1 / 14

TOF status M. Bonesini Sezione INFN Milano Bicocca

TOF status M. Bonesini Sezione INFN Milano Bicocca. TOF0 INSTALLATION. Installation in final position inside DSA. Preliminary installation before Q7 (July 08).

emmly
Télécharger la présentation

TOF status M. Bonesini Sezione INFN Milano Bicocca

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TOF status M. Bonesini Sezione INFN Milano Bicocca M. Bonesini - VC 18-12-08

  2. TOF0INSTALLATION Installation in final position inside DSA Preliminary installation before Q7 (July 08) M. Bonesini - VC 18-12-08

  3. During data taking: one broken PMT (channel # 28, it was one of 3 discharging ones as discovered from preliminary tests at RAL after transport in June). It will be changed next weekend M. Bonesini - VC 18-12-08

  4. TOF1 installation • installation 9-12/12 • some data taken in two short evening runs • more data needed • installation went smoothly also thanks to the help of many people (DL team, Andy, Willy, …) M. Bonesini - VC 18-12-08

  5. Waiting for “GODOT” (alias the m beam) • clearly with an “electron”, “pion” beam only a limited detector debug may be done: • rate effects on PMTs will not show up • … • but still useful if AT LEAST we may study as complete as possible detectors: it means all detector channels read-out by DAQ M. Bonesini - VC 18-12-08

  6. Some DAQ numerology • aim readout TOF0,TOF1, KL + 2 taggers behind KL • it means 40 ch for TOF0, 28 for TOF1, 42 for KL, 4 for taggers • we have enough TDC channels (3 boards: 2 Rm3, 1 MIB) • we have 14 FADC boards delivered to MICE from RM3 (of which at least 12 installed at RAL) • proposal: • 5 boards TOF0 • 5 boards KL (we do not equip the 2 upper PMTs) • 4 boards TOF1 + taggers • All this will put clearly some stress on the DAQ team M. Bonesini - VC 18-12-08

  7. TOF requirements for next run Instead of many runs, 2 high statistics run : one with pions and one with electrons M. Bonesini - VC 18-12-08

  8. Analysis effort Mark and Yordan are looking to last weekend runs, but some problems are hanging around (decoding, …). But some good news: we may read the data and have plots. Some very preliminary plots from Mark in the following. M. Bonesini - VC 18-12-08

  9. Dt1 Reference slab B1 B0 Dt0 Cable length calibration of TOF0/1(verbatim from Mark’s slides) • Goal: 0th order calibration of the PMTs within a plane relative to each other • Method: determine a DTDC for each PMT • Event selection: • Single space point • Passes through reference slab • Conditions for all the slabs in a plane: • Make <TDC1 – TDC0> the same • Constrains DTDC1 – DTDC0 • Make <tslab being calibrated – treference slab> the same • Constrains DTDC1 + DTDC0 • Next: • Improve statistics, especially in the outer slabs • Consider an FADC cut • Use e+ to calibrate the 4 planes of TOF0 and TOF1 relative to each other • Add an initial time-walk correction (large signals pass the discriminator sooner) • Incorporated in G4MICE application TofCalibration M. Rayner VC 18/12/08

  10. slab Constraining DTDC1–DTDC0… Mean after N Mean and error on the mean TDC1–TDC0 Number of events, N Constraining DTDC1+DTDC0… Mean after N Mean and error on the mean <TDC>–<TDC>ref Number of events, N slab Before calibration:Deducing the DTDC Data: 844.000, 844.001, 845.000, 845.001 slab M. Rayner VC 18/12/08

  11. slab Constraining DTDC1–DTDC0… Mean after N Mean and error on the mean TDC1–TDC0 Number of events, N Constraining DTDC1+DTDC0… Mean after N Mean and error on the mean <TDC>–<TDC>ref Number of events, N slab After calibration:Checking the calibration works Data: 845.002, 847.000, 847.001 M. Rayner VC 18/12/08

  12. TOF2 status TOF2 counters assembled, but not still wrapped out TOF2 PMTs under repair at Hamamatsu: delivery expected by mid January 09 ARMCO steel for local PMTs shielding procured at CERN and now in house final design of KL+TOF2 trolley under way final design of TOF2 mechanics + local shielding done M. Bonesini - VC 18-12-08

  13. CAD drawing of TOF2 mechanics + shielding M. Bonesini - VC 18-12-08

  14. Conclusions • TOF0 installed since June 2008 • TOF1 installed since December 2008 • performances seem compatible with what obtained at BTF (no time walk correction possible) • TOF2 will follow soon M. Bonesini - VC 18-12-08

More Related