1 / 37

Design and Status of the SBS Front tracker

Design and Status of the SBS Front tracker. Evaristo Cisbani / INFN-Rome Sanità Group (largely based on the SBS Review Meeting). SBS Meeting JLab : 19/March/2010. Outline. Requirements for tracking Conceptual design GEM technology Modular approach GEM design details Mechanics

geneva
Télécharger la présentation

Design and Status of the SBS Front tracker

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design and Statusof the SBS Front tracker Evaristo Cisbani / INFN-Rome Sanità Group (largely based on the SBS Review Meeting) SBS Meeting JLab : 19/March/2010 E. Cisbani / SBS Trackers

  2. Outline • Requirements for tracking • Conceptual design • GEM technology • Modular approach • GEM design details • Mechanics • Service components • Electronics • MC • Beam tests E. Cisbani / SBS Trackers

  3. Different (e,e’h) experimental configurations E. Cisbani / SBS Trackers Most demanding High Rates Large Area Down to ~ 70 mm spatial resolution Maximum reusability: same trackers in different setups

  4. Choice of the technology E. Cisbani / SBS Trackers … and modular: reuse in different geometrical configuration GEM mMs Flexibility in readout geometry and lower spark rate

  5. GEM foil: 50 mm Kapton + few mm copper on both sides with 70 mm holes, 140 mm pitch Ionization Multiplication Multiplication Multiplication Readout Strong electrostatic field in the GEM holes GEM working principle E. Cisbani / SBS Trackers Recent technology: F. Sauli, Nucl. Instrum. Methods A386(1997)531 Readout independent from ionization and multiplication stages

  6. Rate capability Ar/CO2/CF4 (60/20/20) E. Cisbani / SBS Trackers Triple GEM Poli Lener, PhD Thesis - Rome 2005  Hit rate not an issue

  7. Aging in COMPASS and LHCb Altunbas et al. NIMA 515 (2003) 249 X-ray 8.9 keV Ar/CO2 (70/30) Use of not-outgassing epoxy Change in HV 25 kHz/mm2 6.3 kHz/mm2 E. Cisbani / SBS Trackers g-ray 1.25 MeV Ar/CO2/CF4 (45/15/40) Expected max. collected charge in GEp: 0.5 mC/mm2/y No significant aging expected Alfonsi et al. Nucl. Phys. B 150 (2006) 159

  8. Spatial Resolution in COMPASS: 70 mm COMPASS readout plane (33x33 cm2) and results (analog readout) E. Cisbani / SBS Trackers C. Altunbas et al. NIMA 490 (2002) 177 70 mm resolution achieved by strips centroid  Analog readout required

  9. Approach: 40x50 cm2 Module Use the same “basic” module for all trackers types • Size: 40x50 cm2 active area + 8 mm frame width • FEM study: • 3 x GEM foils (double mask technology) • 2D strip readout (a la COMPASS) - 0.4 mm pitch • x/y and u/v coordinates E. Cisbani / SBS Trackers • Two exceptions in readout foil: • Front Tracker last 2 chambers: • Double segmented readout to reduce occupancy (Pentchev talk) • Coordinate Detector: • 1D strip readout • 1 mm pitch

  10. Material Budget • Based on the COMPASS GEM • single honeycomb • smaller copper thickness E. Cisbani / SBS Trackers Minimise material to reduce background and multiple scattering

  11. Single Module Mechanical Structure • 3D di Francesco cover drift 3 x transfer+induction honeycomb gas in/out-let detail Service frame E. Cisbani / SBS Trackers

  12. Readout Plane and ZIF extension • Readout along all sides • not strictly required in x/y unless additional segmentation of the readout plane • weight balance • unavoidable in diagonal u/v • Extension feeds into ZIF connectors: • no soldering on the readout foil • permit safer bending • Small frame width (8 mm); minimize dead area • Require precise cutting around the ZIF terminals x/y E. Cisbani / SBS Trackers Rui De Oliveira final design based on our drawing In production

