1 / 16

Final Intern Presentation

Final Intern Presentation. 6 August 2008 • Jordan Budisantoso. Office Recycling. 46 Cubicles Goal: 2 Weeks. Construction = Limited Space => Slight Delay Currently have 2 Roll-offs Ad Campaign/Kick-off Event. 3 Bins (We have 1 need 2 more) Cardboard + Paper Plastic + Aluminum + Glass

Télécharger la présentation

Final Intern Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Final Intern Presentation 6 August 2008 • Jordan Budisantoso

  2. Office Recycling • 46 Cubicles • Goal: 2 Weeks

  3. Construction = Limited Space => Slight Delay Currently have 2 Roll-offs Ad Campaign/Kick-off Event 3 Bins (We have 1 need 2 more) Cardboard + Paper Plastic + Aluminum + Glass Trash Office Recycling

  4. Some Examples….

  5. Plant Recycling • 60 drums per hour • Drum Size: 32.8lbs • 27-30 Drums per 3yd Bin • Self-tipping hoppers dump into Roll-offs

  6. Plant Recycling

  7. Reapplication (Supporting Hanieh)

  8. Changeover Checklists (Supporting Hanieh) • Created Checklist Template as well as actual checklists for equipment

  9. Bill of Materials • Supporting Tim & Nien in building a (BoM) for equipment for replaceable parts

  10. Floor Map (Supporting Rudy) • Per Rudy’s specifications, created a floor map (not to scale) to accommodate his needs for estimating the max number of pallets of corrugate he can have

  11. Written Quote from Valley Vista Services • At full capacity, plant produces an average of 2,500 empty drums per week. • At estimated $105.00 per ton (quote provided by Valley Vista Services), this equals an approximate$17,325 in metal rebates per month. FREE!!!

  12. Goals Accomplished • Planning of Office Recycling Program • Completed Recyclable/Waste Table • Finalized pick-up proposals with Valley Vista Services • Mapped out recycling area

More Related