Case Study ITER-like Wall Project WBS

Case Study ITER-like Wall Project WBS. Malcolm Kear. Work Breakdown Structure Approach (WBS) Work Packages and their content Planning and Resourcing SAP and WBS(e) numbers JOC Expenditure Log Conclusions. Case Study ITER-like Wall Project WBS. Contents of Presentation.

donald
Télécharger la présentation

Case Study ITER-like Wall Project WBS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case StudyITER-like Wall Project WBS Malcolm Kear

  2. Work Breakdown Structure Approach (WBS) • Work Packages and their content • Planning and Resourcing • SAP and WBS(e) numbers • JOC Expenditure Log • Conclusions Case StudyITER-like Wall Project WBS Contents of Presentation

  3. ITER-like Wall Project OrganisationWork Breakdown Structure - Top Level (1) Mirrors ED&M Temporary home Completed In Progress

  4. ITER-like Wall Project OrganisationWork Breakdown Structure ED&M - Level 2 In Progress Completed Not Started

  5. ITER-like Wall Project OrganisationWork Breakdown Structure ED&M - Be Sliced Tiles - Level 3 In Progress Completed Not Started

  6. ITER-like Wall Project OrganisationWork Package Description Summary Sheets Resources are rolled up from lowest level of the WBS to give overall requirements – both costs and manpower

  7. ITER-like Wall Project OrganisationWork Package Description Summary Sheets • Work Package Descriptions, together with WPD Summary Sheets are documented and issued • These form the basis of compiling resource and cost estimates - each WP is considered separately • These also form the basis of progress reporting • Budgeted Resources are clearly visible • WBS(e) numbers are included

  8. ITER-like Wall Project Organisation Summary • Clear statement of work to be done via WBS • Clear resourcing requirements via the WBS • Clear project costing via roll-up from bottom level of WBS • SAP WBS(e) numbers align with WBS for easy cost analysis • Cost collection at a lower level to that in SAP - allows more local control • QRN system also keys into WBS - allowing greater traceability • Allows future changes to be easily identified thereby easing change management