1 / 12

An update on ballast water management

Tripartite Tokyo October 2010. An update on ballast water management . International Chamber of Shipping. In February 2004 the International Convention for the Control and Management of Ship’s Ballast Water and Sediments, 2004, was agreed. Ballast Water Management Convention, 2004.

baxter
Télécharger la présentation

An update on ballast water management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tripartite Tokyo October 2010 An update on ballast water management International Chamber of Shipping

  2. In February 2004 the International Convention for the Control and Management of Ship’s Ballast Water and Sediments, 2004, was agreed

  3. Ballast Water Management Convention, 2004 • Enters into force • 12 Months after ratification by 30 States with 35% world’s GT • As of October 2010, 27 States (25.3%) have ratified the Convention. • Now realistic to project ratification requirement to be met by Mid 2011 and EIF Mid 2012 (MEPC 62?)

  4. Ballast Water Management Convention

  5. The Problem is that the dates are fixed! MEPC Resolution 188(60) “Recognising that while the requirements of Regulation B-3.3cannot be enforced prior to entry into force of the BWM Convention, it should be clearly understood that the ballast water management systems installed on ships constructed in 2010 will have to meet these requirements once the Convention enters into force”

  6. Practical Considerations • Japan has estimated that approximately 62,000 BW Treatment Systems will require fitting in this decade • New buildings of approximately 1400/year • Shipyard capacity (approx 100 shipyards) where are the fitting facilities? • BWMS Manufacturing capacity??? Availability is unknown • From NOW circa 20 ships/day require systems to be fitted to attain Convention compliance requirements! • Largest chokepoint identified by Japan as 2017 45 systems/day will be required to be fitted in 2017! • Proposed US Federal and State regulations demanding standards greatly in excess of Convention standards raise additional uncertainty

  7. Present state of BWTS development towards Type Approval NOW • 31 BWTS have been reviewed under the G9 IMO approval process • 10 BWTS have received Final Approval, 7 via G9 with 1 withdrawn (one not informed to IMO yet) • 1 system awaits G9 Final Approval and 2 others await evaluation for G9 Basic Approval by the GESAMP-BWWG

  8. Some Relevant Considerations in Choosing the suitability of a BWTS • Capital Cost • Running Costs • Footprint (include maintenance needs) • Power Consumption • Filtration needs • Level of Operator input required • Maintenance demands • Rate of Flow • Safety of Chemical storage • Chemical Availability • Water conditions in operating areas • Turbidity • Salinity

  9. Shipowners and Shipyards are now being required to make a substantial financial commitment – we have to get it right!The considerable challenges associated with the selection of suitable equipment and retrofitting must be met!Forward Planning is Paramount!

  10. Thank you

More Related