An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTERCITY PASSENGER RAILNORTHEAST UPDATE AASHTO – FEBRUARY 29, 2012

  2. Northeast RegionHSIPR UPDATE • Criticality of NEC mainstem and feeder lines • Essential role of high speed rail corridors • Northeast funding status • NEC Commission • FRA Service Development Plan and EIS • New England Compact

  3. New Haven-Hartford-Springfield Rail Program Program Update

  4. NHHS Rail Program Recap • Program Goals: • Enhanced regional rail service • Frequent service in the peak hours • Seamless connections to Amtrak & Metro North • Continued growth in local freight rail service • Long Term Vision • 25 Round Trip Trains • Additional connections to Boston, and Montreal • 30 minute, bi-directional, peak hour service • Hourly off-peak service • Start-up Service – 2016 • 17 Round Trip Trains • 45 minute frequency in the peak hour, hourly off-peak • Bi-directional service south of Hartford

  5. The NHHS Rail Corridor • Owner/Operator: Amtrak • Length: 62 miles • Infrastructure Conditions • Structures over 100 years old with severe drainage problems • Double-tracked until 1980s with 12’-6” track centers • 23.3 miles of double track • 38.7 miles of single track • Hartford Viaduct: 1888 • Connecticut River: 1905 • At-Grade Crossings: • 35 public crossings • 13 private crossings

  6. Modernizing the NHHS Infrastructure • Track & signal improvements: 44.5 miles of new double track, signals & PTC • Structures & drainage upgrades: 125 deficient structures • At-grade crossing upgrades to meet Quiet Zone standards • Station enhancements: high-level platforms & parking • State-of-Good-Repair improvements: Hartford Viaduct & Conn River Bridge

  7. NHHS Corridor Springfield Union Station (Amtrak) Enfield Windsor Locks (Amtrak) Windsor (Amtrak) Existing Stations Hartford Union Station (Amtrak) West Hartford Newington Berlin (Amtrak) Meriden (Amtrak) Wallingford (Amtrak) North Haven New Haven State St. Station New Haven Union Station (Amtrak)

  8. Current Funding Status • Preliminary Program Cost: $647 million • Does not include: future stations; new trains; upgrades to the Connecticut River Bridge or Hartford Viaduct • Funding Awards & Bond Proceeds Available to Date: $471 million • Meriden-Berlin: $40 million in Federal funding • New Haven-Hartford: $121 million in Federal funding • Hartford-Springfield: $30 million in Federal Funding • State Funding: $280 million in bond authority • Additional Annual Funding Opportunities • Future FRA or FTA funding

  9. Phasing NHHS Improvements • Work has Been Phased To Match Funding Availability • FRA awarding grants as funding becomes available • Each grant requires projects with Independent Utility • Current Phases • Phase 1: Meriden-Newington (ARRA: obligated) • Phase 2: New Haven-Hartford (FY 2010: awarded) • Phase 3A: Hartford-Windsor (ARRA: obligated) • Phase 3B: Windsor-Springfield (unfunded) • Phase 4: Regional Rail Upgrades (unfunded) • Phase 5: Ongoing State-of-good-repair Upgrades (unfunded)

  10. Phasing NHHS Improvements • Phase 1: Meriden-Newington • Adds 10.2 miles of second track between Meriden and Newington • Cost: $60 million • $40 million Federal; • $20 million State) • Funding fully obligated Berlin (Amtrak) Meriden (Amtrak)

  11. Phasing NHHS Improvements Springfield Union Station (Amtrak) Windsor Locks (Amtrak) • Phase 2: New Haven-Hartford • Adds all new track, signal, bridge and station infrastructure for additional service between New Haven and Hartford • Adds new service during peak morning/evening rush hour • Cost: $262 million • $121 Federal • $141 State • Funding Awarded, Awaiting Obligation Windsor (Amtrak) Hartford Union Station (Amtrak) Berlin (Amtrak) Meriden (Amtrak) Wallingford (Amtrak) New Haven State St. Station New Haven Union Station (Amtrak)

  12. Phasing NHHS Improvements Springfield Union Station (Amtrak) • Phase 3A: Hartford-Windsor • 7.5 miles of double track/sidings • Structure repairs • New signal system/PTC extending from Hartford to Springfield • 9 at-grade crossing upgrades • New interlocking • Cost: $43 million • Federal: $30 million • State: $13 million • Funding fully obligated Windsor Locks (Amtrak) Windsor (Amtrak) Hartford Union Station (Amtrak) Berlin (Amtrak) Meriden (Amtrak) Wallingford (Amtrak) New Haven State St. Station New Haven Union Station (Amtrak)

  13. Phasing NHHS Improvements Springfield Union Station (Amtrak) Windsor Locks (Amtrak) • Phase 3B: Windsor-Springfield • Complete double track/sidings to Springfield • Structure repairs • Station Upgrades at Windsor and Windsor Locks • Upgrade remaining at-grade crossings • New interlockings • Environmental Assessment Underway • Efforts underway to secure funding Windsor (Amtrak) Hartford Union Station (Amtrak) Berlin (Amtrak) Meriden (Amtrak) Wallingford (Amtrak) New Haven State St. Station New Haven Union Station (Amtrak)

  14. Phasing NHHS Improvements Enfield • Phase 4: Regional Rail Upgrades • Constructs four new NHHS stations (North Haven; Newington; West Hartford; Enfield) and adds a platform to the State St. Station • New train equipment • Environmental Assessment Underway • Efforts underway to secure FTA funding West Hartford Newington North Haven New Haven State St. Station

  15. Phasing NHHS Improvements • Phase 5: Ongoing State- of-Good-Repair Program • Repair Hartford Viaduct and Connecticut River Bridge • Upgrade other structures and facilities as required

  16. Phase 5: State-of-Good-Repair Program • Scope: • Hartford Viaduct • 20-year renewal • Long-term relocation • Assessment underway • Connecticut River Bridge • Rehabilitation/replace center truss • Double track • Ready for Preliminary Engineering • Bridges/culverts in existing 2-track areas 18

  17. Program Benefits • Fast, Convenient Regional Transportation • Connects/integrates regional transportation across New England • More frequent service • Faster service • Creates Engine For Local Economic & Station Area Development • Construction-related & long-term job growth • Provides the connections to livable communities along the rail line • Establishes An Interconnected Intermodal Transportation System for Connecticut’s Future • Metro North – Shoreline East • Amtrak – Local bus services • Busway – Bradley International Airport

  18. Key NHHS Dates 2012 February: Publish Environmental Document, complete Preliminary Design Phase 3A March-June: Complete Preliminary Design Phase 2 June: Final Design in progress for all funded phases August: initiate Amtrak signal cable replacement /PTC September : Submit DEEP and USACE permit applications 2013 Receive permits; start construction on grade crossings, bridges, and culverts 2014 Start Station Construction 2015Installation of new track 2016Initiate start-up service