An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Principles of Engineering System Design Decision Making in System Design Dr T Asokan asok@iitm.ac.in

  2. Columbia Disaster • Columbia’s 28th mission was originally scheduled for launch in January 2001. • Technical problems led to number of postponements (about 18) and finally set for 16th Jan. 2003. • Some of the insulation tiles had come loose in the previous launches and many engineers felt that the launch should be postponed till it was rectified. • Top level management took the decision to go ahead. • During the launch few tiles ripped off and possibly damaged the wings. • Management decided to go ahead and not to interrupt the mission. • With wing temperatures over 1500 and speed exceeding mach 24, Columbia disintegrated while entering the atmosphere.

  3. Decision making in Systems Design • Many important decisions are made during the development • process • Most of the decisions are not made via a rational, explicit • process • Many uncertainties are to be tackled while making decisions • An important point in decision making is that decisions have • to be made with the best information available at the time, • realizing that the outcomes associated with the decision • remain uncertain when the decision is made. • Level of detail needed to make decisions in the engineering of • a system and the level of detail needed to ensure proper • implementation of the system’s components and CIs need to • be understood clearly.

  4. Elements of decision problems • Creative generation of alternatives • Identification and quantification of multiple conflicting criteria • Assessment and analysis of uncertainty associated with the what is known and what is unknown about the decision situation.

  5. Two approaches • Lateral Thinking • Vertical Thinking

  6. Decision Making by Search Process

  7. Axioms of Decision Analysis • Probability: A common approach in engineering • Order rule: Our preferences are well defined that any possible list of outcomes associated with the alternatives can be ordered from least preferred to most preferred on each objective in the fundamental objectives hierarchy. The ordered list must be transitive. • Substitution rule: Willing to substitute any combination of outcomes if we are indifferent between them.

  8. Example: Lottery Pick six numbers out of 49. Assume Rs 10,000,000 as prize money

  9. Influence Diagrams and Decision Tree

  10. Decision Trees

  11. Dry Regret 0.65 0.7 SAC 0.3 wet 0.75 Relieved Perfect 0.9 Dry 0.7 OAT 0.3 Disaster 0 wet Should we have the function in SAC or OAT? Expected Utility (SAC)= 0.7x0.65 +0.3x .75= 0.68 Expected Utility (OAT)= 0.7x0.9 +0.3x 0= 0.63

  12. Example: 2 • A company is trying to decide whether to build a conventional or automated plant to produce a new product with an expected life of 10 yrs. The decision must be based on the size of the market for the product. • Demand is expected to be any of the following 3 cases. • High during the first two years and if found unsatisfactory by the users, low thereafter • High over the next 10 yrs • Low over the 10 years

  13. INFLUENCE DIAGRAMS • A graph-theoretic representation of a decision. • Four Nodes: Decision, chance, value and deterministic • Directed arcs between the nodes • A marginal or conditional probability distribution defined at each chance node, value node and deterministic node. • Decision nodes as square boxes, Chance nodes as Oval, value nodes as square with rounded corners

  14. Requirements allocation decision for elevator system Power technology Cost Cost Requirements Fundamental objectives Hitech control Hi Tech Power Low risk Performance Performance requirements Controller Technology Availability Availability Requirements

  15. Risk Management Risk= Exposure to the chance of loss Risk: The combination of the probability of an event occurring and the significance of the consequences of the event occurring. • Strategies • Avoidance, Transference, Management, Analysis Dealing with Risk: Activity of managing the risks through various processes Risk Avoidance: Selection of low risk alternative Risk Transference: Options that transfer the risk to others Risk Management: Use of fall back options in case a riskier option fails Risk Analysis: Addresses risk explicitly when decisions are made in uncertain situations.

  16. Win .5 $1000 Loose .5 Risk Analysis • Utility or Risk Preference Function Win .1 $100,000 Loose .9 $-10 $-10000 EV (1)=490; EV (2)= 1000 Certain Equivalent: The value the decision maker is willing to accept

  17. Risk Premium xpof an event is the difference between the expected value and the certain equivalent. • Risk-Averse decision: xp> 0

  18. Decision making under uncertainty is commonly encountered in various stages of system design • Identification and quantification of conflicting criteria is very important. • Various tools are available to help the designer in arriving at a decision THANK YOU