1 / 20

EEP Mekong 4 th Call for Proposal Information Seminar Vientiane Lao PDR 16 July 2012

EEP Mekong 4 th Call for Proposal Information Seminar Vientiane Lao PDR 16 July 2012. Bounnhang Phengsouvanh National Technical Expert. Presentation Lay out. The objectives Purposes Concept Note and Development Approach Logical Frame Work and Inter-linkage Development.

edith
Télécharger la présentation

EEP Mekong 4 th Call for Proposal Information Seminar Vientiane Lao PDR 16 July 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EEP Mekong4th Call for Proposal Information SeminarVientiane Lao PDR16 July 2012 Bounnhang Phengsouvanh National Technical Expert

  2. Presentation Lay out • The objectives Purposes • Concept Note and Development Approach • Logical Frame Work and Inter-linkage Development

  3. 1: The Objectives and Purposes The Overall Objectives • The Participants are able to understand EEP’s project concept note design, Full Project Proposal Formulation. Purposes: • To support and improve quality of new “Project Concept Note writing” and “Full Project Proposal formulation”.

  4. 2:Concept Note Idea and Development Approach • Project Concept note Understanding • “UNDERSTANDING” is crucial to everything in Project Concept note formulation. • We must be able to “understand” and “explain”. • The 1 minute explanation: 10 km. view. • The 5 minute explanation: 1 km. view. • The half hour explanation: 10 to 100 metres. • To do this, we must be able to “visualise”: • we need a 4 D model in our heads. • We should be able to jump in and out of this.

  5.  10 km view (concept)  1 km view( full) 10 to 100 metres view  (Implementation)

  6. PROJECT CONCEPT FORMULATION • The “project concept” is essentially the rationale and basic “business” idea of the project. • There is no “magic formula” for developing the basic concept. This draws on some of the skills covered earlier in this workshop but may also include systematic analysis as well as inspirational brainstorming of • problems to be solved to bring benefit, and • Opportunities to develop something with benefits: often based on new technology or other innovations. • This is a creative process which is generally flexible and iterative (repeated in cycles).

  7. PROJECT CONCEPT FORMULATION (Continue) Tools” may help to test and improve the basic idea and design: • Problem and situation analysis: problem trees. • Stakeholder analysis. • Visioning, scenario planning. • Cost-benefit analysis. • Logical framework analysis.

  8. PROJECT CONCEPT FORMULATION (continue) A “mechanism-based” approach: can help to understand how the proposed project should work and improve design. • The Benefit: What is the benefit and how is it generated / produced? How does it contribute to EEP objectives? • Distribution of the benefit: Who receives the benefit: individuals, groups, the community, the sector, men or women, rural or urban people, poor or rich, etc? • “Sustainability”: What benefits / outputs / activities should be sustained at the end of the project, and how will they be sustained? • “Replicability” (also known as “scaling-up” or “spread”): How can the benefits / outputs / activities be spread (what is the mechanism) and how easy would this be?. • “Implementability”: Is the project understandable? Do the proponents have the capacity? Will it work?

  9. 3. LOGICAL FRAMEWORK APPROACH (LFA) • One way to describe projects is as a series of connected objectives. • This “connection” follows the “cause and effect” logic. • This provides a “logic model” of what should happen.

  10. The 4 levels of the “Logframe”: • “Activities”: the things we do, or actions implemented. • “Outputs” (also called “Results”): the products and services of activities: i.e. the things produced. These are the “deliverables” of the project • “Purpose” (also called “immediate objective”): the combined effectsor outcomes of the outputs to be achieved by the end of the project. • “Overall objective” (also called “goal”): the overall long term effectsor outcomesto which the project contributes.

  11. Key points: • Understanding the change process is the key to success. • Construct the internal logic model diagram which clearly summarises the overall change process as “activities”  “outputs”  “purpose”  “overall objective”. • Develop objective and practical indicators which work (i.e. assess the change) from the sound understanding of the change processes in the internal logic model.

  12. INDICATORS • The internal logic model diagram gives us a “Results Chain”. • We need to achieve each box or “result”. • To know how well we are progressing in achieving each result, we need “indicators” (for each box). • Develop “indicators” is the second major task in development of the full logframe.

  13. Indicators continue… Definition of an indicator: • “a quantitative or qualitative variable that allows stakeholders to verify the changes produced by a development intervention relative to what was planned”. • A “key indicator” is an indicator for a logframe output, purpose or overall objective. Purpose of an indicator: • To show if and how much change has occurred: • may not necessarily explain the change.

  14. Completion of the “Logframe Table” and the “key indicator definition table” • A complete Logframe is usually presented in a table or matrix format with: • Project Description: the hierarchy of objectives. • Indicators: “objectively verifiable indicators”. • Source of verification: where the date for the indicators will come from. • Important Risks / Assumptions: external factors which could affect the success of the project: the “external logic”.

  15. Example of internal logic model:

  16. Use of the logframe: As ideas take shape, the log-frame should be constructed in stages as outlined earlier: • Develop the internal logic model using the diagram to visualise this. • Once the internal logic has been developed,, develop the main key indicators and draft targets, identify the most important assumptions / risks and compile the draft log frame table. Use this to help, prepare the “Project Concept / Proposal Form” for submission to EEP.

  17. Exercises –as Example

  18. Example: Continue