1 / 7

NGS role in supporting to FAA

Overview of AC 150/5300-18B. Where to Start. Understand the survey requirements as specified in the SOWAirport Geodetic Control (2.6.10.1) Runway (2.6.10.2)Navigational Aid (2.6.10.3)Obstacle Analysis (2.7)Vertically Guided Surfaces (2.7.1)Obstacle criteria (2.7.1.2) Non-Vertically Guided Surfaces (2.7.1.3)Obstacle criteria (2.7.1.4).

davin
Télécharger la présentation

NGS role in supporting to FAA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. NGS role in supporting to FAA

    2. Overview of AC 150/5300-18B What information you, as the SME, are expected to Identify, Collect and Deliver What information you, as the SME, are expected to Identify, Collect and Deliver

    3. Where to Start What information you, as the SME, are expected to Identify, Collect and Deliver What information you, as the SME, are expected to Identify, Collect and Deliver

    4. Airport Obstruction Chart

    5. Airport Safety Critical Data

    6. Chapter 5: Data Content Standard and Specifications What information you, as the SME, are expected to Identify, Collect and Deliver What information you, as the SME, are expected to Identify, Collect and Deliver

    7. The Big Picture

    8. 150/5300-18B Data Content Standard

More Related