An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHRIRAM FOUNDRY LTD.MACHINE SHOP Sept. 2011

  2. TEAM MEMBER:- • Mr.P.K.PATIL • Mr. R.R.NERLEKAR. • Mr.S.R.HIREMANI. • Mr.G.M.SHAIKH • Mr.S.B.PATIL

  3. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET FRONT HUB - 10001946 ( Rough to finish Component in production. 400 nos casting stock at our end & 144 ready for dispatch.Job in production.

  4. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET ROTTER - 10009996

  5. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10019717 Spline Total 62 nos CR rejected at 5/8 tapped hole.After remove the setting casting received.

  6. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10013811

  7. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10019759 96 nos ready for dispatch.

  8. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET FRONT HUB – 10003845

  9. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 476.0 Casting received delay component in production. Dispatch plan on 7th Oct

  10. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 413.0

  11. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 266.0

  12. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 800.2 CR 43 nos, MR 05 nos.

  13. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 190.0 Casting received delay component in production. Dispatch plan –on 4th Oct

  14. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 145.0

  15. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Nabe 2222845

  16. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Nabe 1975457 Turning completed & pending for drilling..

  17. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB 1946 6.5x200 TS DRILL 04 NOS. RS 2600/- TOOL COST RS. 41.24 Note:- To calculate labor cost take 35% overhead on Basic+DA

  18. COST DETAILS(ITEMWISE) PART NAME & NUMBER:-CONMET ROTTER 9996` Casting to Finish Note:- To calculate labor cost take 35% overhead on Basic+DA

  19. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – 9717 Note:- To calculate labor cost take 35% overhead on Basic+DA

  20. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – 9759 Ø16.570 carbide drill Rs. 6500 /- 01 nos Tool Cost Rs. 45.20 Ø24 U Drill 1 nos. & SHR/450 4 nos Total Rs. 24925 Tool Cost Rs.-58.90 Note:- To calculate labor cost take 35% overhead on Basic+DA

  21. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – 3845 SRDCL -2525 HOLDR RS. 1500 & Ø 10.90 CARBIDE DRILL RS. 2500/ TORAL RS. 4000/- TOOL COST RS. 40.76 Note:- To calculate labor cost take 35% overhead on Basic+DA

  22. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – 3811 Note:- To calculate labor cost take 35% overhead on Basic+DA

  23. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – NEB HUB 5457 Note:- To calculate labor cost take 35% overhead on Basic+DA

  24. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – NEB HUB 2222845 Note:- To calculate labor cost take 35% overhead on Basic+DA

  25. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 642 Ø13 carbide Drill Rs. 5240 Tool Cost Rs. 40.61 Note:- To calculate labor cost take 35% overhead on Basic+DA

  26. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 266 Total Production 10 nos. So Insert Life next month SVVNN-2525 Holder 1 Nos. Rs. 4500/- Tool Cost Rs. – 101.35 Note:- To calculate labor cost take 35% overhead on Basic+DA

  27. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 413 Rough grooving resharp insert stock complited,new insert under trial cost planned 175 RS per job. A4 SMR Holder Rs. 4500/ Casting Problem CNMA 120412 Insert Breakage Tool Cost Rs. 208.00 Casting Problem CNMA 120412 TT 7310 Insert Breakage Tool Cost Rs. – 150.35 Note:- To calculate labor cost take 35% overhead on Basic+DA

  28. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 189-190 4ASMR -2525, 1 HOLDER & Ø11.1 CARBIDE DRILL RS. 8000 TOOL COST RS. 34.89 Note:- To calculate labor cost take 35% overhead on Basic+DA

  29. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 145 Rough grooving resharp insert stock complited,new insert under trial cost planned RS 145 per job. 4ASMR -2525, HOLDER 3 nos Rs. 13500 TOOL COST RS. 185.72 Note:- To calculate labor cost take 35% overhead on Basic+DA

  30. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 476 Note:- To calculate labor cost take 35% overhead on Basic+DA

  31. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 800.2 Rough grooving resharp insert stock complited,new insert under trial cost planned 230 RS per job. TDT 4 E .04 K-10 Insert New Insert & TTER Holder 3 nos / A4SMR Holder 1 nos Tool Cost Rs. 422.88 Note:- To calculate labor cost take 35% overhead on Basic+DA

