ARCHITECTURAL ASSESSMENT

ARCHITECTURAL ASSESSMENT. Mike Jackson, FAIA Deputy SHPO, IHPA. FEASIBILITY Architectural/Economics. The architectural, regulatory and fiscal variables that affect feasibility. The resources your Main Street program should have to facilitate feasibility studies.

beulah
Télécharger la présentation

ARCHITECTURAL ASSESSMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARCHITECTURALASSESSMENT Mike Jackson, FAIA Deputy SHPO, IHPA

  2. FEASIBILITYArchitectural/Economics • The architectural, regulatory and fiscal variables that affect feasibility. • The resources your Main Street program should have to facilitate feasibility studies.

  3. FEASIBILITYArchitecture = Economics • Budget Busters • Accessibility - Elevator • Structural – Floor load capacity • Life Safety • Sprinklers • Extra exit stairs

  4. YOUR BUILDING IS: • Real Estate (land & improvements) • Community wealth (tax base) • A piece of architecture • A part of history (many former owners/uses) • A environmental asset: embodied energy • Host of environmental hazards

  5. VALUEJUDGMENTS • Land value • Building value (current market) • Depreciated value (adjusted basis)* • Increases with improvements • Decreases with depreciation • Trigger value for tax credit eligibility • Insured value (replacement?) • Assessed value (property tax basis)

  6. LOCATIONCharacteristics • Political - City, county, state, township • Street address (Highway?) • Localdesignation • Main Street district • Historic District • Special districts • TIF, SSA, Enterprise

  7. LOCATIONCharacteristics • Zoning district • Parking requirement • No on-site requirement in most downtowns • Promote • Zero lot line • Uses • FAR (density) • Smart Codes …

  8. LOCATION Characteristics • Seismic http://earthquake.usgs.gov/earthquakes/states/illinois/hazards.php

  9. LOCATION - Flood Plain FEMA - FIRM - Flood Insurance Rate Maps www.fema.gov/hazard/map/flood.shtm

  10. UTILITIES & SERVICES • Electric • Gas • Water (size and pressure) • Sewer (interior and exterior adequacy) • Telephone • Cable • High speed Internet • Trash pick up

  11. BUILDING PROFILE • Size • Area • Stories • Construction type (from building code) • Structural system (check for adequacy) • Architectural attributes that are code triggers • Number of exits • Access to light and ventilation

  12. CODES & STANDARDS Building Codes National Models, adopted by gov’t American with Disabilities Act Secretary of the Interior’s Standards Code triggers based upon funding source Ex: HUD funding and lead paint

  13. INT. EXISTING BLDG CODE Proportional (not economic) classification of work: Repair (Ch. 4) Alteration – Level 1 (Ch. 5) Alteration – Level 2 (Ch. 6) Alteration – Level 3 (Ch. 7) Change of Occupancy – Ch. 8) Additions (Ch. 9) Historic Buildings (Ch. 10) Moved & Relocated Buildings (Ch. 11) Compliance Alternatives (Ch. 12)

  14. BUILDING USE • Current use (zoning classifications) • First floor • Upper floors Historic use (city directory, Sanborn map) • First floor • Upper floors Vacant (last known legal use) Kitchen and bath indicate residential use

  15. HISTORIC USE • Sanborn fire insurance maps are a valuable tool to evaluate a buildings original fire safety design attributes. http://collections.carli.illinois.edu/cdm4/index_sanborn.php?CISOROOT=/sanborn

  16. BUILDING PROFILE STRUCTURE (IBC 2000) Residential 40 psf Stairs and exits 100 psf • One & two family dwelling 40 psf • Office 50 psf, Corridor above 1st fl 80 psf • Lobbies and first floor corridor 100 psf • Original design (archaic materials) • Condition assessment

  17. BUILDING PROFILE • CONSTRUCTION TYPE (IBC 2000) • Type III (based upon fire resistance of building elements) • Exterior walls are noncombustible materials and interior building elements are of any material permitted by this code.

  18. CODES – FIRE RATINGS • Fire resistance ratings systems for building materials were the next step in the evolution of fire safety. Many historic and archaic materials were built before the modern rating systems were established. www.huduser.org/portal/publications/destech/fire.html

  19. INT. EXISTING BLDGCODE • Fire Protection – Sprinklers • Classification of work • Construction type • Non-combustible ? • Change of use or not? • Fire separation between floors

  20. CODE – SPRINKLERS • IEBC Historic Buildings • 1005.4 Occupancy separation • Occupancy separation of one hour omitted for buildings with approved sprinkler system throughout.

  21. Codes – Tin Ceiling Issue • Is a 1 or 2 hr use separation required? • Not if the same use hazard • Not if there is no change of use • Yes if a new residential unit in a former commercial space • Not if the building is fully sprinklered

  22. Codes – The Tin Ceiling Issue 1. Remove and reinstall over a new 1Hr rating. 2. Cover with an intumescent paint, 1 + hr separation www.firefree.com/allProducts.php

  23. Code – Alternative Compliance International Existing Building Code Method of quantifying safety Less prescriptive Requires written report by a design professional The role of the architect The role of the code official

  24. BUILDING ACCESSIBILITY Americans with Disabilities Act (ADA) Applied to public accommodations Is retroactive starting in 1990 Readily achievable test (economics) Elevator not required for two-story bldg if: Under 3,000 sq ft except for: Shopping center Medical office Does not apply to housing

  25. Building Accessibility ADA – Scoping provisions • In private buildings or facilities that are less than three stories or that have less than 3000 square feet (279 m2) per story, an accessible route shall not be required to connect [upper] stories (ex. shopping mall, health, transit) • Alterations made to provide an accessible path of travel to the altered area will be deemed disproportionate to the overall alteration when the cost exceeds 20% of the cost of the alteration to the primary function area. • Special provisions for historic buildings www.cdb.state.il.us/forms/download/iac.pdf

  26. Illinois Accessibility Code • VERTICAL ACESS EXCEPTION: However, privately owned public facilities are not required to provide vertical access in a building with two levels of occupiable space where the cost of providing such vertical access is more than 20% of the reproduction cost of the public facility; For the purpose of calculating percentages of reproduction cost, the cost of alteration shall be construed as the total actual combined cost of all alterations made within any period of 30 months. (Section 5, EBA).