  13. GEM active area SMD resistor pads Detail of the HV distribution • 7 independent HV channels for each chamber (TBC) • 3 HV identical doublets + 1 for drift (same on all GEM foils); each doublet serves one GEM foil, unused will be cut. • SMD protection resistors, under the thin frame 20 5×20 cm2 HV sectors E. Cisbani / SBS Trackers Use the HV modules developed by Corradi/Murtas at LNF

  14. Front Tracker Geometry X(4+4) Back Trackers Geometry SBS Tracker Chambers configuration GEp(5) SBS x6 • Modules are composed to form larger chambers with different sizes • Electronics along the borders and behind the frame (at 90°) – cyan and blue in drawing • Aluminum support frame around the chamber (cyan in drawing); dedicated to each chamber configuration E. Cisbani / SBS Trackers

  15. GEM Trackers Accounting E. Cisbani / SBS Trackers Total chs. 101700 Last 2 FT modules with strips split in the middle (double segmentation on each site) ST and TT readout groups 4 strips in GEp(5) with binary readout

  16. Electronics layout and outer support Green = FE card Cyan = Module frames Cards and modules are supported by an outer aluminum frame which runs all around the chamber. Optimization is in progress. E. Cisbani / SBS Trackers Red= Outer Support Frame

  17. 2D Readout Electronics Components GEMFECADC+VME Controller DAQ 8 mm Up to 10m 49.5 mm 80 mm E. Cisbani / SBS Trackers • Main features: • Use analog readout APV25 chips (wire-bonded on standard PCB, no ceramics): proven to work in COMPASS • ZIF connector on the GEM side (no soldering on readout foil) • Minimum electronics components (front-end + VME custom module) • Copper connection between front-end and VME Thanks to Michael Böhmer and Igor Konorov from TUM for very productive discussions on the design of the APV25 based FrontEnd card

  18. Front-end prototypes tests • Front-end card under control • First tests on analog cable length positive 7 m cable E. Cisbani / SBS Trackers Work is in progress(see date on screenshot) 50 cm cable 50 cm cable Paolo Musico/GE

  19. Beam Tests • Dec/09: preliminary beam test at DESY-II test area (low intensity electron beam from 1 to 6 GeV) of 2 10x10 cm2 2D prototypes + Gassiplex electronics • Characterize the small chamber • Prepare for the full size module test • March/10: GEM under installation in PREX experiment (with Gassiplex electronics, switch to APV25 in May ?) • Early Summer/10: Planned test of 40x50 cm2 module at DESY • Demonstrate the large module works as expected • Improve design • Test APV25 electronics E. Cisbani / SBS Trackers

  20. DESY beam test in Dec/09: setup 2x 10x10 cm2 GEM prototypes Silicon Tracker + scintillator fingers Beam E. Cisbani / SBS Trackers HV Power Supply

  21. DESY beam test in Dec/09 - pedestals Baseline subtracted pedestals Preliminary! E. Cisbani / SBS Trackers Gassiplex Readout (not optimized for negative charge), 700 ns shaping time

  22. DESY beam test in Dec/09 - event example Ar/CO2 70%/30% 3 GeV Electron Beam DGEM = 410 V Vdrift = 2.5 kV/cm VGEM = 2.5 kV/cm Vind = 3.5 kV/cm Preliminary! Single Event E. Cisbani / SBS Trackers Cumulated (Beam profile)

  23. DESY beam test in Dec/09 – x/y correlation DGEM = 410 V Vdrift = 2.5 kV/cm VGEM = 2.5 kV/cm Vind = 3.5 kV/cm Maximum charge in strip E. Cisbani / SBS Trackers Total Charge in cluster

  24. PREX Installation E. Cisbani / SBS Trackers

  25. MonteCarlo/Geant4 • Current model includes: • SiD • Magnet (simple dipole model) • Drift Chamber (for testing) • GEMs (with some sort of electronics) • Working on: • bug fixing, standardize output • general improvement • digitization E. Cisbani / SBS Trackers

