1 / 9

Fleet Management issues

Fleet Management issues. The Vessel manager point of view. Juanjo Dañobeitia; UTM-CSIC, Spain. http://www.utm.csic.es. Operational Issues. Logistic Issues. Technical Issues. Training & mobility. Investment strategies. Logistic Issues. Coordination of fleet scheduling

Télécharger la présentation

Fleet Management issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fleet Management issues The Vessel manager point of view Juanjo Dañobeitia; UTM-CSIC, Spain http://www.utm.csic.es

  2. Operational Issues Logistic Issues Technical Issues Training & mobility Investment strategies

  3. Logistic Issues • Coordination of fleet scheduling • Reduce long transits (barter system) • Chartering for spare ship time • Transport and Customs • Liability, insurance

  4. Operational Issues • Instrument Operations • Operational safety, protocols • Standardization (connectors, cables, etc) • Interoperability, exchange large equipment, manoeuvring • Good practice, clear rules for everybody. Hierarchy.

  5. Technical Issues • Instruments mobilization • Equipment check • Maintenance & calibration • Mobilization; Proper Planning • Logistics (safety, legislation, customs…)

  6. Control System Technical Issues • Harmonization of Data Acquisition systems • Containerized dedicated labs

  7. Training & mobility • Use of transits for training / cross-training • School at sea • User manuals • Technical stages • Mobility of technicians and large equipment (deep tow, ROV, AUV)

  8. Investment Strategies • Common strategies for long term investments on costly equipment • International cooperation in cost sharing for the construction and operation of ships (regional) and rare equipment • Facilitate equipment availability using Large Scale Facilities

  9. Conclusions • Needs for a multiyear plan cruises • New building strategy specially for regional ships • Technicians training activities and recruitment of young • Procedures to share (reduce) costs of transportation