1 / 3

PHENIX Timetable

PHENIX Timetable. Jan 2001. May 2001. Jan 26 2002. March 2002. June 2002. Sept 2002. FY 2003. FY 2002. Prepare S m. S m with Au-Au beams. p-p. Run N m & S m. 1 st mm physics (J/  suppression & single m ’s). 2-Arm physics. Install N m chambers.

chesna
Télécharger la présentation

PHENIX Timetable

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHENIX Timetable Jan 2001 May 2001 Jan 26 2002 March 2002 June 2002 Sept 2002 FY 2003 FY 2002 Prepare Sm Sm with Au-Au beams p-p Run Nm & Sm 1stmm physics (J/ suppression & single m’s) 2-Arm physics Install Nm chambers Build Nm chambers Install Nm FEE Start Building Nm FEE Complete Nm FEE Fix Sm Run MVD Prepare MVD (60%) Run MVD Finish MVD 1st MVD physics (dN/dη, vertex & fluctuations) p-p Au-Au Beams Beam Si vertex upgrade R&D for charm physics In FY2003 d-A, p-p and Au-Au collisions are all likely

  2. History of the LANL HENP Program E772 (1987 - …) DY, J/Y, Y’, U Nuclear Dep. Spokesman: Moss NA44 (1990 - …) Bose-Einstein Corrlations,… Jacak, Sullivan,van Hecke E789 (1990 - …) sbb, sJ/Y, D0 Nuclear Dep. Spokesman: Peng SSC (GEM,SLD 1990 - …) GEM Silicon tracker (Brooks, Lee, Palounek) E866/NuSea (1996 - …) , J/Y, Y’, Nuclear Dep. Spokesmen: Garvey,McGaughey,Leitch PHENIX (1990 - …) Muons: J/Y, single-m, open-charm, spin, p-A, QGP MVD: dN/dη, ZVERTEX E906 (2006?) at high-x, parton dE/dz Spokesman: Reimer (ANL)

  3. People & Highlights of Responsibilities • Physicists: • Barnes (1/2 on EDM, return-to-research funding ended last year) : chamber construction, PHENIX physics. • Brooks: m-tracking detector council representative, m-software leader, m-electronics, PHENIX Institutional Board representative. • Garvey(retired) : E866, eRHIC, advisor to BNL management & John Browne, RHIC program supporter but no direct involvement in PHENIX. • Hansen (postdoc) : hadron physics, MVD electronics & software. • Lee : chamber construction manager, silicon-vertex upgrade. • Leitch: HENP team leader , m-electronics, m-calibration system, m-software, J/ suppression, p-A, shadowing, parton energy-loss, E866 spokesman, PHENIX Executive Council • McGaughey : m-electronics, m-calibration system, m-software, parton enegy-loss, silicon-vertexupgrade LDRD spokesman, former E866 spokesman, E906. • Liu (newest staff member) : m-electronics, m-software, online monitoring, spin physics • Mischke(now off the program) : was m-electronics manager & is now expert consultant. • Moss : spin physics, parton energy-loss, silicon-vertex upgrade, APS DNP chair. • Peng (1/4 time on EDM; leaving LANL in Jan) : E866 physics, parton energy-loss, p-A and parton physics at RHIC, PHENIX upgrades, extensive long-range planning work, FNAL/E906, JHF. • Sullivan :MVD PHENIX detector council representative, hadron physics, MVD electronics & software. • Van Hecke :MVD ancillary systems & DAQ, hadron physics • Engineers • Boissevain (1/4) : MVD constuction, m layout engineering. • Sondheim (funded by construction $’s) : PHENIX mlead engineer & system integration

More Related