An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DEALING WITH UNCERTAINTY: Wind Resource AssessmentD. C. McKay ORTECH PowerPresented atEnvironmental Finance Workshop Series University of TorontoOctober 12, 2005

  2. 10 Steps in Building a Wind Farm Understand Your Wind Resource Determine Proximity to Existing Transmission Lines Secure Access to Land Establish Access to Capital Identify Reliable Power Purchaser or Market Address Siting and Project Feasibility Considerations Understand Wind Energy’s Economics Obtain Zoning and Permitting Expertise Establish Dialogue with Turbine Manufacturers and Project Developers Secure Agreements to Meet O&M Needs

  3. Considering a Wind Farm? Need to Consider • Revenue • Capital Costs • Operational Costs All carry uncertainty

  4. Why Estimate Uncertainty? • Uncertainty is inevitable • Understanding its origin is important to: • Know it • Control it • Be prepared for it

  5. Who wants to know? • You • To set contingencies • To conduct realistic sensitivity analyses with financial model • To assess project feasibility • To qualify for competitive financing • Your lender/ financier

  6. Uncertainty on Revenue side: Wind Resource Assessment • Wind shear • Long term Variation • Monitoring • Wake Estimate • Noise • Power Curve

  7. Sources of Uncertainty:Wind Shear

  8. Sources of Uncertainty:Wind Shear • Profiling & Extrapolation • Log law or power law U(z1)/U(z2)=(z1/z2)^p • p ~ height, roughness, terrain, direction & stability • wake & turbulence

  9. Sources of Uncertainty:Wind Shear • Can only be eliminated if wind is monitored at hub height • Often no hub height measurement available when feasibility of project is assessed

  10. Sources of Uncertainty:Wind Shear • Uncertainty value for Wind Shear +/- 20-25% Sources: • Wind Resource Analysis Program 2002, Minnesota Department of Commerce, http://www.state.mn.us/mn/externalDocs/WRAP_Report_110702040352_WRAP2002.pdf • Project specific estimates

  11. Sources of Uncertainty:Long Term Variation

  12. Sources of Uncertainty:Long Term Variation • E.g. • 25 years long term data available (d.o.f. = 24), standard deviation of sample (s = 15%)=> good measure of year to year variation • 99% confidence interval = 7%t…student-t , t(d.o.f., confidence level)=> good measure of long term average

  13. Sources of Uncertainty:Long Term Variation • Climate Change • Mean levels of wind energy • Fluctuations of wind energy

  14. Sources of Uncertainty:Wind Resource Monitoring • Systematic error • Calibration of instrument • Quality of instrument • Installation (effects of tower, mounting arrangements) • Surrounding terrain, obstructions, etc. • Instrument icing/ malfunctioning • Type B ≈ +/- 5% • Random error • Data recovery rate, electronic noise • Reduced by increasing number of samples • Type A ≈ +/- 1%

  15. Sources of Uncertainty:Wind Modelling • Wind Models • Flow Model Vs Wind Climate Model • Diagnostic Vs Prognostic • Meso-scale Vs Micro-scale (Coupling) • Physics (hydrostatic / non-hydrostatic, compressible / non-compressible, friction, turbulence closure)

  16. Sources of Uncertainty:Wind Modeling • Input to Models • Land Use, Seasonal Variations • Terrain (resolution & accuracy) • External Forcing (pressure gradients, solar radiation, stratification, temperature difference between land and water)

  17. Sources of Uncertainty:Wind Modelling • Wake Modelling(project specific estimate of 2%) • Model ValidationDifference between WAsP and MS-Micro Models <2% on project example Difference between WAsP and more advanced models 25%+ • Noise Modelling

  18. Sources of Uncertainty:Turbine Power Curve

  19. Sources of Uncertainty:Turbine Power Curve

  20. Other Factors in Production Estimating • Power curve guarantee • Availability and maintenance time • Electrical losses • Time dependent performance deterioration (blade soiling) • Blade icing and extreme weather

  21. Total Contribution +/- Wind Shear 20.0% Long Term Variation 7.0% Monitoring 5.1% 23.5% Modeling 5.0% Wake Estimate 2.0% Power Curve 7.0% Combination of Uncertainties • Project example

  22. Summary • Rational quantification of revenue estimate uncertainty is essential • Wind shear is often biggest contributor to uncertainty • Redundant modeling helps to keep model uncertainty down • Monitoring at as many locations as possible and as close as possible to hub height will reduce uncertainty • Other loss factors need be considered