  26. SBS Front Tracker Project E. Cisbani / SBS Trackers INFN groups involved in the front tracker development + electronics BA/LE: Gas system + HV CA: Mechanics + Test + MC + Slow Control GE: Electronics ISS/RM: Prototyping, Test, Digitization + Reconstruction, SiD, Coordination Collaboration and funding  Liyanage Talk

  27. Conclusions • GEM technology adopted • high rate and spatial resolution proven in real experiments • Modular approach to get large area detectors, and at the same time to guarantee the already achieved performance • Work in progress: • Production of the first 40x50 cm2 modules • Finalize design of the mechanics • Test Electronics prototypes • Improve MonteCarlo and Digitization and analyze data • Lab/Beam tests of GEM prototype • Setup Infrastructure and tools (clean room, stretcher, quality checls protocol …) E. Cisbani / SBS Trackers

  28. Backup slides E. Cisbani / SBS Trackers

  29. Front End Card Digital IN/OUT + LV Front End card based on COMPASS original design The APV25 chip (originally developed for SiD in CMS) Bus like digital lines (CLOCK, trigger and I2C) & Low Voltages Single differential line for the ANALOG out ZIF connectors on the GEM side (no soldering on readout foil); minimize thickness 800 front-end cards needed ANALOG OUT E. Cisbani / SBS Trackers to the next card Analog frame coming out from the card First front-end prototypes under test

  30. From the VXS backplane: • Trigger L1/L2 • Synch • Clock • Busy (OUT) • (duplicated on front panel) VME64x Custom Controller • VME controller hosts the digitization of the analog signals coming from the front-end card. • Handle all control signals required by the front end cards (trigger/clock/I2C) • Compliant to the JLab/12 VME64x VITA 41 (VXS) standard • Designed with the possibility to detach the ADC subcomponent to extend FEC-VME64x distance (expected to be ~7 m) • 50 modules required E. Cisbani / SBS Trackers First 2 prototypes expected next week

  31. Choice of the frame width - FEM Foil stretched with 30 kg weight Electrostatic field of 10x5 kV/cm (1 Pa) Permaglass frame <40 mm distorsion assumed safe E. Cisbani / SBS Trackers

  32. GEM: Prototype 0 and 1 • First 10x10 prototypes under cosmic test • Using 70/30 Ar/CO2 gas mixture • 7 Independent HV levels up to ~ 4000 V E. Cisbani / SBS Trackers Assembling the GEM chambers parts require a careful quality control at several check points and specific tools for gluing, heating, testing, cleaning Final 40x50 cm2 module finalized; GEM foils and readout ordered

  33. Slow Control HV management is not trivial! 7 HV levels must rump up/down coherently Low pass filters E. Cisbani / SBS Trackers

  34. Clean Room Tools and Facilities Visual inspection back-light board E. Cisbani / SBS Trackers HV single foil testing station Assembling the GEM chambers parts require a careful quality control at several check points and specific tools for gluing, heating, testing, cleaning

  35. Assembling tools: GEM foil stretcher Load cells Uniform and controlled stretching of the foil (30 kg on the load cells) Load cells E. Cisbani / SBS Trackers In production Francesco Noto; inspired by Bencivenni @ al. (LNF)

  36. ± 45° u/v readout plane and fan-out configuration Conceptual design u v E. Cisbani / SBS Trackers 1.25% dead area in v plane (in simpler configuration) Detailed design in progress

  37. Digitization • MC gives track and energy lost (E) in drift region • Extract number of primary electron-ion pairs from poissonian with mean=ni=E/W • Each of the above pair originate from points uniformly distributed along the primary track in drift region • Electrons drift toward the readout at speed vd~5-6 cm/us • Electrons spread (diffuse) on the perpendicular direction with distribution defined by sigma_s=sqrt(2Dt) • The total charge collected from each original pair is gaussanian distributed around the mean gain G=8000 (20x3) with sigma = G*f and gaussian spatially distributed with sigma = sqrt(2Dvd/L), L=drift-readout distance, around the projection of the origin into the readout plane E. Cisbani / SBS Trackers

More Related