A Pre-Measuring-System for tamping machines

A Pre-Measuring-System for tamping machines. Biography. Patrick Walke , 35 years old, German Surveying Engineer graduate, extensive experience as Field Surveyor and Project Manager in different fields of surveying (e.g. track construction, civil engineering, bridge building),

gstinnett
Télécharger la présentation

A Pre-Measuring-System for tamping machines

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Pre-Measuring-System for tamping machines Biography Patrick Walke, 35 years old, German Surveying Engineer graduate, extensive experience as Field Surveyor and Project Manager in different fields of surveying (e.g. track construction, civil engineering, bridge building), Specialized in track construction; Since 2003 Technical Director of IBH Schwelm nearby Cologne.

  2. A Pre-Measuring-Systemfor Tamping Machines The assurance of an Optimal Track Set [ST 228] Patrick Walke – IBH Ingenieurbüro Herzbruch, Schwelm, Germany

  3. A Pre-Measuring-System for tamping machines Overview • Description of the Status Quo • The Pre-Measuring-System for Tamping Machines C. Comparison of the existing Systems D. What the future brings – New Opportunities

  4. A Pre-Measuring-System for tamping machines A. Description of the Status Quo Introduction

  5. A Pre-Measuring-System for tamping machines A. Description of the Status Quo Basic principle of Pre-Measuring Istachse Sollachse Catenary pole Catenary pole Catenary pole Catenary pole Catenary pole

  6. A Pre-Measuring-System for tamping machines A. Description of the Status Quo Basic principle of Pre-Measuring Basic principle of Pre-Measuring Istachse Sollachse y y‘ Long-chord  - - -  5 meter Translation: y‘ – y Catenarypole A Catenarypole B

  7. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The Tamping Machine

  8. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The Tamping Machine / Tamping unit

  9. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The Tamping Machine / Lifting, and lining unit

  10. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The Tamping Machine

  11. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The Switch Tamping Machine

  12. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The Tamping Machine / Documentation Documentation of a 6-channel-recorder

  13. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The EM-SAT

  14. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The EM-SAT / Front Measuring Unit

  15. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The EM-SAT / Backside Measuring Unit

  16. A Pre-Measuring-System for tamping machines A. Description of the Status Quo The EM-SAT

  17. A Pre-Measuring-System for tamping machines A. Description of the Status Quo Three Possibilities to Pre-Measure the track: • Manual / Traditional Way DRESI GLUNI

  18. A Pre-Measuring-System for tamping machines A. Description of the Status Quo Three Possibilities to Pre-Measure the track: • Manual / Traditional Way Disadvantages: - Marking out the 5-m-grid points manually - Marking out the geometry main points manually - Seperate work steps for horizontal and vertikal offset • Manual writing of the translation values in the track • Manual labor on the Tamping Machine necessary

  19. A Pre-Measuring-System for tamping machines A. Description of the Status Quo Three Possibilities to Pre-Measure the track: • Using the EM-SAT

  20. A Pre-Measuring-System for tamping machines A. Description of the Status Quo Basic principle of Pre-Measuring by the EM-SAT Istachse EM-SAT recording car Sollachse Satellite  - - -  5 meter  - - -  5 meter Long-chord Recorded data: - Relative offsets- Superelevation- Gage of the track Catenarypole A Catenarypole B

  21. A Pre-Measuring-System for tamping machines A. Description of the Status Quo Three Possibilities to Pre-Measure the track: • Pre-Measuring by tamping machine - Balanced method- Precise method

  22. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE

  23. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE • Rail-bound system with a track gage of 1.435m (others possible)

  24. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE Superelevated span => Basis for the plain Non-superelevated span=> Basis for the height

  25. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE b. Isogonic prism to locate each position of the system

  26. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE c. Battery-operated power station (S6-batteries usable)

  27. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE d. Manually operated

  28. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE e. Inclination sensor (bluetooth)

  29. A Pre-Measuring-System for tamping machines B. Pre-Measuring-SystemGEDO CE f. Track gage measuring system

  30. A Pre-Measuring-System for tamping machines B. Pre-Measuring-SystemGEDO CE g. Weight is about 17 kg

  31. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE TSC 2 as the control computer combines the Trimble S6 with the Pre-Measuring-System

  32. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE The Work flow / The Procedure of the measurement 1. In the Office: Preparing the track data and copying to the TSC2 Prepare the track data / convert known formats such as ‚Verm.ESN‘ (for DB AG) directly to the file format needed • station axis (chainage) • track axis • gradient • superelevation • Prepare the project data • coordinates of the junction points

  33. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE Basic principle of the Pre-Measuring System GEDO CE Total station Istachse Catenarypole A Catenarypole B

  34. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE Basic principle of the Pre-Measuring System GEDO CE Total station Istachse PMS Project attributes: - Axis data- Direction of the movement- Position of the prism- Calculation method Catenarypole A Catenarypole B

  35. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE Basic principle of the Pre-Measuring System GEDO CE Total station PMS PMS PMS Istachse PMS PMS PMS Catenarypole A Catenarypole B

  36. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE The Work flow / The Procedure of measurement 2. On the track: Which data is recorded at each position? • Horizontal coordinates of the measured points (Y,X) • Height of the superelevated and non-superelevated track span • Gage of the track • Track axis data (chainage, offset, gradient height) • Offset of the actual track set (horizontal and vertical deviation)

  37. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE Constraints to be measured Total station PMS PMS PMS Istachse Bridge sleepers Fixed mounting points PMS Railroad crossings PMS PMS Catenarymarking points switches Catenarypole A Catenarypole B

  38. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE Overlapping sections / Simple averaging Position B Position A

  39. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE Overlapping sections / Torsion of a station Position B Overlapping section to Position C Torsioned axis Recalculated axis Overlapping section to Position A

  40. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE Connection to the as-build track Position B As-build-track-axis Ramp min. 1:1000 Nominal track axis

  41. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE The Work flow 3. On the track: Data interpretation Convert to the ALC-Format / 5-m-grid

  42. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE The Work flow 3. On the track: Data interpretation Convert to the ALC-Format

  43. A Pre-Measuring-System for tamping machines B. Pre-Measuring-System GEDO CE Increasing of the performance possible ? YES ! By using a second total station Trimble S6! 2500 m per day are possible!

  44. A Pre-Measuring-System for tamping machines C. Comparison of the existing systems Factors Manual Way EM-SAT P.M.S. Track blocking No Yes No Clearance time 5 sec. --- 5-10 sec. >>> Flexibility Yes No Yes

  45. A Pre-Measuring-System for tamping machines C. Comparison of the existing systems Factors Manual Way EM-SAT P.M.S. Accuracy <5mm/70m <2mm/200m <2mm/line section Data flow analog digital digital Manpower 3-4 4 2 (+1 with 2 S6) Velocity 200 m/h 0,5 – 2,0 km/h 250 m/h Costs ~3,00 €/m ~10,00€/m bei 1000m ~1,50 €/m ~ 1,45€/m bei 7000m

  46. A Pre-Measuring-System for tamping machines D. What the future brings – New Opportunities Further application areas: • Marking out of a track axis (indirect) • Track monitoring • Combination with Laser Scanner (structure gage) • Setting out a track without any digital axis but only a track marking plan (digitizing of the plan)

  47. A Pre-Measuring-System for tamping machines Pre-Measuring-System GEDO CE

  48. A Pre-Measuring-System for tamping machines “Die Welt zu Gast bei Freunden!” “El mundo entre amigos!”