1 / 26

Acquisition at the Air Armament Center

Acquisition at the Air Armament Center. July. Precision Strike Conference. 2005. Air-to-Ground Munitions Systems Group Mr. Thomas Robillard, SES Director. Why Are We Here? Communicate What’s Going On With Precision Strike From An Air-to- Ground Munitions Systems Wing Perspective

Télécharger la présentation

Acquisition at the Air Armament Center

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Acquisition at the Air Armament Center July Precision Strike Conference 2005 Air-to-Ground Munitions Systems Group Mr. Thomas Robillard, SES Director

  2. Why Are We Here? Communicate What’s Going On With Precision Strike From An Air-to- Ground Munitions Systems Wing Perspective Learn From Each Other Desired Outcome Benefit From Cross-Talk Get More Effective At Joint Service Technology Transitions

  3. Air Armament Center (AAC) • Provides Weapons And Combat Support Systems To AF, Navy, Army, And More Than 30 Countries • Air Armament Modernization Budget Is Consistently 2-3% Of Total AF Budget ~$300m Per Year (06 POM) • Laboratory, Acquisition Offices, Developmental And Operational Test Organizations Are Co-Located At The AAC AFMC / AAC MISSION Deliver War-winning Technology, Acquisition Support, Sustainment, And Expeditionary Capabilities To The Warfighter

  4. AFMC /AAC Strategic Goals • Develop And Transition Technology To Maintain Air, Space, And Information Dominance • Develop, Field, And Sustain War-winning Expeditionary Capabilities On Time, On Cost • Provide Opportunities For Career Development And Progression • Operate Quality Installations And Ranges • Sustain A Healthy, Fit, Safe, And Ready Workface • Organize And Resource The Command To Improve Accountability And Increase Effectiveness • Achieve Agile Acquisition Through Speed And Credibility

  5. Air-to-Ground Munitions Systems Wing (AGMSW) Joint Air Surface Standoff Missile (JASSM) Joint Direct Attack Munition (JDAM) Small Diameter Bomb (SDB) Sensor Fuzed Weapon (SFW)

  6. Air-to-Air Missile System Wing(AAMSW) Advanced Medium-Range, Air-to-Air Missile (AMRAAM) Harm Targeting System (HTS) QF-4 Full Scale Target Sidewinder AIM –9X Air Force Sub-Scale Aerial Target (AFSAT) Miniature Air Launched Decoy (MALD)

  7. Technology TransitionThe DoD 5000 Process Program Initiation or FOC IOC A B C S&T Activity System Development & Demo Technology Development Requirement Generation Concept Refinement Production & Deployment Operations & Support 6.1, 6.2, 6.3 Technology Readiness Level > 6 Top-Down Direction • SecDef • SecAF • CSAF Technology Transition Combatant Commander Needs • ATDs • ACTDs • Exercises • Experiments • Battlelab Initiatives • SPO Initiatives • Industry REQUIREMENTS • Integrated Priority List (IPL) • Urgent Need Requests Capability Based Planning • CONOPS • CRRA

  8. Production & Deployment Operations & Support SD&D Who Does Technology Transition & Program Starts? Program Initiation FOC IOC A B C Requirement Generation Concept Refinement Technology Development Sustainment Acquisition Offices Pre-Systems Acquisition • AF Research Laboratory/Munitions Directorate • Technology Maturation • Integrated Concepts/Demos • Expertise • AAC/XR • Initial Program Cadres • Quick Reaction Programs • Guides S&T Investment Air-Ground Sys WG Air-Air Msl Sys WG Air Combat Sup Sys GP Air Logistic Centers Multi-service and International Stakeholders: Industry, Warfighters, Laboratories, Service, OSD Staffs, & Congress

  9. The DoD 5000 Process For New Programs “Behind the Textbook” • Identify Technology That Provides Warfighter Additional Capability • Better And/Or Cheaper Than Current Inventory • Fills Capability Gap(s) • Assess Risk And Understand Technology Maturity • Conduct Risk Reduction, Concept & Technology Development Activities • Demonstrate Maturity • Develop Focused Story That Articulates Capability In Warfighter Terms • Lab, Industry, Acquisition Community Relay Story To Stakeholders • If Story Is Good, Funding And Direction Will Come • Acquisition Program Begins This Process works best when “PULLED” by capability needs and takes 5 years or more

  10. JDAM Story • AFRL Inertial Guidance Technology Demonstration 1989-1990 • Gulf War – 1991 – Need For Accurate All-Weather Weapons $20M S&T Investment 1976-1993 JDAM TIMELINE Gulf War Generated Rqmt JDAM Low Rate Initial Prod Award JDAM Pre-EMD Award DEMO AFRL DEMO LRIP EMD Production MS I MS 0 MS III MS II 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 5 Years from Technology Demonstrations, 3 Years From Identified Need to Milestone I

  11. JDAM Start-up • Competing Concepts • Technology Maturity Debates • GPS Technology Was New For Use In Weapons • Inertial Navigation Systems Were Expensive • Can You Make It Affordable For Large Quantity, Expendable Weapons? • Use/Reliability Of Autonomous Weapons • Existing Concepts Of Operations Were Based On Data Linked Weapons Or Carpet Bombing • Funding • Had To Marry Up With POM Cycle • Had To Sell New Acquisition Strategy – Promised Affordability • Cost Vice Performance Trades • Performance Specifications • Long Term Pricing Agreements

  12. JDAM For OEF and OIF • Prior to 11 Sept 01 Attacks • 700 Units Per Month • Aircraft • Today • 2800 Units Per Month • More Aircraft Integrations - Smaller Bombs * Quick Reaction Capability Precision + Low Collateral Damage + Platform Flexibility in Months Vice Years NDIA Symposium_Feb 05