  32. MACHINE UTILISATION IN % (CNC)

  33. MACHINE UTILISATION IN % (CNC)

  34. MACHINE UTILISATION IN % (CNC)

  35. MACHINE UTILISATION IN % (CNC)

  36. Majour Losess Details (Whole shop)

  37. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET HUB 1946 PRD-931 NOS, IN H MR-2.69%( 25) PRD-461 NOS, IN H MR-1.52%( 7) SF MR- 0.22% (1) PRD-284 NOS, IN H MR 1.06%( 3) SF MR 0.35% ( 1) ***ACTION ON MAJOR REJECTION CAUSES

  38. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET ROTTER 9996 PRD- 813 NOS, IN H MR 5.29% (43 ) Due to improper fettling – 10 nos,Due opt neg at spot face,Wall shift 5 nos. PRD- 1222 NOS, IN H MR 2.86% (35 ) PRD- 1285 NOS, SF MR 1.25% (16 ), IN H MR1.48% (19 ) ***ACTION ON MAJOR REJECTION CAUSES

  39. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET HUB 3845 PRD-626 NOS, IN H MR 3.67% ( 23) SF MR 0.16% (1) PRD- 680 NOS, IN H MR 2.21% ( 15),due to wall shift 3 nos,damage 2 nos. ***ACTION ON MAJOR REJECTION CAUSES

  40. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET 10003811 PRD- 198 NOS,, IN H MR 3.03%(6), ***ACTION ON MAJOR REJECTION CAUSES

  41. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET 10009717 PRD- 256 NOS,, IN H MR 2.73 %(7) ***ACTION ON MAJOR REJECTION CAUSES

  42. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET 10009759 PRD-499NOS,, IN H MR 9.02%(45), PRD- 672NOS,, IN H MR 0.89%(6), SF MR 0.60%( 4) PRD- 416 NOS,, IN H MR 1.44%(6), ***ACTION ON MAJOR REJECTION CAUSES

  43. REJECTION DETAILS(ITEMWISE IN %) Part Name:- PULLEY 800.2 PRD- 213 NOS,, IN H MR 8.92 %(19), SF MR 0.47%(1) PRD- 312NOS,, IN H MR 0.96%(3), ***ACTION ON MAJOR REJECTION CAUSES

  44. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Pulley 413 PRD- 185 NOS IN H MR 3.24 %(6) . PRD- 118 NOS IN H MR 0.85 %(1) . PRD- 123 NOS IN H MR 0.81 %(1) . ***ACTION ON MAJOR REJECTION CAUSES

  45. REJECTION DETAILS(ITEMWISE IN %) Part Name:- PULLEY 266.1 14.63 %(12),Due PRD- 82NOS,, IN H MR to improper clamping 3 nos,size variation problem 6 nos. PRD- 114 NOS,, IN H MR 4.39 %(5), PRD- 88NOS,, IN H MR 14.77 %(13), SF MR 1.14%(1) ***ACTION ON MAJOR REJECTION CAUSES

  46. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Pulley 476 PRD- 480NOS, I H MR 1.04% (5) SF MR 0.21% (1) PRD- 297 NOS, I H MR 0.34% (1) ***ACTION ON MAJOR REJECTION CAUSES

  47. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Pulley 190 PRD-169NOS, PRD- 371NOS,, IN H MR 0.27 %(1) ***ACTION ON MAJOR REJECTION CAUSES

  48. REJECTION DETAILS(ITEMWISE IN %) Part Name:- ECC HUB 790/791/858.1/859.1 PRD- 422 NOS,, IN H MR 1.66 %(7) SF MR 2.61% ( 11) PRD- 941NOS,, IN H MR 3.93 %(37) SF MR 1.28 % (12) (34 NOS OF HUB 858.1 & 3 Nos of Hub 791.1 rejected due to machine trial in sletting PRD- 1129NOS, IN H MR 0.62 %(7) SF MR 1.06% (12) ***ACTION ON MAJOR REJECTION CAUSES

  49. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Nabe Hub 2222845 /Nabe hub 5457 PRD- 289NOS, IN H MR 3.11 %(4) SF MR 1.38 % (10) PRD-208NOS, IN H MR 1.44 %(3) SF MR 0.96%(2) PRD-266NOS,, IN H MR 2.63 %(7) ***ACTION ON MAJOR REJECTION CAUSES

  50. OVERALL REJECTION (All Parts) Conmet – 1 nos Porosity at flange face,800.2 pulley circlief groove problem. PRD- 6198 IH MR- 3.22% SF MR 0.58% PRD- 6602 IH MR- 2.36% SF MR- 0.44% PRD- 6472 IH MR- 2.16% SF MR 0.22% 2 JOBS FOUND OVERSIZED FOR PILOT DIA. 219.760