An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Warner Robins Air Logistics Center Performance-Based Logistics Affordability:Can We Afford Categorical Conversion to Performance-Based Acquisition? Developing, Fielding, and Sustaining America’s Aerospace Force Andrew H. Adsit Robins AFB, GA I n t e g r i t y - S e r v i c e - E x c e l l e n c e

  2. Overview • History of Performance-Based Acquisition • Recent Proposal • Challenges • Our Approach • Summary

  3. History • Traditional build-to-print acquisition strategy • Leads to continuation of “bad design” • No room for product improvement/ innovation • Obsolescence a factor History Proposal Challenges Approach Summary

  4. Proposal • Eliminate strict design criteria • Buy performance, not product • Allow manufacturer to innovate • Heavy reliance on commercial specifications and products History Proposal Challenges Approach Summary

  5. Challenges • Often performance parameters don’t exist • Funds to develop specifications may not be available or timely • Low quantities may drive higher unit cost above that of build-to-print • Configuration control may be more difficult • Acceptance testing as configuration changes History Proposal Challenges Approach Summary

  6. Approach • Separate candidates based on a broad list of factors • Only focus on items with multiple factors of consideration • Otherwise, continue build-to-print until another opportunity to innovate arises History Proposal Challenges Approach Summary

  7. Approach (Con’t) Factors • Decreasing or low reliability • Increasing sustainment cost • Diminishing sources • Obsolete technology • High cost items (system cost drivers) • Items that utilize rapidly changing technologies • Life cycle cost pay-back period exceeds expected remaining system life History Proposal Challenges Approach Summary

  8. Approach (Con’t) • Develop triggers for fine tuning of candidates based on data • Triggers developed using experts across the acquisition community • Weight triggers to determine “tendency” to performance-based acquisition • Middle of road candidates should use a risk reducing “split-buy” approach History Proposal Challenges Approach Summary

  9. Approach (Con’t) Support Strategy Triggers • Do we have build-to-print data?   • Is the build-to-print data sufficient for a vendor other than the current vendor to reproduce, test, and deliver a quality product? • Is the item a reliability or maintainability driver? • What is the expected system life (e.g. has it been scheduled for decommission and if so, how many years are left)? • Quantity required vs. installs + inventory? History Proposal Challenges Approach Summary

  10. Approach (Con’t) Supplier Incentives Triggers • What is the lead time required on the current item?   • What is the impact of the time delay necessary to develop performance-based specifications? • How many vendors currently exist for the item? • How viable is (are) the vendor(s) currently producing the part? • Are you experiencing a vanishing vendor base for the item? History Proposal Challenges Approach Summary

  11. Approach (Con’t) Acquisition Strategy Triggers • Are resources available to convert a new item to a performance-based acquisition? • What is the current unit-cost (percent of system cost)?  • What is risk of new technology vs. existing item technology? • What available technology could be used in a redesign of this item compared to the current technology?   • What is the expense trend (annual support cost) for the item? History Proposal Challenges Approach Summary

  12. Approach (Con’t) Configuration Management Triggers • What is the current repair methodology? • What is the desired repair methodology? • What level of support equipment and T.0. data exists for the current item and how much could be used for the proposed item? • How much training would be required due to changing configurations? History Proposal Challenges Approach Summary

  13. Summary • Process resulted in consistent selection of candidates both for build-to-print strategies and performance-based acquisition • Potential cost savings by not developing performance-based specification where not indicated • Feed-back mechanism critical for success of approach (adding/deleting relevant factors and triggers) History Proposal Challenges Approach Summary