  27. Illinois Accessibility Code • Privately financed alterations to housing are not covered by the Environmental Barriers Act or this Code • Fair Housing Act applies

  28. BUILDING ACCESSIBILITY • Fair Housing Act (1991) Does not apply to older buildings. The Act requires all newly constructed multi-family dwellings of four or more units intended for first occupancy after March 13, 1991, to have certain features: an accessible entrance on an accessible route, accessible common and public use areas, doors sufficiently wide to accommodate wheelchairs, accessible routes into and through each dwelling… <>

  29. LIGHT & VENTILATION Building depths greater than 80 feet are more difficult for residential use.

  30. LIGHT & VENTILATION Natural light requirement – 8% of floor area Natural ventilation requirement – 4% of floor area EXAMPLE WINDOW AREA 3’ X 6' = 18 sq. ft. per window x 3 windows 54 sq. ft. of window glazing 27 sq. ft. of vent opening MAXIMUM ROOM SIZE 54 sq. ft. is 8 % of 675 sq. ft. ROOM DIMENSION 19' wide x 35' long

  31. LIGHT & VENTILATION

  32. EGRESS REQUIREMENTS Three-story buildings require two means of egress from the third floor. Exits have to directly connect to a public right-of-way.

  33. ENVIRONMENTAL ASSESSMENT • Asbestos • Lead Paint • Underground storage tanks • Other • Prior industrial use (Sanborn map, history) • Bird droppings • Mold

  34. ENVIRONMENTAL ASSESSMENT • ASBESTOS: • Regulated by: • US Environmental Protection Agency • NESHAP (National Emission Standards for Hazardous Air Pollutants) State Environmental Protection Agency

  35. ENVIRONMENTAL ASSESSMENT • ASBESTOS – “trigger” points • Friable and non-friable materials • Minimum quantities of materials • USEPA – NESHAP does not apply to: • Residential buildings with 4 or fewer units • Demolition & Renovation • Demolition is the removal of a structural member • Notification requirement

  36. ENVIRONMENTAL ASSESSMENT • ASBESTOS • Survey when demolition or renovation is planned (qualified contractor) $ • Abatement (qualified contractor) $ - $$$ • Floor tile demolition (special qualifications) $ • Critical issue: $$$ • Asbestos in plaster

  37. ENVIRONMENTAL ASSESSMENT • LEAD PAINT Regulations EPA renovation rules • HUD & Dept. of Public Health • Residential units • State Environmental Protection Agency • Disposal • OSHA (worker protection) • HUD Guidelines (most well known) • Apply only when HUD funding is involved

  38. ENVIRONMENTAL ASSESSMENT • LEAD PAINT (IDPH) • Identification (XRF, chips, dust wipe) • Risk assessment • Treatment options • No hazard from intact materials • Interim control (special paint coatings) • Abatement (cover, remove paint or element) • Requires specialized contractors) $$$ Disposal (requirements based upon quantity)

  39. ENVIRONMENTAL ASSESSMENT LEAD PAINT Construction EPA Renovation Repair & Painting Residential units in pre-1978 buildings Lead-safe work practices Contractor certification www.epa.gov/lead/pubs/renovation.htm

  40. ENVIRONMENTAL ASSESSMENT • MOLD • This is a new relatively new topic of environmental concern, for which rules and regulations are currently being developed. • Controversy over the definition • Confusing market place • Technical note: • Plaster has a high lime content and is not a likely host for mold. Drywall, with its cellulose (paper) surface is a very good host for mold.

  41. HISTORIC CLASSIFICATION • Historic status allows building code alternatives: • Status based upon designation or eligibility • Local designation • National Register listed properties • www.nationalregisterofhistoricplaces.com/tx/state.html • Eligibility to be listed properties • Contact your local pres. Comm. or SHPO

  42. HISTORIC CLASSIFICATION • Historic designation status: • Individual building • Contributing building to a district • National Register • Local landmark • Eligibility (50 years +) • Age (pre 1936) • Architectural style classification

  43. HISTORIC DESIGN • Secretary of the Interior’s Standards for Rehabilitation • Local commission review of exterior • SHPO review if project has state/federal funding, permits or licensing • SHPO review of entire building.

  44. ARCHITECTURAL FEATURES • Facades: Primary, Secondary, Tertiary • Condition assessment • Special features (architectural) • Time period of significance/alterations

  45. ARCHITECTURAL FEATURES Interiors • Primary, secondary, tertiary • Special features • Architectural elements • Fireplaces • High ceilings

  46. ARCHITECTURAL FEATURES • Exposing the brick in historically finished spaces does not meet Preservation Standards.

  47. The BALCONY ISSUE • Condo versus rental units • Urban more than a rural issue

  48. Life Cycle Assessment - LCA www.preservationnation.org/issues/sustainability/green-lab/valuing-building-reuse.html http://tinyurl.com/nthpqvbr

  49. Life Cycle Assessment – LCA Main Street Mixed Use 42 – 80 Years http://tinyurl.com/nthpqvbr

  50. ENERGY AUDITS • Roof • Slope • Condition/warranty • Gutters & downspouts • Structural adequacy Infrared roof inspection