1 / 25

Systematic Transfer in TIDE

Systematic Transfer in TIDE. TIDE Workshop on Training and Exchange Stuttgart, 12-13 November 2013. Prof Nick Hounsell, Transportation Research Group University of Southampton, UK. Outline . Introduction to Systematic Transfer Introduction to TIDE transferability methodology

jamar
Télécharger la présentation

Systematic Transfer in TIDE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Systematic Transfer in TIDE TIDE Workshop on Training and Exchange Stuttgart, 12-13 November 2013 • Prof Nick Hounsell, Transportation Research Group • University of Southampton, UK

  2. Outline • Introduction to Systematic Transfer • Introduction to TIDE transferability methodology • Transferability methodology step-by-step

  3. Concept of transferability • Transferability • A process of verifying the chances of a successful implementation of a measure from a pioneer city to the adopting city at an operational or implementation level • Pioneer city • A city where an innovative measure is successfully implemented • Adopter city • A city which wish to implement an innovative measure that is successfully implemented in a pioneer city

  4. Context conditions • Therearenocitieswithexactly the same contextconditions. • Differencescanincludetransport/rafficconditions (demand, supply, infrastructure, trafficcontrol/management, etc.), geographical,environmental, demographic, socio-economic and culturalbackgroundsaswellasinstitutional and legal frameworks. • So we must identifythosecontextconditionswhicharekeyto the measure‘ssuccessand which must also beaddressed in anynewlocation – orwhichhavecreatedbarrierstosuccessso thattheycaneitherbeovercomeortransferabilityavoidedwhere such factorsexist.

  5. Advantages of systematic transfer • Systematicapproachtoinnovation • Reducestheriskofbaddecisionmaking • Feasibility check at an earlystage • Clearerdefinitionofmeasures – Whatexactlyisitthatwewanttotransfer? • Comparabilitybetween different Innovative Measures • Don‘thavetoreinventthewheel • Costsavings • Learnfromthemistakesofothers • The processitselfleadstostakeholderand expert involvement

  6. TIDE Transferability Methodology • A systematic qualitative methodology to analyse the potential transferability of an innovative transport measure from one city to another. • Designedtomaximise the usabilityforpractitioners in European cities. • A ‘Handbook for transferability analysis in urban transport and mobility’ will be produced by the cities involved in TIDE, for wider use

  7. Source: Dziekan et al, 2013

  8. (1) Mission statement/objectives and scoping (2) Clarification of the impacts of the measure (3) Identification of up-scaling/down-scaling need (4) Identification of the main components and sub-components (5) Identification of the level of importance of components (6) Assessment of the situation in the adopter city (7) Conclusions The 7 step Methodology

  9. Example Pioneer city Adopter city Advanced public transport priority London Southampton Source: www.londonphototours.com/big_ben.htm Source: www.lbbc.co.uk

  10. Step 1: Mission statement and scope • A clearly defined mission statement (or clear objectives) and a realistic scope for a measure • Should avoid any misunderstanding during the subsequent transferability and implementation processes • The following transferability steps should only be carried out after the adopter understands and agrees with the objectives and scope of the measure

  11. Mission statement (buspriority) • To provide priority to buses at traffic signals to improve their regularity • Scope • ‘Differential’ bus priority only. It does not cover the traffic signalling system itself.

  12. Step 2: Impacts: Generic (Examples) • Efficiency (capacity, journey time) • Environment (emissions, noise, visual intrusion) • Safety • Accessibility • Vehicle occupancy • Benefit-to-cost ratio (BCR) • Multi-Criteria Analysis (MCA)

  13. Impacts (bus priority) • Improve bus regularity • Improve bus journey time • Reduce passenger waiting time • Reduce bus overcrowding • Increase bus patronage • Increase bus revenue • May reduce bus operating costs and emissions • May increase delay to general traffic • Provide a good economic return (cost-benefit)

  14. Source: Dziekan et al, 2013

  15. Scaling (bus priority) • Southampton is much smaller than London and hence needs down-scaling of the implementation • This may have implications on system requirements, costs and benefits. • Note also: Southampton has a different model of bus • operations.

  16. Step 4: Main components & sub-components • Factors that can contribute to the success(or failure) of a measure : • Components (main factors): • - Policy, stakeholders, finance, technical requirements, etc. • Sub-components e.g. for policy: • - Public transport policy, traffic management policy, accessibility policy, pollution reduction policy

  17. Main components & sub-components (bus priority)Examples

  18. Step 5: Level of importance of sub-components • According to the pioneer city • High/medium/low • Supporting comments

  19. Level of importance of sub-components (bus priority)

  20. Step 6: Assessment of the situation in the adopter city • Subjective assessment of ease/difficulty in implementation by adopter city • Assessment scale: • +2 strong support for transferability • +1 modest support for transferability • 0 neutral • -1 modest constraint for transferability • -2 strong constraint for transferability

  21. Assessment of components (bus priority)by the adopter city

  22. Step 7: Conclusions • Drawing conclusions through the assessment • • One or more strong constraints (-2) to transferability • - no transfer unless the conditions can be overcome • • One or two modest constraints(-1) (no strong constraints) • - difficult to transfer the measure unless the conditions can be addressed • • If there are no constraints at all • - likely that the measure could be successfully transferred

  23. Conclusions (bus priority) • The measure is potentially transferableto Southampton dependent on: • Cost of the system – this could be justified by improved bus operations and the benefits associated with it (e.g. journey time/waiting time benefits, increased patronage) • Bus operators’ support – operators may need convincing!

  24. Source: http://farm3.staticflickr.com/2829/9719701724_53b5de8a10.jpg

  25. Thank you! • Nick Hounsell • N.B.Hounsell@soton.ac.uk Transportation Research Group