Owners do to Prepare for new WAAS Procedures? • Understand the affect of a planned new WAAS procedure on your specific airport (Prior Proper Planning), • Update the ALP for the new procedure, • Survey the approach conditions to know the obstruction or get the best minimums (IAW A/C 150-5200-16, -17, -18)

  9. What Should Airport Owners do to Prepare for new WAAS Procedures? • Do not hesitate to request a change in the procedure (higher minimums, day/night restrictions, etc) to reduce impact until the airport can be improved to standards, • Implement improvements to support the new WAAS procedure(s) (buy land, easements, clear obstructions)

  10. Questions?