Emergency Response and Control Procedure (HSE-S-229)

Emergency Response and Control Procedure (HSE-S-229). Best ERCP practices at RIL Jamnagar. OBJECTIVES. To Contain and Control Emergency Incidents To Prevent Loss of Life Minimize Damage to Company Installations and Public Property

boris-ross
Télécharger la présentation

Emergency Response and Control Procedure (HSE-S-229)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Emergency Response and Control Procedure (HSE-S-229) Best ERCP practices at RIL Jamnagar Emergency Response & Control Procedure

  2. OBJECTIVES • To Contain and Control Emergency Incidents • To Prevent Loss of Life • Minimize Damage to Company Installations and Public Property • Minimize Adverse Impact on Environment • Provide Maximum Possible Safety to the personnel. • Comply with Statutory Regulations

  3. EMERGENCY SCENARIOS • Explosion • Fire • Toxic Gas Release • Oil Spill • Cyclone • Earth Quake • Flood • Air Raid • Product/Transport Emergency • Marine Emergency

  4. BEST PRACTICES

  5. BEST PRACTICES • Assembly points are located at all process ,non process units & buildings. • Identified emergency control centers along with mobile center with all facilities. • Flip charts of Major Emergency Management Plan (MEMP) are available at all strategic locations. • Monitoring screen is available in the emergency control center to monitor and effective mitigation of the incident. • Campaigns are conducted to increase the awareness among employees and contractors. • Pre Incidence planning action plans are available for all credible scenarios.

  6. MEMP • MEMP flip charts are available at all control rooms.

  7. MOBILE EMERGENCY CENTER

  8. CORRECTIVE ACTION TRACKING

  9. ASSEMBLY POINT • We ensure that all the persons working in the area know the nearest ASSEMBLY POINT and ESCAPE ROUTE.

  10. Process Emergency Noticed in the Plant/Field Input from emergency site through F&G,VHF, PA system, Hotline, Telephone, Manual call point or messenger Plant Control Room (Panel Officer – 1) Fire Control Room Shift Field Engineer SSM Plant Control Room (Panel Officer – 2) Shift Superintendent Shift Fire Manager Site President Plant HR Coordinator Fire Chief/Dy. Fire Chief Shift Maint. Technician (Mech./Elec./Inst.) PM/HOD Lead Mech Manager E&M Chief Utility C/R – Shift in Charge Sector Chief Lead Inst. Manager Lead Elect. Manager Emergency Maint. Crew Medical CECR Members (HSEF / PR / Commercial / CES / CTS /HR/IT Materials Lead Maintenance Sector Chiefs (Mech., Elect., Inst., Civil) Security HSEF - Chief • P&M Chief • Civil maintenance chief EMERGENCY COMMUNICATION MATRIX

  11. LEVEL-2 ORGANISATION Emergency Response & Control Procedure

  12. FACILITIES AT MECC • Radios • Personal Computer • Marker Boards • Meteorological Instruments • Flame proof torches • Self Contained breathing apparatus-6nos • First Aid boxes • Important Telephone Numbers • Layout Drawings of Site • MSDS • Location of Safe Assembly points • Potable water and adequate cool Drinks

  13. PRE INCIDENT PLANNING Major elements of PIPA are • Details of Incident • Detection of Incident • Fuel Supply Reduction Measures • Consequence Analysis • Safe working area for fire fighting • Fire fighting –Action plan • Resources Quantification • Transport Arrangement for Emergency Teams • Checklist for Emergency Management

  14. PRE INCIDENT PLANNING • Sample PIPA scenario considered as a case study is presented for • “Major Fire in Fractionator bottom re-circulation pump strainer in Coker Complex”

  15. THANKS !!