  13. JDAM Today • Accuracy: Less Than 6 Meters • Cost: Less than 50% Original Estimated Unit Cost • Number Produced To Date: 104,320 • Number Used In Conflict: 15,180 ( AF: 11,570, Navy: 3,610 )

  14. Small Diameter Bomb (SDB)

  15. SDB Story • Aircraft Internal Bays Limit Number Of Weapons Carried • Increased Need For Near-zero Collateral Damage • Improved INS/GPS Accuracy Over Time Allowed For Smaller Weapons and Multiple Carriage SDB TIMELINE $64M S&T Investment 1994-2002 MMC MNS Signed • AFRL Tech Programs • Range Extension Demo • Powered Low Cost Autonomous Attack System (LOCAAS) • Carriage Demos • TMD MM Dispenser Contract Award MMC Seeker RR MMC AOA Production CAD SDD AFRL DEMO MS A MS B MS C MS 0 2006 2007 2008 2009 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 6 Years From Technology Demonstration, 3.5 Years From Identified Need to Milestone A

  16. SDB Start-up • Challenges • Belief That Nothing Smaller Than 2,000 lbs Could Sufficiently Damage Targets • Bomb Damage Assessment – How Will We Know What Damage Was Incurred With Small Amount Of Explosive? • Worry That We Couldn’t Mission Plan That Many Weapons • Funding – 4 Years “Below-the-line” In POM • What Happened: • Lab, Industry, Acquisition And Warfighter Communities Collaboratively Built And Told The SDB Story • Lab Demo, Live Fire, B-2 With 80 500 lb JDAMS, … • Top-down Directed Funding For Program In FY01 & Out • 04 POM Fully Funded Baseline Program

  17. Lessons Learned • Capabilities Needed In Actual Combat Drive Technology Transitions • Create Battlefield Effects With Near-zero Collateral Damage • Integrate Seamlessly Into Fully Joint Warfighting • Multitude Of Diverse Stakeholders Must Converge To Successfully Transition Technology • Industry, Warfighters, Service & OSD Staffs, Congress • Aircraft Integration Is The Slowest, Most Costly Driver • 5-8 Platforms (F-18 E/F, FA-22, JSF, B-2, B-52, F-15, F-16, B-1, UAVs)

  18. Joint Programs "Now More Than Ever.....!!"

  19. AAC/XR Roadmap Vision FYDP 2012 TODAY 2020 Hyper CM RNEP GBU-31 (BLU-109) GBU-28 (BLU-113) GBU-28C/B (BLU-122) JASSM/JASSM-ER MOP / CAV HDBT/UGF DE & HPM Weapons LGBs, JDAMs, PSOW, GP, CALCMs & Mavericks, JASSM/JASSM-ER SDB & SDB II LCMCM, CAV, Area Dominator Fixed Land GBU-12 B/B, Hellfire DE & HPM Microbots SDB, SDB II & JCM Low Collateral Damage WH Area Dominator & VSM Fixed Urban CBU-103/104/105s, LGBs, Longbow, & Mavericks DE & HPM Global Energy Projection SDB II, JCM, & CBU-105 ER w/DL LCMCM, WASAAMM, Area Dominator Moving Land SDB II, JCM, JASSM & CBU-105 Maritime DE Weapons ASSM (HSW) LCMCM, WASAAMM, Area Dominator Moving Sea LGB & Maverick

  20. HARM BLK V Maverick HELLFIRE N78 1Q 2004 (POM 06) FYDP 2012 TODAY 2020 TACTOM (HSW) LR Standoff SLAM ER TLAM Blk III / TACTOM SLAM ER TLAM Blk III / TACTOM SLAM ER JSOW AARGM SDB II JSOW “A” and “C” JSOW “A” JSOW AARGM SDB II MR Standoff HARM BLK V and AARGM Maverick JDAM LGB JCM, APKWS GP Bombs JDAM JDAM JCM, APKWS GP Bombs Direct Attack JDAM 82, 83, 84 GBU 24, LGB LGB, GBU-24 2.75”/5.00” ROCKET, GP Bombs APKWS, GP Bombs JCM SDB II DA Moving/ MobileTarget JCM SDB II GP Bombs, LGB JCM TOW / HELLFIRE

  21. A Lesson From Air-to-Air • Joint Air Dominance Organization (JADO) • Air-to-Air Focus • USAF/ USN Focus • In Start-up Mode • Need to Incorporate Precision Strike • Air-to-Air/ Air-to-Ground Framework • Capability Focus Independent of Service or Launch Platform (SLAMRAAM) Joint is not a Four Letter Word

  22. Preparing For The Future • Small Diameter Bomb • Field More Precise, 250 lb Bomb In FY06 • Universal Armament Interface • Develop Plug-and-Play Aircraft/Weapon Interfaces • Net-Ready Weapons • Establish Interface Standard For Weapon Data Links • ACTD FOR SDB, JASSM, JSOW-C, MALD-J • Directed Energy Application – Are We Ready? • 8-10 Feb 05 Workshop Focused On Transition • Armament Symposium – 4-5 Oct 05 • Focus Areas: CBRNE, CAS, Long Range Strike

  23. QUESTIONS?

  24. Historical PerspectiveInfusion of Weapon New Starts FY94 FY95 FY96 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 JDAM WCMD = ACAT I Programs JASSM SDB I MALD JASSM-ER Budget Priorities Rule Technology Transitions SDB II

  25. Phased Threat Distribution

More Related